A swim spa of this size is not a catalogue purchase. Before we can price Outdoor Swim Spa WS-130AⅣ-U properly, we need to know where it is going, how it will be supported, what water and power are available on site, and which options you want included. This page explains exactly what information to send so your quotation comes back accurate the first time, rather than a placeholder figure that changes later.
What You Are Asking Us to Quote
WS-130AⅣ-U is one of the larger configurations in our configurable outdoor swim and hydrotherapy range. The catalog lists it at 8000 × 3000 × 1400 mm, with a shell footprint that needs clear access for delivery and craning or placement on site. The specification sheet we captured for this model shows 23 jets served by 4 water pumps, 1 filter pump, 5 LED lights, one control system and total power of 11.85 kW.
Those figures describe the catalog version. Your quotation is built from the version you actually order, which is why we ask for the details below instead of quoting straight off the product page.
| Model | WS-130AⅣ-U |
| Catalog dimensions | 8000 × 3000 × 1400 mm |
| Jet total | 23 pcs |
| Water pump / filter pump | 4 pcs / 1 pc |
| Control system | 1 set |
| LED lights | 5 |
| Total power (catalog) | 11.85 kW |
| Features shown | Water jets, LED lighting, Ozone |
Information to Include in Your Enquiry
1. Site and access
- Delivery address, and whether the site is a private villa, a resort or hospitality project, or a development under construction.
- Where the spa will sit: terrace, garden, podium deck, sunken pit or indoor room. Include floor level and, for upper floors, the load capacity your engineer has confirmed.
- Access route from the truck to the final position: gate width, overhead obstruction, lift or crane availability.
- Whether you want steps, and which side they should face once the unit is placed.
2. Services and utilities
- Electrical supply available on site: voltage, phase, and the dedicated circuit capacity your electrician can provide. Total power rises when a heat pump or extra pumps are added, so we size this with you rather than assuming.
- How the spa will be heated: heat pump, existing boiler or house system.
- Drain and water supply points near the intended position.
- Water treatment preference: ozone is shown on this model; UV sterilization and sand filtration are options we can add.
3. Options and finishes
- Catalog-listed extras for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Tell us which you want quoted as included.
- Insulation level matters for running cost in cooler climates; tell us the coldest month at the site.
- Cabinet or cladding finish if you want the exterior matched to surrounding terrace work.
4. Commercial terms
- Quantity, and whether this is a single villa unit or part of a wider turnkey interior project solution where we also supply other furniture and building materials.
- Preferred delivery terms and destination port or door-to-door address. We arrange freight by sea, air and rail with customs paperwork handled on our side; state which you prefer.
- Any installation support you want from us on site, versus local contractors you will appoint.
How the Quotation Comes Back
Send the details above and we reply with an itemised quotation: the spa in your chosen configuration, each option priced separately, packing and freight to your named destination, and any installation and after-sales support you ask us to include. Because the options are shown as separate lines, you can remove or add items without receiving a new headline price with no explanation.
Where a figure depends on something not yet confirmed, we mark it as pending instead of guessing. Electrical requirements in particular are stated for the selected configuration, so your electrician can prepare the supply before delivery rather than after.
Ordering Beyond a Single Unit
If the spa is one element of a larger fit-out, we handle it as part of our one-stop furniture and building materials supply, coordinating production and shipment with the rest of the package. Where an outdoor area needs a shape or size the standard models do not cover, our customizable shape outdoor spa can be built to a bespoke layout for gardens, terraces and leisure areas.
Send your enquiry. Include the site, access, power supply and the options from the list above, and we will return an itemised quotation for Outdoor Swim Spa WS-130AⅣ-U. Browse the wider range in swimming pools and swim spas first if you are still comparing sizes.