A single line item on a materials schedule can hold up an entire bathroom handover. The Wall Hung Ceramic Basin 1004B, Modern Wall Mount Bathroom Sink is a compact wall-mounted vitreous ceramic basin that fits neatly into villa, apartment and hotel guest-room schedules — provided the specification line carries enough detail for purchasing, plumbing and finishing trades to work from the same page. Below is how we place it in a whole-project schedule, from item coding through coordination with matching sanitaryware.
1. Write one master line item, not three variations
In our experience the most common scheduling error on bathroom packages is duplication: the designer's finish sheet, the contractor's bill of quantities and the supplier's proforma invoice each describe the same basin in different words. For this model we write one master line and copy it everywhere:
- Item code — 1004B, wall-hung ceramic basin, back-panel wall fixing.
- Body material — vitreous ceramic with a dense glossy glaze.
- Form — trapezoid profile, single tap hole for one faucet.
- Overall dimensions as published — 510 × 420 × 380 mm; confirm against the current technical data sheet before ordering.
- Fixing method — wall-mounted, secured by the back panel.
- Typical applications — home renovation, apartments, hotels and public washrooms.
Keep the dimension line flagged as "confirm on data sheet" until the drawing issue is frozen. Rough-in positions, carrier frame centres and tap-hole spacing belong to the plumbing drawings, not to a marketing description, and they are what actually determine whether the basin lands where the tile setter has already laid the wall.
2. Split the schedule into fixture, hardware and wall works
A wall-hung basin is never one purchase. We break it into three rows so that responsibility sits with the right trade:
| Schedule row | What it covers | Who signs it off |
|---|---|---|
| Ceramic fixture 1004B | The basin itself, glaze colour, tap hole, packaging and spares allowance | Interior designer / FF&E buyer |
| Support and rough-in | In-wall carrier, waste and supply connections, access for maintenance | Plumbing consultant / M&E contractor |
| Wall build-up and finishes | Stud or masonry wall capable of taking the fixing, tile set-out around the basin | Architect / tiling contractor |
Because the 1004B fixes to the wall through its back panel and leaves the floor beneath clear, the wall build-up row has to be closed before tiles are ordered. The open floor also makes mopping and daily cleaning straightforward in high-use washrooms, which is why this type of item keeps appearing on hotel and public-facility schedules rather than only in private villas.
3. Group it with the matching series to protect the design language
Mixing ceramic lines across a floor of identical bathrooms produces small but visible inconsistencies: glaze tone, corner radius, tap-hole diameter. The 1004B sits inside a coordinated sanitary series, so we schedule the companions in the same section and order them on the same purchase order:
- Washdown One Piece Toilet 1004A — for layouts where a floor-mounted WC with a P-trap or S-trap connection suits the existing pipework.
- Freestanding Ceramic Pedestal Basin 1004S — for guest bathrooms where a floor-standing basin is preferred but the same glaze and square-rounded styling must carry through.
- Wall Hung Bidet 1004F — where the project brief includes a separate hygiene fixture in the same wall-mounted format.
Scheduling them as one family also simplifies maintenance: spare parts, cleaning products and replacement glazes stay consistent for the operator after handover.
4. Add the columns procurement actually needs
Beyond description, each row in our materials schedule carries practical fields. For a ceramic basin on a villa or hotel package we ask for:
- Quantity per bathroom type, with a stated spares percentage held on site.
- Packaging and handling notes — ceramic freight needs crating, and breakage allowances are cheaper agreed at quotation than replaced after arrival.
- Lead time and shipment split, so the first bathrooms to be tiled receive fixtures first.
- Custom or OEM options confirmed in writing before production starts, where finishes or branding are involved.
- Inspection point — a signed mock-up bathroom reviewed before repeat units are released.
A mock-up room is the cheapest risk control on this kind of package. It confirms glaze colour under the project's lighting, the tap and waste combination, and the fixing height against the mirror and vanity lighting line.
5. Where a single supplier helps the schedule hold together
Bathrooms rarely fail on one product; they fail on the gaps between suppliers. When basins, toilets, showers, cabinetry, wall panelling and lighting are bought separately, the schedule has to reconcile dozens of independent lead times and drawing sets. Sourcing through a one-stop furniture and building materials supplier keeps those rows under one coordination process — specification, manufacturing, door-to-door logistics and site support handled by the same team, which is how we have run sanitary and fit-out packages for villa and hospitality projects from our China base out to international sites.
If you are building a bathroom schedule now, send us the fixture list and the plumbing drawings for the project. We will price the 1004B against your room-by-room quantities, confirm the technical data sheet dimensions with you before production, and flag any row that needs a matching companion from the series.