A slim frame French door is one of the quietest elements in a fit-out and one of the loudest when it goes wrong. The sightlines, the reveal against the wall, the way the threshold meets the flooring — all of it has to be decided before production starts, not on site. This guide walks through how we coordinate Santerson Modern Slim Frame French Doors with the joinery, wall finishes and flooring around them, using the same documentation route we apply on villa and hospitality projects.

Why a slim frame door is a coordination item, not a line item

A conventional framed door hides its weaknesses. A wide casing absorbs out-of-plumb openings, covers gaps left by the wall trade and forgives a floor that finishes at the wrong height. A slim profile does none of that. Narrow stiles and a minimal reveal mean every junction is visible: door leaf to frame, frame to wall, threshold to flooring, glazing bar to handle.

That is exactly why these doors work well in a project where the same supplier produces the surrounding elements. When the wall panel systems, cabinetry and doors come from one factory, the junction details are resolved on the drawing before anything is cut, instead of being improvised by whoever arrives on site first.

What the product page actually gives you to specify

Our slim frame French doors sit within the wider French Doors collection and are made to measure for each opening. The specification points that matter in a fit-out are the same ones we confirm on every door order:

  • Opening size and orientation — leaf widths, overall height, hinge hand and which leaf is active.
  • Frame profile and reveal — how much face the frame shows against the finished wall line.
  • Glazing layout — glazing bar spacing, glass type and whether the meeting stile stays slim at the centre.
  • Finish — colour and surface treatment matched to the joinery palette of the project.
  • Hardware set — handles, hinges and closers that suit the leaf weight and the traffic the door will carry.

We confirm dimensions and selected specifications for each project before production. Nothing on this page should be read as a standard size or a fixed specification; every order is documented against your drawings.

The four junctions to resolve first

1. Door frame to wall finish

Decide the finished wall line before the frame is drawn. A slim frame gives you almost no tolerance for plasterboard build-up, backing plaster or a panel thickness that changes on site. If the wall carries wood veneer panels or another applied finish, the frame depth has to be drawn to that total build-up, including adhesive and any battens behind it.

2. Threshold to flooring

Set the door leaf bottom dimension from the finished floor level, not the structural slab. Engineered timber, carpet tile, stone and external paving all build up differently, and a threshold detail drawn against the wrong level shows up as either a dragging leaf or an unsightly gap. Fix the floor make-up for each side of the opening on the same drawing that shows the door.

3. Door head to ceiling and reveals

Where a full-height door runs to a ceiling line or a bulkhead, the head detail should be agreed with the ceiling package. A shadow gap reads cleanly only if the ceiling set-out was drawn to receive it.

4. Door to adjacent joinery

Where the door sits next to a wardrobe run, a media wall or a kitchen return, the sequence of installation matters. We draw which element butts into which, and we set out the fixings so that one trade's work does not have to be trimmed by the next.

Matching finishes across the package

The most common complaint about a slim frame door in a completed interior is a finish mismatch: a door that reads slightly warmer or cooler than the veneer panels beside it, or a handle finish that repeats nowhere else in the room. Because our doors and our built-in joinery are produced in the same facility, we can group them into one finish schedule.

ElementWhat to alignWhen to decide
Slim frame French doorsFrame colour, surface texture, glazing bar finishAt concept design, with the joinery palette
Wall and veneer panelsGrain direction, joint pattern, shadow gapsWith the door set-out drawing
Cabinetry and wardrobesVeneer batch, lacquer sheen, handle familyBefore the finish schedule is signed off
Flooring and thresholdsFinished level, transition profile, expansion allowanceWith the floor make-up drawing
Lighting near the openingSwitch position relative to the door swingAt first-fix set-out

One practical note for procurement teams: veneer and timber tones vary between batches. Where a door frame and adjacent panelling must read as one surface, order them together and from the same batch rather than months apart.

Choosing the right door type for each opening

A fit-out rarely needs one door type throughout. We normally mix families within a single project so that the operation suits the room and the frame stays consistent in appearance:

  • Classic French Double Doors for formal entrances and dining connections, where the wider leaf and glazing pattern carry a more traditional proportion.
  • Santerson Arched French Doors where a curved head is set into the architecture — these need the arch radius and the wall opening confirmed together, since the curve cannot be adjusted on site.
  • Santerson Flush Interior Doors for bedrooms, bathrooms and service areas, where a plain leaf keeps the wall plane calm and matches concealed cabinetry fronts.
  • Glass Sliding Doors where a swing arc would cost usable floor area, with the track and pocket detail drawn into the floor and ceiling build-up.

Keeping these openings in one package means the reveal widths, handle finishes and paint or veneer systems are documented once and applied consistently, instead of being re-specified for each trade.

How a turnkey supplier removes coordination risk

On a villa or hospitality project, the door schedule is usually split across three suppliers: doors, joinery, wall finishes. Each one confirms their own dimensions and each one assumes the others will fit. That is where slim frame details fail.

When the openings, the panelling and the built-in furniture come from a single manufacturer under turnkey project delivery, one drawing set governs all of them, and one production schedule carries them to site in the right sequence.

Our route on a project like this runs through consultation, design and planning, production, logistics, installation and after-sales. For the door package specifically that means:

  • Site survey or verification of opening dimensions against your architectural drawings.
  • A door schedule showing profile, glazing layout, finish and hardware for every opening.
  • Junction details for frame-to-wall, threshold-to-floor and head-to-ceiling conditions.
  • Production alongside the joinery package so finishes come from one batch.
  • Packaged shipment with each opening labelled to the schedule, so installers are not sorting crates on site.

Freight arrangements, import terms and installation coverage are confirmed per project. We do not present standard transit times or service guarantees; every delivery scope is quoted for the specific site.

A pre-production checklist for the door package

Confirm before you release to production

  • Finished floor levels on both sides of every opening, with the make-up noted.
  • Total wall build-up at each frame, including panels, plaster and battens.
  • Hinge hand, active leaf and any furniture or fixtures that limit the swing arc.
  • Glass specification for the opening — safety requirements are set by the project's location and use, and confirmed with your local authority or certifier.
  • Finish schedule cross-referenced to veneer, cabinetry and ironmongery batches.
  • Installation sequence agreed with the flooring, wall and ceiling trades.

Common coordination failures — and how to avoid them

The reveal is uneven. Usually a frame drawn against structural rather than finished dimensions. Fix it by dimensioning from the finish line on both faces.

The leaf sits proud of the panelling. The panel thickness was decided after the frame depth was fixed. Draw the panel build-up and the frame section on one detail.

Two veneers do not match. Different batches, ordered separately. Group doors and panels in one purchase order.

The threshold cannot be closed up. Floor make-up was assumed rather than measured. Record it per room before the joinery is drawn.

Frequently asked questions

Can the slim frame doors be supplied with matching wall panelling?
Yes. Doors and panelling are both made to measure in our facility, so they can share a finish schedule and, where required, the same material batch.

Do you supply only complete projects?
No. Alongside furniture series, interior fixtures and building materials, individual packages such as a door schedule or a joinery run can be produced to your drawings.

What information do you need to quote a door package?
An opening schedule or architectural drawings with sizes, the intended finish palette, glazing requirements per opening and the project delivery location.

Next steps

Send us your opening schedule and finish palette and we will return a door schedule with junction details for review, together with a quotation for the coordinated package. For an existing project already in build, share the current drawings and we will mark up the coordination risks before anything goes into production.