A swim spa quoted for a hotel, resort, gym or residential tower is rarely rejected on price alone. It is usually rejected because the proposal does not answer the questions a project team actually has to sign off: what fits the slab, what the power supply has to carry, which equipment is inside the quoted price, and who handles delivery, installation and the parts that wear out. The following review checklist uses our Outdoor Swim Spa WS-P001 as a worked example, so you can see what a complete line item should look like before you approve a purchase order.

1. Confirm the shell dimensions against your structure, not the brochure

The catalog entry for WS-P001 lists a footprint of 3500 x 950 mm. Those are catalog figures for the standard configuration, and they are only useful once you have compared them with three site conditions: the clear opening or terrace area available, the access route the shell travels on from the delivery vehicle to its final position, and the load rating of the slab or deck it will sit on. A proposal that states dimensions without stating whether they refer to the outer shell, the water line, or the envelope including steps and equipment access is incomplete.

Ask the supplier to confirm in writing: the external dimensions of the quoted configuration; the service clearance needed at the equipment compartment; the weight of the unit empty and full; and whether insulation, steps and cover are included in those numbers. If the unit is going onto an upper level or a podium deck, your structural engineer needs the filled weight before tenders close, not after.

2. Read the equipment schedule line by line

Hydrotherapy packages look similar at quote stage and behave very differently in operation. The WS-P001 specification published on our site lists one control system, two water pumps, one filter pump, a jet total of 81 pieces, two LED lights and a total power figure of 8.35 kW, with water jets, LED lighting and ozone shown as the features of that configuration.

Compare those entries against your programme requirements rather than treating them as universal. A spa installed in a fitness facility used several times a day has a different duty cycle from one on a resort terrace used a few hours each evening, and the filtration and heating allowance should follow the expected use. Where a proposal lists jet counts without stating jet types or zoning, ask for that breakdown; it changes both the user experience and the pump load.

Specification itemWhat the catalog states for WS-P001What to confirm before you sign
Dimensions3500 x 950 mm (catalog)Whether the figure is shell or envelope, plus clearance for steps and equipment access
Jets81 pcs totalJet types, zoning and which jets are in the quoted package
Pumps2 water pumps, 1 filter pumpPump duty versus expected daily usage hours
Total power8.35 kW (catalog)Supply capacity, circuit protection and whether a heat pump is included or optional
TreatmentOzone shown as a featureWhether UV sterilisation is included, optional or excluded
Lighting2 LED lightsControl method and spare availability

3. Check the electrical load with your engineer early

The catalog total power figure for this configuration is 8.35 kW. Treat that as a starting point for coordination, because the connected load changes once options such as a heat pump or additional pumps are added to the same circuit. Send the equipment schedule to your electrical consultant at the design stage and confirm three things: the available supply capacity at the plant location, the cable route and isolation requirements, and who is responsible for the final connection. Electrical scope left undefined between the spa supplier and the main contractor is one of the most common causes of delay at handover.

4. Separate standard inclusions from optional accessories

Catalog-listed options across our configurable swim and hydrotherapy range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so a proposal should show each option as its own priced line with a clear "included" or "optional" flag.

This matters most for two items. Insulation determines running cost in cooler climates and is frequently quoted as an add-on. A heat pump changes the electrical load, so it must be decided before circuits are designed, not during installation.

5. Verify what happens after the unit leaves the factory

For a commercial project the delivery question is rarely "will it ship" but "who carries each step". Our logistics and door-to-door delivery service covers freight forwarding, customs paperwork, packaging and container loading through to door-to-door delivery. The installation and after-sales support page lists on-site installation, inspection and snag resolution, warranty coverage, spare parts and ongoing maintenance. Response-time figures quoted in marketing copy should be confirmed for your specific project and location before they enter a contract.

For multi-property owners, standardising across sites is worth the extra effort at specification stage. Our swimming pool and swim spa range includes configurations with different footprints and features, including models with a listed swim training system such as the 5900 x 2500 x 1600 mm Outdoor Swim Spa WS-SP600. Specifying one equipment family across several buildings simplifies spare parts, staff training and maintenance planning.

6. Send the supplier this before asking for a price

  • Location and structural setting: ground level, terrace or internal, with slab load limits if elevated.
  • Access route from the delivery point to the final position, including any crane or rigging requirement.
  • Available electrical supply at the plant location, and who performs the final connection.
  • Expected daily usage hours and number of users, which drives filtration and heating selection.
  • Required options: insulation, heat pump, UV sterilisation, sand filtration, steps, cover.
  • Local approval or inspection requirements that your consultant must satisfy.

A proposal that answers all six points can be compared line by line against the other bids in your tender pack. One that does not should go back for revision before pricing is evaluated.

Specification note: the figures above are transcribed from the published catalog entry for the standard WS-P001 configuration. Included equipment, jet package and electrical load vary by selected configuration, so confirm them in writing with our project team before ordering.

SANTERSON has supplied furniture and building materials to villa, hospitality and office projects since 2008, with turnkey solutions covering design coordination, custom and OEM manufacturing, logistics and site support. Send us your swim spa requirement with the six inputs above and we will return a configuration and equipment schedule you can evaluate against the rest of your tender.