A swim spa is a purchase you live with for years, so the model name on a datasheet is only the starting point. This guide uses Outdoor Swim Spa WS-115Aⅴ as a worked example and walks through the questions a buyer should settle before paying a deposit: what the unit physically measures, which equipment is actually included, how much power the site must supply, and which options change the delivered price. If you are specifying a spa for a villa terrace, a resort garden or a private residence project, the same checks apply to every model in the Swimming Pools and Swim Spas range.

Start With the Space, Not the Brochure

Before comparing jet counts, confirm the footprint. The published catalogue dimensions for WS-115Aⅴ are 3880 × 2200 × 1250 mm (length × width × water depth). That is a compact swim spa: it fits a terrace, a courtyard or an indoor utility room where a full pool would not.

Do not size the opening to the shell alone. Ask your supplier for the clearance needed around the cabinet for the plant, the control access and any steps, plus the width of the route from the delivery vehicle to the final position. A unit that fits the pad but cannot be moved through a gate or lifted over a wall becomes a site problem you pay for twice.

Then check water depth against how the spa will be used. At 1250 mm, an adult standing in the shell has the water around torso height, which suits seated hydrotherapy and supervised children's play; a swimmer works horizontally rather than standing. If your priority is long, unhurried lap swimming, compare longer shells in the same range before you commit.

Read the Specification Line by Line

Two units with the same model prefix can differ substantially once you read the equipment list. The catalogue entries below are for shells of similar width, which makes them a useful comparison of what changes between variants.

ItemWS-115AⅴWS-115Aⅴ-UWS-115Fⅴ
Catalogue dimensions (mm)3880 × 2200 × 12503880 × 2200 × 12505000 × 2200 × 1250
Control system1 set1 set1 set
Swim training system1 setNot listed1 set
Water pump1 pc4 pcs1 pc
Filter pump1 pc1 pc1 pc
Jet total24 pcs23 pcs24 pcs
LED lights4 pcs1 pc4 pcs
Total power8.05 kW11.85 kW8.05 kW

Three things stand out. First, WS-115Aⅴ and its sibling WS-115Aⅴ-U share the same shell size but are different machines: the -U variant lists four water pumps, one LED light and no swim training system, while WS-115Aⅴ lists a single water pump, four lights and a swim training system. Second, total power is not proportional to shell size — the shorter -U shell carries the higher figure at 11.85 kW against 8.05 kW for WS-115Aⅴ. Third, jet totals are close but the jet layout differs, which is what actually determines where the massage pressure lands when you sit in the spa.

Treat these numbers as catalogue figures for the standard configuration. Confirm the exact build you are buying in writing, because options and regional configurations move both the equipment list and the power figure.

Confirm What Is Included Before You Compare Prices

The features shown for WS-115Aⅴ on the product page are water jets, LED lighting, ozone and a swim training system. Ozone is a sanitising aid, not a replacement for filtration and water chemistry, so ask how the filter pump duty cycle is set and what filtration is supplied as standard.

The catalogue lists options that buyers commonly add: control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option needs confirming against the specific shell you have chosen. Two quotes for "the same" spa can differ by thousands once heating, insulation and access steps are separated out.

Ask the supplier to state, per line item: which options are included in the quoted price, which are extra, and which are not offered for this model. A quote that bundles everything into one figure hides the comparison you are trying to make.

Check the Power Supply Before Delivery, Not After

Total power of 8.05 kW for WS-115Aⅴ is well beyond a standard socket circuit, and the electrical requirements are configuration-dependent: adding a heat pump changes the load. Confirm three items with your electrician before the spa arrives:

  • The supply capacity, circuit rating and protective device required for the confirmed build.
  • Where the isolator and control access will sit, and whether that position stays reachable once cladding or decking is installed.
  • Who is responsible for site electrical work: the supplier, your contractor, or both at a defined handover point.

Heating also drives running cost. A heat pump and insulation are listed options rather than standard on every build, so if you intend to use the spa in cool months, price them into the quote from the start instead of retrofitting later.

Decide How You Will Actually Use It

Write down the two or three uses that matter most, then read them back against the specification:

  • Daily swimming against a current. The swim training system is listed as included on WS-115Aⅴ. If you want more length to glide in, compare longer shells such as Outdoor Swim Spa WS-115Fⅴ, which is 5000 mm long with a comparable equipment list.
  • Hydrotherapy and recovery. Here jet count matters less than jet position and pump arrangement. Ask for the seating layout and the jet map, and compare variants such as WS-115Aⅴ-U, which lists four water pumps against one on WS-115Aⅴ.
  • Family and evening use. Lighting count, water depth and safe entry all matter. Four LED fittings and optional steps are worth specifying when children or older users will be in and out of the water.

If you are furnishing an outdoor area as a whole — lounge seating, dining set, pergola and spa together — buy the layout as one plan. Outdoor Furniture for Villas and Resorts covers the pieces that sit around the spa, and coordinating them at specification stage avoids cladding, drainage and clearance clashes later.

Judge the Supplier Relationship, Not Just the Unit

A swim spa is a project purchase. SANTERSON has operated since 2008 as a China-based manufacturer and one-stop supplier of furniture and building materials, with services covering design consultation, custom/OEM production, door-to-door logistics, installation support and after-sales service. For a villa or hospitality project, that single point of contact across spa, outdoor furniture, lighting and finishes is where the practical savings sit: one set of drawings, one shipping plan, one coordination thread.

Set out the cooperation steps in writing before ordering — brief and design proposal, quotation and detail confirmation, then production, shipment and follow-up. Ask which stage fixes the specification, what happens if an option is substituted, and how snags and spare parts are handled after handover.

A Pre-Order Checklist

Tick every line before you sign:

  • Shell dimensions and clearance confirmed against the site, including the delivery route.
  • Water depth confirmed against how the spa will be used.
  • Equipment list in writing: control system, pumps, jets, lights, swim training system, sanitisation.
  • Options priced separately and confirmed as available for this model.
  • Total power for the confirmed build, agreed with your electrician.
  • Responsibility split for site electrical work, base preparation and installation.
  • Delivery terms, packaging and container plan agreed in writing.
  • After-sales scope: warranty terms, spare parts availability, and who handles them locally.

Work through those eight lines for two or three models in the range and the decision usually makes itself. If you want the confirmed specification, options and delivered price for WS-115Aⅴ against your own site conditions, send the drawings and the intended use to our team and we will quote the build rather than the brochure.

Talk to us about your project. Send your floor plan or terrace layout and how you intend to use the spa; we will confirm the configuration, power requirements and door-to-door delivery plan for Outdoor Swim Spa WS-115Aⅴ. Contact: PHILLIP — Phone / WhatsApp +86-13928214007 — santerson@qq.com

SANTERSON — furniture and building materials manufacturer, one-stop project supplier since 2008.