A wall panel quote is rarely a single number. It is the result of size, finish, substrate, quantity and delivery details being read together. If you are specifying modern decorative wall panels for interior decoration in a villa, hotel or office fit-out, this guide sets out how the request is made, what information to send and what should come back in the quotation.
How the Request Is Started
Send your measured drawings and finish reference through our contact page, by email or by phone, and state the room and the destination address in that first message. Our team reviews the specification against the wall condition you describe, then replies with panel options, sample guidance and a priced proposal your design team or main contractor can work from.
Why Identical-Looking Panels Receive Different Prices
Two projects can both ask for a feature wall with a stone-look surface and still need very different products. The visible face is only one part of the specification. Panel thickness, the core structure, how the edges are finished, whether the surface has to resist being wiped down daily, and whether the panels have to travel overseas in a container all change what is made and what it costs.
Our decorative wall panels are made as an interior wall covering for renovation work. The surfaces simulate stone, wood, fabric and other effects so that a design scheme can be matched rather than forced into a standard catalogue size. They are lightweight and stable, and they can be cut and assembled on site with ordinary trade tools, which is why they suit fast refurbishment as well as new build. Because dimensions, colours and surface patterns are set per project, we quote from your drawing rather than from a fixed price list.
What to Send With Your Enquiry
Send the following in one message. A complete enquiry usually comes back with an accurate quotation; an incomplete one turns into several rounds of email and delays your programme.
| Item | What we need to see | Why it matters |
|---|---|---|
| Location and room type | Villa living room, bedroom background wall, hotel lobby, restaurant, office, showroom or retail store | Traffic level and exposure decide the surface and fixing detail you should be quoted |
| Measured area | Panel-by-panel sizes in millimetres, plus total square metres and any openings, niches or corners | Panels are made to size; a rough floor area produces a rough price |
| Surface and colour | A reference image, sample number or physical sample, with the finish you want (stone look, wood look, fabric look, 3D relief) | Texture depth and coating process differ between effects |
| Panel format | Preferred panel width and thickness, or tell us the wall condition and we will propose it | Large-format sheets need different handling and substrate preparation than narrow strips |
| Quantity | Total square metres plus any spares for future maintenance phases | Batch consistency and freight both depend on knowing the full quantity |
| Substrate condition | What the wall is currently made of, and whether it is flat, damp or already clad | Determines the preparation and fixing method specified for site |
| Destination and delivery term | Port or site address, and your preferred Incoterms | Packaging, container loading and freight are calculated per destination |
| Programme dates | Required on-site date and any phased handover | Production is scheduled against the date panels must be on site |
Choosing Between Panel Types Before You Ask for a Price
It helps to name the family of panel you want, because the same wall can be solved in more than one way.
- Flat decorative panels for interior decoration. The standard choice for background walls and feature surfaces in villas, hotel lobbies, restaurants and offices. See Modern Decorative Wall Panel for Interior Decoration.
- 3D relief panels. Where the design wants shadow and depth rather than a printed effect, our luxury decorative 3D wall panel is lightweight, easy to cut and specified for living rooms, TV background walls, hotel lobbies and offices. Custom size, colour and pattern are accepted.
- Panels for humid interiors. For bathrooms, spa areas and kitchens, the surface and core need to tolerate moisture and frequent cleaning. Decorative wall panels for interior home decoration are described as moisture resistant, stain resistant and easy to clean, which is why they are used in villa and hotel interiors rather than only in dry rooms.
- Cladding where the panel also has to work as a building element. For facades, curtain walls and large commercial partitions, an aluminium honeycomb panel keeps flatness and rigidity at large dimensions while staying light, and can be produced with stone veneer, solid coating or a perforated face.
- Built-in paneling that runs with joinery. If the wall has to sit flush with doors, niches and storage, look at wall panel systems so that paneling and cabinetry are quoted as one package.
How the Quotation Is Prepared on Our Side
Once your drawing and finish reference reach us, the process follows the same steps we use on every project: a design and specification review, material selection and product specification, then a quotation with the details confirmed before production starts. Under our custom and OEM service we can also match bespoke finishes and textures, produce 3D models and prototypes for approval, and work to flexible minimum order quantities when a scheme needs a short run rather than a full container.
The quotation you receive should state the panel specification, the finish reference, the quantity in square metres, the packaging method, the delivery term and the production window. If any of those are missing, ask for them before you compare suppliers — that is usually where two very different prices come from.
Ordering Samples Before You Commit
Always order samples of the finishes on your shortlist. A photograph cannot show how a surface reads under a project's lighting, and it cannot show how a relief panel behaves once joints are set out on a wall. When you request samples, tell us the room and the lighting condition so that we send panels in the finish family you are actually considering.
Before any sample leaves the workshop, note that technical specifications, certifications and performance figures should be confirmed for your specific project. Marketing descriptions on product pages are not a substitute for a written specification signed off by your design team, and requirements differ between markets.
Delivery, Installation and What Happens After Handover
Panels travel by sea, air or rail with the freight forwarding, customs paperwork, packaging and container loading arranged as part of the order, and door-to-door delivery to a port or site address is available. On arrival, panels are cut and fixed on site; we provide project design coordination, drawings and on-site guidance so that the fixing method specified in the quotation is the one your trades follow.
If your project also needs cabinetry, wardrobes, doors, flooring, lighting or furniture, ask for those to be quoted alongside the wall panels. Coordinating them with one wall and cladding and fit-out package reduces the number of separate finishes that have to be matched on site.
A note on quantities: order panels for the whole phase you can see, including spares for rooms that will be refurbished later. Later batches are produced separately and can vary slightly from the original surface, which matters most on large feature walls.
Frequently Asked Questions
Can I get a price from a floor plan alone?
You can get an indicative figure, but not a firm one. Panels are made to size, so we need the measured wall dimensions and the finish reference before the number is reliable.
Do you make non-standard sizes?
Yes. Dimensions, colours and surface patterns are customised per project, which is the normal way these panels are ordered for villa and hotel work.
What if my wall is not flat?
Tell us in the enquiry what the substrate is and how far out of true it sits. Substrate condition decides whether the fixing detail is a direct bond, a battened system or preparation work carried out before the panels arrive.
Can you supply the panels with other fit-out items?
Yes. Wall panels are frequently ordered together with cabinetry, doors, wardrobes, flooring and lighting as one project package, which is how our turnkey villa, hospitality and office projects are coordinated.
How do I confirm the quotation once it arrives?
Check the panel specification, finish reference, quantity and delivery term against your drawings, then confirm the details in writing. Production starts after that confirmation, so any change to size or finish is cheaper to make at this stage than after the panels are made.
To request a quotation, send your measured drawings, the finish reference and the destination address to SANTERSON. Our team reviews the specification and replies with panel options, sample guidance and a priced proposal you can put in front of your client or main contractor.