A double roof hardtop aluminium gazebo with privacy curtains is rarely bought off the shelf. Resorts, villa owners and club operators need a shelter that fits a specific patio footprint, matches an existing outdoor dining set and suits local weather conditions. That means the price has to be built around your drawings and your site, not taken from a fixed catalogue line. This guide sets out what to send us so the quotation comes back accurate the first time.

What the product actually is

Our Double Roof Hardtop Aluminum Gazebo with Privacy Curtains is a semi-outdoor pavilion built on an aluminium frame with a rigid metal hardtop in two tiers. The air gap between the upper and lower roof lets hot air rise and escape, so the floor area underneath stays more comfortable in strong sun than it would under a single-layer top. Because the roof is metal rather than fabric, it sheds heavy rain and wind load without the frequent canopy replacement that soft-top structures require.

The privacy curtains are part of the same system. Draw them back and the pavilion reads as an open terrace; close them and the same footprint becomes a screened, private dining room. Project teams typically place one beside a pool, at the end of a courtyard, or on a club lawn, then pair it with an outdoor dining set to create a self-contained eating space. Typical settings we supply for include resort outdoor restaurants, villa backyards, club terraces and hotel leisure courtyards.

Information to have ready before you ask for a price

The faster route to a firm number is a complete brief. Send what you already have; we will fill the gaps with you during the consultation stage of our turnkey project solutions.

Item to confirmWhy it changes the quote
Overall footprint and clear heightSets the frame size, roof panel area and foundation detail. A 3 m x 4 m pavilion and a 6 m x 8 m dining pavilion are different structures, not scaled versions of each other.
Site conditionSlab, deck, lawn or poolside paving determines the anchoring method and whether a base frame is needed.
Frame finishPowder-coat colour is chosen per project so the posts match railings, louvers or facade metalwork on site.
Curtain fabric and colourAffects price and how the pavilion looks from the terrace. Outdoor-rated fabric with a specified colour code should be named in the enquiry.
Curtain configurationWhich sides get curtains, and whether they run on tracks or tie-back poles.
Roof detailTier spacing, roof pitch and any gutter or downpipe arrangement for the double-tier top.
Quantity and phasingOne pavilion for a villa and six for a resort pool deck are quoted differently, especially if delivery is staged.
Destination and delivery termsPort of entry, inland distance and whether you want door-to-door delivery or port-only terms.
Matching furnitureDining tables, chairs, loungers and swings ordered in the same container share freight and simplify site coordination.

Drawings, photos and reference images speed everything up

A marked-up plan is worth several rounds of email. Send any of the following:

  • A site plan or sketch with dimensions in metres, including the position of columns, trees, pool edges and overhead lines.
  • Photos of the intended location from two or three angles, taken in daylight.
  • The architect's elevation or landscape drawing if one exists, even at concept stage.
  • A finish reference: a RAL or Pantone code, a sample photo of existing metalwork, or a fabric swatch number.
  • Mood images showing the atmosphere you want around the curtains and interior layout.

How our custom and OEM process works

Dimension, frame finish and curtain colour are adjusted to project requirements as standard. Where a project needs something beyond that, our custom and OEM service covers bespoke design and prototyping, material and finish selection, flexible minimum order quantities, and brand customisation for operators who want their own label on the specification.

Send your brief, we come back with a proposal and quotation, you confirm the details, then production and shipment begin. Nothing goes into production before the specification sheet is approved by you.

For enquiries that cover more than the gazebo, such as a poolside pavilion plus dining sets, loungers and cabana daybeds for the same resort phase, we coordinate the package as one order under hospitality furniture and building materials supply. Specification, production scheduling and shipping then run through a single order instead of several suppliers.

What a written quotation should contain

Before you compare prices from different sources, check that each quotation answers the same questions:

  • A dimensioned drawing or specification sheet for the exact pavilion being priced.
  • Frame profile and finish, roof panel construction, and the curtain fabric named by type and colour code.
  • Hardware list: tracks, brackets, anchors, fixings and any base frame.
  • Packaging method and container loading plan for your quantity.
  • Delivery term and destination, stated explicitly.
  • Assembly requirements on site, including foundation or slab preparation you are responsible for.
  • Payment terms and production schedule after the detail confirmation.

A quote that lists only a size and a price cannot be compared with one that names fabric codes and hardware. Ask for the specification sheet and compare like with like.

Delivery, installation and after-sales on the same order

Freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery are part of our logistics service. Import duties, taxes and permit requirements differ from country to country, so check those with your own customs broker before shipping; we provide the commercial paperwork rather than advise on local import rules.

After arrival, installation and after-sales support covers on-site assembly guidance, inspection of the completed structure, spare parts for wear items such as curtain panels and fixings, and maintenance advice over the life of the structure. For a poolside pavilion, ask us to identify which components take the most splash and UV exposure so you order the right spares with the original shipment.

Common questions before a quote is requested

Can I order one pavilion as a sample before committing to a resort phase?

Yes. Single-unit orders for villas and sample evaluations are normal. Tell us the quantity you eventually expect so the specification sheet is written once and reused.

Do the curtains come in a fixed colour?

No. Curtain colour is selected per project from our outdoor fabric range; send a colour code or swatch photo with the enquiry.

Can the frame finish match an existing pergola on site?

Send a photo plus, if possible, the original coating reference. Where no reference exists, we propose the closest match and confirm with you before production.

Will the double roof help in a hot climate?

The gap between the two roof tiers lets rising hot air vent out, which is why this design gets specified for sunny resort terraces. Comfort under the pavilion still depends on orientation, shading from nearby buildings and how much breeze reaches your site.

What if my site is not level?

Send levels or a photo of the slope. We adjust leg lengths or propose a base frame, and note the change on the specification sheet before quoting.

Send your enquiry

Prepare the footprint, site photos, frame finish, curtain colour and destination, then send them to PHILLIP at santerson@qq.com, or by phone / WhatsApp on +86-13928214007. You can also use the contact page.

With those details in hand we return a specification sheet and quotation for your double roof hardtop aluminium gazebo with privacy curtains, together with any matching outdoor furniture you want in the same shipment.