Flush wall aligned doors are one of those details that decide whether a minimalist interior reads as resolved or as a series of unfinished edges. Because the leaf sits level with the finished wall and the frame is hidden inside the build-up, the result depends on information that is fixed before production starts — not on site adjustments. This guide sets out what to send us so the quotation you receive matches what will be delivered and still opens and closes correctly years later.
Our Flush Wall Aligned Doors are made to measure for residential and hospitality projects, with material, finish and layout specified per project. There is no standard catalogue size to fall back on, which is precisely why the enquiry stage matters.
What makes a flush door a separate quotation item
A conventional interior hinged door can absorb small deviations: the architrave covers the gap, and the fitter scribes the lining to a wall that is a few millimetres out. A concealed door has no such tolerance. The hinge pockets, the hidden frame, the door leaf thickness and the wall build-up all have to agree with each other before a single panel is cut. Three consequences follow, and they are the reason we quote these doors project by project:
- The opening is defined by us, not by the builder. The rough opening, reveal depth and floor level must be set out to our drawings, because the frame is buried in the plasterboard or masonry build-up.
- Finish continuity has to be planned. If the leaf is to be finished in the same paint or wall covering as the surrounding surface — as with our Handleless Concealed Doors — the substrate and preparation method must be specified at quotation stage.
- Hardware is part of the assembly, not an accessory. Hinges, floor spring or pivot, lock and the adjustment range are quoted together with the leaf and frame, so a competing price that looks lower often omits them.
The information to send in your enquiry
Send the following. Where you do not yet have an answer, say so explicitly — an unknown is manageable at this stage, a wrong assumption is not.
| Item | What we need | Why it changes the price |
|---|---|---|
| Opening dimensions | Width and height of the finished opening, plus the wall build-up depth (the total thickness from one finished face to the other), and the clear floor finish level. | Determines leaf size, frame depth and whether an extension profile is needed. |
| Wall construction | Plasterboard on studs, masonry, or a clad surface — with the make-up of each layer where known. | Sets the frame type, anchorage method and the adjustment range we build in. |
| Door type and swing | Single or double leaf; left or right hand; inward or outward opening; whether the door will normally sit open or closed. | Double leaves, opposite-hand pairs and reverse swings are different assemblies. |
| Surface finish intent | Paintable leaf, veneered leaf, lacquered colour, or a leaf to take the same wall covering as the surrounding surface. | Veneer and lacquer leaves are finished in our factory; paintable and cover-matched leaves are supplied prepared for site finishing. |
| Hardware schedule | Hinge type and count, floor spring or pivot, lock or privacy set, handle or handleless push-open, door closer if required. | Concealed hinges and floor springs carry most of the leaf weight and are priced per opening. |
| Quantity and schedule | A door schedule listing each opening by room or zone, with quantities, plus the installation sequence for the project. | Openings grouped in one batch are produced together; splitting them means separate production runs and separate freight legs. |
| Project location and delivery point | Site address and delivery access, plus whether you want the goods delivered to site or arranged from port. | Sets packing method, container loading plan and how far our logistics team takes the shipment. |
| Drawings and context | Floor plans, elevations showing the doors, wall sections where available, and photographs of a similar detail you want matched. | Lets us flag clashes with skirting, cornices, lighting, switches and panelling before they reach site. |
Choosing the operating style before you ask for a price
The concealed-door family covers several mechanisms, and the choice affects both cost and the wall build-up. Compare them on your drawings before sending the enquiry:
- Flush hinged — the familiar swing on concealed hinges, with the leaf sitting proud or rebated to the wall face. Our Flush Hinged Doors suit standard room entrances where a handle is acceptable.
- Flush sliding — the leaf runs parallel to the wall on a concealed track. Useful where swing clearance is unavailable, such as in front of a wardrobe run or in a tight corridor.
- Pocket — the leaf disappears into the cavity. This needs a deeper stud build-up than a hinged frame, so confirm the wall thickness before committing to it.
- Folding — bi-fold leaves for cupboards, plant closets and store rooms opened infrequently, where full-height access matters more than a single clean face.
If you are weighing concealed doors against other openings in the same specification, our Flush Sliding Doors and Classic Pocket Doors pages show the alternatives with their own dimension requirements.
How the quotation is prepared and confirmed
Once the enquiry above is complete, the process follows the same sequence we use for all made-to-measure joinery:
- Review and clarification. We read the schedule against the drawings and come back with specific questions — usually about floor finish levels, wall build-up, or hand of swing. Expect this round; it prevents change orders later.
- Quotation. Priced per opening by type and size, with hardware itemised separately so substitutions are visible rather than buried in a lump sum.
- Shop drawings for sign-off. Dimensioned drawings of each opening, showing frame depth, leaf thickness, hinge positions and the finished face line. Production does not start until these are approved in writing.
- Production and inspection. Leaves, frames and hardware are produced as matched sets per opening and packed accordingly, with each set marked to its schedule reference.
- Packing and shipment. Panels are protected edge-to-edge and loaded to a plan that matches your installation sequence, so the openings needed first arrive where they can be unloaded first.
Where these quotations usually go wrong on site
- Floor finish level left undecided. A door ordered against structural slab height will be too long once the screed and final floor covering are laid. Quote from finished floor level, and state it as such.
- Wall build-up measured before the second face is closed. The reveal depth must include plasterboard, adhesive, render or cladding on both faces — not just the stud cavity.
- Hardware chosen after the leaf is made. Concealed hinges and floor springs have load ratings and mortise positions. Specifying them late means a different leaf.
- Skirting, cornice or switch layout ignored. A flush door with no architrave meets skirting directly; that junction needs a decision on the drawing, not on site.
- Paint and wall covering assumed to match. Factory paint and site-applied finish rarely read identically. Decide at quotation stage whether the leaf arrives painted or prepared for site finishing.
- Doors ordered separately from panelling. Where a concealed door sits inside a panelled field, ordering the two apart breaks the joint line and splits what should be one production batch.
Ordering doors as part of a wider fit-out
In most villa and hospitality projects we supply, concealed doors are one line among many: built-in kitchen cabinets, wardrobes, panelling, flooring and joinery all share the same wall lines and the same finish palette. Buying them from one manufacturer keeps those interfaces consistent — the door leaf, the adjacent wardrobe return and the wall panel are produced to a common datum and in one batch.
That is the working model behind our Turnkey Interior Project Solutions: one specification, one production schedule, one shipment plan. Our Custom Furniture Manufacturer service covers bespoke sizes, materials and finishes for exactly this reason — including prototyping and sample approval before the full batch is cut. If your drawings are still developing, our Interior Design Services team can work through layout, elevations and 3D visuals with you first, so the door schedule you send us is already coordinated with the rest of the joinery.
A short pre-enquiry checklist
- Finished floor level stated for every opening.
- Wall build-up depth measured face to finished face.
- Door schedule with quantities, hand of swing and swing direction.
- Finish intent confirmed: factory-finished or site-finished leaf.
- Hardware list per opening, including load rating where the leaf is tall or heavy.
- Drawings attached — plans, elevations, sections if available.
- Site address and delivery access, with your preferred delivery arrangement.
- Installation sequence noted, so packing follows it.
Send that package and the quotation comes back itemised, comparable between options, and — more importantly — buildable without a change order. If any item is still open on your drawings, mark it as open and we will work through it with you rather than assume.