A swim spa is rarely bought on its own. On villa, resort and estate projects it arrives together with decking, paving, outdoor seating, planters, shading and a stack of electrical and plumbing decisions. This guide uses the Outdoor Swim Spa WS-S06 to show how buyers, contractors and project managers can build a quantity list that holds up on site, and how to coordinate the products around it so nothing has to be re-ordered after delivery.

Start With the Site Conditions, Not the Model Number

The WS-S06 is listed in our catalogue at 5820 x 2220 x 1110 mm. That footprint decides far more than where the shell sits. Before you count a single unit, fix these four items on the drawings:

  • Support structure. Whether the spa is fully recessed, partly sunk or raised on a deck changes the perimeter framing, the access hatch for equipment and the waterproofing detail at the edge.
  • Plant room or equipment bay. The specification sheet shows two water pumps and one filter pump. They need a dry, ventilated location with service clearance, not a dead-end corner behind landscaping.
  • Power supply point. Total power for this model is listed at 6.35 kW. Where the cable lands determines trenching lengths, conduit runs and which trades are on site first.
  • Circulation around the shell. Entry and exit points, steps, towel and storage locations, and drainage for deck wash-down all need clear floor space that is not blocked by furniture later.

Once those are drawn, the quantity list writes itself, because every downstream item hangs off a fixed dimension instead of an estimate.

Building the Quantity List in Three Layers

Layer 1: The spa units themselves

Count units by usage zone, not by room count. For a resort or multi-villa development, group locations by how the spa will actually be used: guest fitness and lap swimming, hydrotherapy treatment, or private family use. The same 5820 mm shell behaves differently in each case, and grouping early prevents you from mixing configurations that need different power and plant arrangements.

Then check whether the standard WS-S06 is the right variant for each zone. Our range keeps the same overall length across several builds but changes what sits inside. The table below compares the recorded catalogue data for the models most often considered alongside the WS-S06, so you can see how quickly the plant and power figures move.

ModelCatalogue dimensions (mm)Pumps (water / filter)Jet totalTotal powerFeatures shown
WS-S065820 x 2220 x 11102 / 1566.35 kWWater jets, LED lighting, Ozone, Waterfall, 4 water columns
WS-S06B5800 x 2200 x 12503 / 14813.35 kWWater jets, LED lighting, Ozone, Waterfall
WS-S06C5880 x 2380 x 14003 / 1339.95 kWWater jets, Temperature setting, LED lighting, Ozone
WS-S06CT5880 x 2380 x 14001 / 1318.35 kWWater jets, LED lighting, Ozone, Swim training system
WS-S06M5900 x 2200 x 16102 / 1486.95 kWWater jets, LED lighting, Ozone, 4 water columns

Two things in that table matter for procurement. First, the power figures are not interchangeable: a project that specifies one electrical design across all five variants will either over-build or fall short. Second, depth ranges from 1110 mm to 1610 mm, which changes excavation volume, seating height inside the shell and the safe entry detail for children or older users. If a zone needs a swim current, note that the captured specification for the standard WS-S06 does not list a swim training system, while the WS-S06CT does. Ask us to confirm the equipment list for the exact configuration you are ordering rather than assuming one variant carries another's fittings.

Layer 2: Options and consumables that arrive with the order

Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Treat each as a line item on your purchase order with a named quantity, because these are exactly the items that get missed in a tender and then bought locally at a premium:

  • Heat pump if the spa is used outside the warm months; specify whether it is supplied with the unit or sourced on site.
  • Insulation for colder or exposed sites, which affects both running load and the deck detail around the shell.
  • Steps, matched to the finished deck height rather than the catalogue dimension.
  • Filtration choice, standard filter pump or sand filtration, since plumbing routes differ.
  • Spare parts: order spare nozzles, lamp modules and consumable filters with the first delivery, while the container is already being loaded.

Layer 3: Everything that must be finished before the spa lands

Deck boards, edge restraints, waterproofing membranes, conduit and pull boxes, drainage channels, lighting circuits for the surrounding paving, and any crane or lifting gear for placement. Quantify these from your own setting-out drawings. Our role is to give you the confirmed shell dimensions, equipment positions and connection requirements so those local quantities can be taken off accurately.

Coordinating the Surrounding Products

Buyers who source through one supplier usually order the spa alongside the rest of the exterior package, because that is where coordination problems appear. Three pairings deserve attention:

Poolside seating and lounging. Frames in aluminium, rope weave and synthetic wicker with teak-look tops are the usual choices near water, and they should be specified for the same exposure level as the deck itself. Leave clear circulation to the entry steps rather than arranging furniture to look good in a render. See our Outdoor Furniture for Villas and Resorts range for the collections that typically sit around a swim spa terrace.

Shading and edge structures. A motorized louvered aluminium pergola, a hardtop gazebo or a covered daybed defines the boundary of the spa zone and affects wind exposure on the water surface. Set them out before the paving pattern is fixed, so footings do not clash with the shell excavation or the conduit runs.

Adjacent indoor spaces. On villa and hospitality projects a swim spa usually connects to a changing area, powder room or gym. Ceramics, shower systems, vanities, mirror cabinets and storage for that space come from our Interior Fixtures range, and their rough-in positions should be coordinated with the same plumbing drawings that carry the spa connections.

Where a project needs a different footprint entirely, our Customizable Shape Outdoor Spa covers bespoke shapes for gardens and terraces. For longer swim lanes with a separate relaxation area, look at the Long Outdoor Swim Spa with Hydrotherapy and Relaxation Pool, or browse the full Swimming Pools and Swim Spas category to compare shells side by side.

Sequence the Order so Nothing Waits on Site

A practical sequence, drawn from how our project orders are handled:

  1. Freeze the layout. Confirmed spa positions, deck levels, plant room location and electrical supply point.
  2. Confirm configurations per zone. Model, options list, power load and connection requirements for each unit. Written confirmation, not a model number in a spreadsheet.
  3. Issue the purchase order with option lines itemised, including spares and steps.
  4. Book local groundwork and electrical first fix against the confirmed dimensions and equipment positions.
  5. Schedule delivery to match the site programme, with packaging and container loading arranged by our logistics team, plus the commercial paperwork your customs clearance needs. Door-to-door delivery is part of our Logistics and Door-to-Door Delivery service.
  6. Plan placement, commissioning and handover checks before the surrounding furniture is installed, so snagging can happen with the deck still open.
Two points to verify in writing before you sign: the equipment list for your chosen configuration, and the electrical supply requirements including total connected load. Catalogue figures describe standard configurations; optional equipment changes them.

Send us your spa layout

Share the drawings, unit counts by zone and target site location, and we will confirm the configuration for each position, itemise the options and spares, and quote production with delivery to site. Operating since 2008 as a manufacturer of furniture and building materials, we supply swim spas alongside the outdoor furniture and interior fixtures that surround them, so one order covers the whole exterior package.