A glass sliding door schedule rarely fails on day one. It fails in year three, when a leaf drags along the threshold, a panel rattles in a lobby draft, or the finish that looked right on the sample board has gone dull under corridor lighting. If you are procuring doors for a hotel, apartment block, restaurant or office fit-out, the proposal in front of you is the cheapest place to fix those problems. Here is what we ask buyers to check before they sign.

1. Does the proposal price the opening, or the door?

Sliding doors are assembled on site from components, so a quotation that shows only a unit rate and a quantity hides most of the risk. Ask for the breakdown to name the frame build, the leaf construction, the track and hanger hardware, the wall pocket or surface guide arrangement, and the architrave or face trim. Then check whether site measurement, packing, freight to the job, and on-site fixing are inside that rate or billed separately.

  • Openings quoted as "standard" without dimensions — every opening on a commercial job needs a measured dimension confirmed against the finished floor level.
  • Hardware listed as "premium sliding hardware" with no maker, load rating or spare-part reference.
  • Threshold, track cover and floor guide omitted because they sit in another trade's scope.

2. Glass type, thickness and safety duty

Glass is the visible cost and the main safety item, so the proposal should state the glazing specification rather than "toughened glass". In a commercial setting, ask which panes carry a safety duty: lobby and entrance positions, doors next to stairs, shower screens, and any glazed area within traffic routes. The document should record the make-up (single or laminated), the thickness, the edge treatment and whether vision restrictions or manifestation are included.

Tinted, frosted, ribbed and smoked glass all read differently in a photograph from a sample tile. For our glass sliding doors, we ask project buyers to confirm the glass type and safety requirement against the specific position before production, because the same panel design behaves differently as a partition next to a corridor and as a screen in a wet area.

3. Track, hanger and traffic duty

Sliding doors live or die on the running gear. Two questions settle most of it: what is the leaf weight, and how many cycles a day will that position take? A restaurant partition moves far more than a bedroom wardrobe door, and hardware specified for domestic use will show it within a year. Ask the supplier to state the load rating per hanger, whether the track is fixed to a structural head or to a partition head, and whether the bottom guide is floor-mounted or wall-mounted.

Where the design calls for a full-height flush arrangement, ask how the reveal is handled at the ceiling and how the pocket is lined. Our flush sliding doors are made to measure with material and finish options chosen per project, so the wall build-up has to be agreed with the builder before we set the frame depth.

4. Finish schedule and who signs it

Veneer, lacquer, metal frame and glass tint are all batch-sensitive. A proposal should list each finish against a reference code, not a colour name that means something different at another factory. Then check what the supplier actually supplies for sign-off: a physical sample of the frame finish, a glass offcut in the specified tint, and one hardware finish sample. Get written confirmation of who approved them and when.

For mixed packages — doors with glass sliding door wardrobes, panelling and cabinetry in the same building — matching a veneer across three product lines is a real production problem. Ask whether the doors and the joinery are made in the same factory run, from the same veneer batch.

5. Tolerance, sequencing and site interface

Ask what tolerance the supplier allows on the finished opening, and who prepares the head, jamb and floor level. Sliding systems need a level threshold run and a true head; if the screed or the ceiling set-out moves after measurement, the doors will not fix. A competent proposal names the interface: who supplies the structural support above the opening, who levels the floor, and at what stage we re-measure.

Our interior design and project coordination service covers space planning, drawings and production coordination through to on-site guidance, so measurement is taken against the agreed finished levels rather than an assumed one.

6. Commercial terms that decide the outcome

  • Lead time measured from what? From order, or from approval of drawings and samples? Approval usually starts the clock.
  • What is delivered to site? Loose glass with framed leaves, or glazed panels? This changes handling and breakage risk.
  • Packaging and freight — glazed product needs crated, edge-protected packing and a named delivery point on the job.
  • Spares and after-sales — hangers, guides and bottom rollers are service items. Confirm they can be reordered to the same specification later.
  • Variations — how an opening change is priced once production has started.
Before you award: ask for one reference job where the same door type has been in use long enough to judge, and read the snag list from that job rather than the photographs.

A short checklist before you sign

  • Measured dimensions per opening, signed off against finished floor levels
  • Glass make-up, thickness and safety duty stated per position
  • Hardware maker, load rating and spare-part reference named
  • Finish codes with physical samples approved in writing
  • Site interfaces defined: head support, threshold level, pocket lining
  • Lead time anchored to drawing and sample approval, plus spares supply
SANTERSON has manufactured furniture and building materials since 2008 and supplies sliding doors, wardrobes, panelling, cabinetry and fit-out products for villa, hospitality and office projects, with custom sizing, freight coordination and installation support. Send us your door schedule and drawings and we will price it against the openings you actually have — send your schedule through our contact page and we will quote per opening.