A wall-hung basin looks simple on a schedule line: one code, one quantity, one fixture. On site it is the item that exposes every coordination gap in the wet area — framing, carrier, waste, supply set-out, tapware height, tile line and mirror position. This guide uses the Wall Hung Ceramic Basin 1003B, Modern Wall Mount Bathroom Sink as the worked example and shows how to count it correctly and lock the coordination around it before purchase orders are released.

What a wall-hung ceramic basin actually requires on site

Model 1003B is fixed to the wall by its back panel, so no vanity or pedestal carries the weight. That frees up floor area and gives the clean, airy look buyers specify for villas, guest suites and commercial washrooms — but it also means the wall behind the basin becomes a structural and services item, not just a finish item.

The 1003B is made of vitreous ceramic with a glossy glaze that resists staining, limescale and yellowing, has a tapered curved outline, and comes with a tap mounting area for single-faucet installation. It is designed to pair with matching pieces in the same series, which is exactly why quantity planning cannot stop at the basin itself.

Step 1: Build the quantity list by room type, not by product

Counting fixtures from a rendering produces short orders. Count them from a room schedule instead, and let each room type carry its own bill of materials.

Room type in the scheduleItems that must appear on the same line group
Guest powder room, single storeyWall-hung basin; single lever mixer; exposed trap and waste; wall bracket or carrier plus fixing pack; mirror or mirror cabinet; towel ring; toilet paper holder
Ensuite, apartment or villa bedroom wingBasin and mixer; matching WC from the same series; shower set; vanity lighting; storage unit; robe hook; grab rail where accessibility is specified
Hotel guest bathroomBasin and heavy-duty mixer; WC; full accessory set in one finish; spare waste and trap sets for the maintenance store
Public or commercial washroomBasins in multiples of the bank layout; service-grade mixers; traps; spares; soap dispenser and hand-drying provisions that affect supply positions

Two rules keep this list honest. First, every basin line must have a matching mixer, waste and trap line — those three are the parts most often left off a ceramic order. Second, spares belong in the count from day one for hospitality and commercial work: keeping spare wastes, traps and a small number of spare basins on site avoids a colour or batch mismatch years later.

Step 2: Convert drawings into quantities without double counting

Work from the fixture schedule and confirm each entry against the bathroom elevations. For every wall-hung basin, record four numbers:

  • Finished floor level reference — the height the rim will sit at once tile thickness is added.
  • Waste position — where the waste exits and whether that route is achievable in the wall build-up.
  • Supply positions — hot and cold centres relative to the basin centreline and finished wall face.
  • Support condition — stud, timber noggin, steel frame or masonry, and whether a carrier is required.

Those four numbers are what you send with the enquiry. If they arrive after the order, they change tapware selection, framing and tile setting-out, and someone pays for rework. Where the same series continues across rooms, keep one reference drawing per room type and issue it as a single coordination sheet — that is how a 40-bathroom hotel stays consistent rather than producing four slightly different basins.

Step 3: Coordinate the basin with the rest of the sanitary suite

Ceramics are specified as a set. The 1003B is designed to sit alongside matching pieces in the same series, so decide the full suite before you commit quantities. A practical pairing example is the Washdown One Piece Toilet - Modern Ceramic 1003A Toilet for Bathroom, whose product information lists two installation types — P-trap wall drain with an 180 mm rough-in and S-trap floor drain with a 250 mm rough-in. Because the trap type changes the wall and floor build-up, it has to be fixed per room type at coordination stage, not discovered by the plumber.

Where a project mixes wall-hung and freestanding layouts — for instance wall-hung basins in guest bathrooms and a stand basin in a feature ensuite — confirm each layout against the same elevation logic. Different mounting methods mean different framing, different waste routes and different cleaning access behind and under the fixture.

Confirm these before ordering: mounting method and carrier or bracket type; supply and waste set-out relative to finished wall faces; trap type and rough-in for any paired WC; single- versus multi-faucet use; and the tile or panel line that the basin rim, mirror and accessories will align to. Model-specific dimensions and technical data should be taken from the current technical sheet for the project, because catalogue pages and detail sheets can be revised.

Step 4: Coordinate finishes and trades across the whole wet area

A wall-hung basin sits in the middle of five other decisions. Fix them together in one coordination round:

  • Wall finish. Tile, stone or panel thickness changes every dimension on the elevation. Set the finished face first, then position supplies, waste and mirror.
  • Tapware. The 1003B provides a tap mounting area for single-faucet installation, so mixer spout reach and height must suit the basin depth and rim.
  • Mirror and lighting. Mirror centre follows basin centre; vanity lighting has to clear the mirror and still light the face. See Vanity Lighting for options in this range.
  • Storage. A wall-hung layout leaves the floor clear, which is where a mirror cabinet or a slim tall unit does the work — Bathroom Sanitary Fixtures covers basins, WCs, vanities and bathroom storage in one place.
  • Accessories. One finish across towel bar, ring, holder and robe hook, ordered with the ceramics so nothing is matched later from memory.

Step 5: Order as one package and plan for delivery sequence

When basins, WCs, showers, vanities, lighting and accessories come from a single one-stop furniture and building materials supplier, the coordination sheet above becomes one purchase order instead of six. That matters for projects far from the factory: mixed shipments arrive at different times, and a bathroom cannot be closed up while one component is still in transit.

For international projects, plan the package around the delivery route rather than the catalogue. Furniture Logistics and Door-to-door Delivery covers freight by sea, air and rail with customs paperwork and container loading; ceramics are fragile, dense cargo, so packing specification, pallet layout and the unloading sequence on site should be agreed at order stage. Furniture Installation and After-sales Support covers on-site installation, inspection and snagging, which is where spare wastes, traps and accessory fixings earn their place in the original quantity.

A practical delivery rule for multi-room work: order the first room type complete as a trial set, install it, sign it off, then release the balance against that signed reference. It converts coordination drawings into something the whole trade group can see, and it protects the remaining quantities from change.

A short checklist before you raise the purchase order

  • Room schedule signed, with each wall-hung basin traced to an elevation.
  • Basin, mixer, waste and trap quantities reconciled — no orphan ceramics.
  • Support method confirmed per wall type, with brackets or carriers on the order.
  • Paired WC trap type and rough-in fixed per room type.
  • One finish schedule for tapware and accessories across all rooms.
  • Spares quantity agreed for hospitality and commercial work.
  • Trial set identified, with sign-off before the balance ships.

If you are pricing a villa, apartment or hotel package and want the ceramics coordinated with vanities, lighting, wall finishes and joinery in one specification, send us your room schedule and we will quote it as a single package. Explore Turnkey Interior Project Solutions or contact the SANTERSON team to start with your drawings.

Send us your bathroom schedule

Share room counts, elevations and finish intent, and we will return a coordinated quantity list and quotation for wall-hung basins, WCs, showers, vanities and matching accessories — produced in our own factory and delivered to site.