A swim spa ordered as a single line item on a purchase order is the fastest way to create a site problem nobody priced. Outdoor Swim Spa WS-115AⅢ-U is a configurable unit, and its price changes with every pump, sterilisation option and insulation package you add or drop. This guide walks through how we quantity-take the unit itself, how we coordinate it with the surrounding poolside products, and what to confirm before the order is released.
Start With the Configuration Sheet, Not the Model Number
The catalogue entry for WS-115AⅢ-U lists an external shell of 3880 × 2200 × 1250 mm, one control system, four water pumps, one filter pump, a jet total of 23 pieces, LED lighting and ozone treatment, with a total power figure of 11.85 kW. Treat those numbers as the starting point of a conversation rather than a fixed specification. The same shell is offered across the 115 series in variants that differ in what is fitted inside it.
The difference matters when you compare two units that look identical on a schedule. WS-115AⅢ, for example, carries a swim training system as part of its listed equipment and shows a different pump count and power figure from the -U version. If your project requires lap swimming against a current, that has to be stated in the specification line, because it is not implied by the shell size or the "115" prefix.
Our recommendation for procurement documents: write the model suffix exactly as quoted, then list the fitted equipment underneath it. A line that reads "swim spa, 3.8 m class" cannot be compared across quotations, and substitutions at a later stage become impossible to price fairly.
How We Quantity-Take a Swim Spa Order
For a single villa the count is obvious. For a resort, wellness floor or multi-unit residential scheme, quantity take-off has three layers, and only the first one is the spa itself.
1. The units themselves
- Count each installed position separately, even where two spas share a deck. Different positions often need different jet or lighting packages, and one mixed specification line hides that.
- Group identical configurations into one line so the manufacturer can produce them together; group different configurations into separate lines.
- State whether each unit is indoor, semi-enclosed or fully external. Insulation and cover requirements change with exposure, and the option list includes insulation as a selectable item.
2. The options that are quoted separately
The catalogue's option list for this range includes control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Each of these is a quantity in your bill of quantities, not an assumption:
| Option line | What to specify | Typical quantity basis |
|---|---|---|
| Heat pump | Desired water temperature and whether the unit runs year-round or seasonally | One per installed spa position |
| UV sterilisation / ozone | Which sanitisation route your local authority or operator requires; ozone appears in the base listing, UV is an addition | One per spa, unless the operator specifies dosing plant for several units |
| Sand filtration | Whether filtration is integral to the unit or served from a shared plant room | Per spa, or one shared system where positions are adjacent |
| Steps | Access side and finish, coordinated with deck levels | One per position, sometimes two where access is from two directions |
| Insulation | Level required for the installation climate and energy target | Per spa |
| Additional water pumps | Jet zones to be run simultaneously | As configured per spa |
3. The supporting scope you must not leave blank
- Electrical supply and protection at the unit position. A configuration shown at 11.85 kW total power is a real load, and it has to be reconciled with what the electrical contractor has already drawn. Confirm phase, circuit rating and isolation location before the deck is poured.
- Structural support and drainage under and around the shell. The catalogue depth of 1250 mm determines excavation or platform height.
- Lifting and access route from the delivery vehicle to the final position. This is a site cost that surprises most first-time buyers.
- Water fill, drain and overflow connections, and where the plant access panel will sit for maintenance.
Coordinating the Spa With the Rest of the Poolside Package
A swim spa rarely sits alone. In villa and hospitality projects we order it as part of a wider outdoor package, and coordination is where a single-supplier approach earns its keep.
Seating and lounging around the shell
The outdoor furniture range covers aluminium-frame conversation sets with teak tabletops and arm caps, all-weather wicker and rope-woven benches, sling sun loungers with adjustable backrests, and cabana daybeds with canopy and curtains. Set out these items against the 3880 × 2200 mm footprint before finalising the deck, so circulation widths and the entry side of the steps are not blocked by a lounger that arrives later.
Shade and enclosure
Hardtop aluminium gazebos and pergolas go over or beside the spa where year-round use is intended. Their posts land on the deck, so their positions have to be resolved at the same time as the spa shell — not after tiling.
Wet areas and changing rooms
Where the spa serves a gym, wellness suite or guest villa, the adjacent bathroom fit-out usually comes from the same order: ceramic basins, bidets, shower systems, and the wall and floor finishes that will take constant splash and chlorine exposure. Aluminium ceiling panels, honeycomb cladding panels and decorative wall panels are all in the catalogue and hold up better in humid rooms than untreated alternatives.
Other units in the same family
If a scheme needs more than one size, the wider Swimming Pools and Swim Spas range runs from compact 115-class shells to an 8000 × 3000 × 1400 mm configuration, so a resort can standardise on one manufacturer while varying unit size by building. Where the plan is not rectangular, a customizable shape outdoor spa in an acrylic shell can be built to square, round, oval or curved geometry instead.
A Coordination Checklist Before You Release the Order
- Model suffix on the purchase order matches the quotation, including which options are fitted and which are excluded.
- Swim training system is explicitly stated as included or not included for each line.
- Total power for the selected configuration has been passed to the electrical contractor in writing.
- Catalogue dimensions have been checked against the deck drawing, including steps and any hardtop posts.
- Sanitisation route (ozone, UV or both) is confirmed against operator or local requirements.
- Steps side, plant access side and drain location are shown on one combined layout, not three separate drawings.
- Lifting route, crane or rigging requirement and delivery lead window are agreed before production starts.
- Spare-parts contact and after-sales scope for jets, pumps and controls are recorded with the order documents.
Working With a One-Stop Supplier on This Scope
SANTERSON has been manufacturing furniture and building materials since 2008, and the swim spa is one line in a catalogue that also covers outdoor furniture, ceramics, lighting, wall panels, ceilings, cabinetry and flooring. For a project that needs all of it, that means one production schedule, one set of shipping documents and one coordination contact rather than six — which is exactly what removes most of the conflicts described above.
The service path on this site runs from design consultation and space planning through material selection and product specification, manufacturing and quality control, project management and site coordination, then installation and handover. Custom and OEM work covers bespoke finishes, prototyping and flexible order quantities, and logistics covers sea, air and rail freight with customs paperwork and door-to-door delivery.
Send us the spa positions, your preferred configuration for each, and the surrounding poolside furniture list. We will return a specification sheet per unit with fitted equipment and power figures confirmed, so your quantity surveyor prices one consistent package instead of reconciling six vendors. Reach our team through the contact page.