An outdoor swim spa on a hotel or resort site is not a single line item you can drop into an FF&E schedule the way you would a lounge chair. It arrives as a shell, a pump room, an electrical load, a water-treatment regime and a maintenance routine that the operations team inherits from day one. This guide walks through how we at SANTERSON structure the procurement of Outdoor Swim Spa WS-S06CT for hospitality projects, and which decisions have to be locked down before the order is placed rather than after the container is booked.
Where this model normally sits in a hospitality scheme
WS-S06CT is one of the configurable outdoor swim and hydrotherapy units in our range, and it tends to be specified where a property wants lap swimming or aqua-fitness without the footprint, plant room and permitting load of a full swimming pool. That usually means rooftop terraces, the deck of a boutique hotel, a serviced-apartment podium, villa-style resort clusters, and wellness or rehabilitation annexes attached to a larger property.
The catalog envelope is 5880 × 2380 × 1400 mm. Treat those numbers as the starting point for setting-out only. What matters on site is the working clearance around the unit for the filter pump, control system and any heat pump you add, plus an access route wide enough to move a 5.9 m shell from the delivery vehicle to its final position without dismantling a fence or a glazed facade. We ask project teams to send a plan view with the intended location marked before quotation, because crane access versus a side clearance changes both the price and the programme.
Reading the specification as an operator, not a shopper
The published figures below are what our catalog shows for this model. They describe a reference configuration, so the quotation you sign should restate them against your own selection.
| Catalog item (WS-S06CT) | Shown value | What to check for your project |
|---|---|---|
| Dimensions | 5880 × 2380 × 1400 mm | Structural loading on a deck or slab, drainage falls, and the access route for delivery and future removal. |
| Jet total | 31 pcs | Jet layout against how guests actually use the water: therapy seating positions versus a swim counter-current. |
| Swim training system | 1 set | Whether the property wants lap swimming as a selling point, which drives pump sizing and water depth at the swim end. |
| Water pump / filter pump | 1 pc each | Filtration cycle time against expected daily bather count, not an assumed domestic duty. |
| LED lights | 4 | Switching and dimming integrated with the terrace lighting scheme, so night operation is not a separate circuit surprise. |
| Total power | 8.35 kW | Confirm the connected load, supply phase and protection with your electrical engineer for the selected configuration. |
| Features shown | Water jets, LED lighting, Ozone, Swim training system | Ozone reduces but does not replace disinfection; agree the chemical regime with your operator before handover. |
| Control system | 1 set | Who is allowed to change temperature and filtration schedules once the property is trading. |
The figures above are transcribed from our catalog entry for this model. Equipment included, electrical requirements and options vary with the configuration chosen, so every number should be confirmed in writing against your quotation before it reaches a drawing set or an operations manual.
Options that change the running cost more than the purchase price
Catalog-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility differ by model, so we confirm each item against the specific unit rather than from a generic list. For a commercial property, three of them deserve attention early:
- Heat pump. A spa held at bathing temperature year-round is one of the more energy-hungry items on a small hospitality site. Specify it with the insulation package and decide the operating hours in the brief, not after commissioning.
- Insulation and cover. Heat loss through the shell and the water surface drives most of the running cost. If the unit sits somewhere exposed, this belongs in the base specification rather than as a later variation.
- Filtration and sterilisation. Ozone is shown as standard on this model; UV sterilization and sand filtration are options. The right combination depends on bather load and on what your local licensing regime expects from a shared-use pool, which is a question for the authority having jurisdiction, not for us to assume.
A note on adjacent models
If 5880 mm does not suit the deck, Outdoor Swim Spa WS-S06CT-L carries the same jet and pump arrangement in a 6670 × 2380 × 1400 mm envelope and lists temperature setting among its shown features. Where the space is irregular or the design calls for a bespoke form, our Customizable Shape Outdoor Spa covers square, round, oval and curved configurations in an acrylic shell. We will tell you plainly when a standard model is the better answer.
The procurement sequence we run with project teams
Our hospitality furniture supplier work covers swim spas inside the six-stage workflow set out on our service pages: consultation, design and planning, production, logistics, installation and after-sales. Applied to this unit, that means:
1. Brief and site information
Send drawings or photographs of the intended location, the local power supply, and how you intend the spa to be used: guest therapy, fitness, rehabilitation, or a premium upcharge facility. This determines the configuration conversation.
2. Configuration and quotation
We return an itemised specification showing included equipment and each option priced separately, so you can see what is being traded off. Our Custom & OEM Service covers bespoke finishes and configurations where the standard range needs adapting.
3. Production and inspection
Once the configuration is signed off, the unit goes into production with quality checks before packing. We ask clients to nominate a witness point for factory testing if their programme allows it.
4. Freight and customs
Furniture logistics and door-to-door delivery covers freight forwarding by sea, air or rail, packaging and container loading, commercial documents and final delivery. Import duties, permits and any local registration requirements for a public or shared-use pool remain the project's own responsibility to confirm with the relevant authority in your country.
5. Installation, commissioning and handover
Site works, connections and commissioning are coordinated under our Installation & After-sales Support. Handover should leave the operator with a written water-chemistry routine, filtration schedule, spare-parts list and the contact route for warranty claims. A spa that nobody on site knows how to run becomes an eyesore within two seasons.
Questions worth putting to any supplier
- Which items are included in the quoted price, and which are options priced separately?
- What is the connected load for my configuration, and what supply does it require?
- What clearance and access width do you need for delivery and for future equipment removal?
- Who commissions the unit on site, and what training does the operations team receive?
- What is covered under warranty, for how long, and what happens when a part fails after the first year?
If you are specifying outdoor water features alongside guest rooms, terraces or poolside furniture, it is worth grouping them into one procurement package. Coordinating the spa with the surrounding outdoor furniture for villas and resorts and the decking, lighting and screening in a single order removes the interface arguments that appear when three separate vendors each assume someone else handled the drainage.
Send us your drawings, the intended use and your local power supply, and we will come back with a configuration for WS-S06CT priced line by line. Contact PHILLIP on +86-13928214007 (phone/WhatsApp), email santerson@qq.com, or use the form on our contact page. Enquiries are answered within 24 hours during business hours, Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8).