A set of painted shaker cabinets can look perfect on the drawing and still fail on site: a door that will not clear the appliance, a crate that cannot reach the lift, goods delivered before the room is ready to receive them. Cabinet procurement rarely fails at the design stage. It fails in the gap between production, freight and installation, and that gap is where delivery and installation planning earns its keep.

SANTERSON supplies made-to-measure cabinetry for residential kitchens and whole-house projects, working from project-specific dimensions, layouts and finish choices rather than a fixed modular range. The same coordination discipline applies whether the order covers one kitchen or joinery across several villas: decisions taken before production determine how smoothly the shipment lands and how quickly the fitter can close out the job.

The three points below are the ones worth settling on paper: where the goods will be stored, who books the delivery slot, and what has to be finished on site before the fitter mobilises. Settled early, they keep a made-to-measure order on programme; left open, they are where the schedule is lost.

Why Shaker Cabinet Delivery Needs Its Own Plan

Shaker doors are framed panels with a recessed centre. That construction is forgiving in style but demanding in logistics: assembled boxes and loose door panels behave differently in transit, painted surfaces mark if they rub, and every opening has to square up before hinges carry weight. Three practical consequences follow.

  • Cabinets travel better flat-packed than built. Loose parts, pre-drilled fixings and clearly labelled sub-assemblies survive handling far better than a fully assembled wall unit, and they let the fitter adapt to out-of-square walls on site.
  • Painted finishes need protected, sequenced handling. A painted door panel that arrives chipped cannot simply be touched up on site without a visible repair. Panel protection, edge guarding and a sensible loading sequence in the container matter as much as the paint specification itself.
  • Made-to-measure sizes leave no room for improvisation. When every carcass is cut to the drawing, a wrong dimension becomes a remake rather than an adjustment. Production should only start once site dimensions are confirmed against the finished floor and finished wall levels.

The Sequence That Keeps the Job Moving

Our project workflow runs through consultation, design and planning, production, logistics, installation and after-sales. For a cabinet package, each stage has a defined exit condition — the point at which it is safe to move on.

  • 1. Brief and layout

    Drawings, appliance schedule and door-swing checks signed off by the client. Exit condition: no open questions on heights, depths or handle choice.

  • 2. Site verification

    Dimensions taken on site after flooring, plasterboard and services are in place. Exit condition: verified levels and a written confirmation of the dimensions to be produced.

  • 3. Production and finish approval

    Carcasses, doors and panels manufactured to the confirmed sizes, with the selected paint or lacquer finish applied and inspected before packing. Exit condition: packing list matches the approved shop drawing item for item.

  • 4. Packing and freight

    Panels protected, hardware bagged and labelled by room or elevation, then loaded so the first items needed are the last ones in. Sea, air or rail routing agreed with the buyer's forwarder, paperwork prepared alongside the cargo.

  • 5. Delivery to site

    Delivery slot booked against site access, lift capacity and storage space. Exit condition: a dry, secure staging area is ready before the crates arrive.

  • 6. Installation and handover

    Levelling, scribing, door adjustment, then a joint inspection with snag items recorded on a single list. Exit condition: signed close-out with the spare-parts contact passed to the client.

Lead Time Is a Site Question, Not Only a Factory Question

Buyers often ask how long production takes. The more useful question is when the site will actually be ready to receive the goods. A cabinet order that lands well before the room is finished has to be stored somewhere safe, and one that arrives after the worktop template date holds up splashbacks, appliances and the flooring crew behind it.

Plan the schedule backwards from the installation date:

MilestoneWhat must be true before it happens
Drawings released to productionLayout, appliance schedule and finish sample approved in writing by the client or designer.
Production startsSite dimensions verified against finished levels; no pending change requests on the order.
Goods leave the factoryPacking list checked against drawings, freight mode and Incoterms confirmed, documents issued with the shipment.
Goods clear and reach siteImporter of record named, delivery vehicle able to access the property, staging area prepared.
Fitter mobilisesWalls and floors complete and dry, other trades off the room, tools and fixings for local conditions on hand.

Sizes and Fitting, Agreed in Advance

Because these cabinets are made to measure, the fitting method is part of the order rather than an afterthought. Scribing to an uneven wall, a clear run of services behind the carcasses, and a level line set out across the whole kitchen are all decided with the drawings. Confirm the dimensions and selected specifications for each project before production starts, so the fitter spends the visit on alignment instead of corrections.

Who Holds Which Task

Most coordination problems are ownership problems. Writing the split down before production prevents two parties assuming the other one arranged it.

  • Supplier: shop drawings, made-to-measure production, finish QC, protective packing, container loading plan, packing list and shipping documents, plus installation guidance for the local crew.
  • Buyer or main contractor: site dimensions at the right moment, clearance of the delivery route, storage, the trades that run around the cabinetry, and sign-off at each stage.
  • Designer or project manager: one controlled version of the drawings, a single change log, and decisions on finishes taken early enough not to interrupt production.

Common Failure Points and How to Close Them

  • Measuring too early. Take dimensions after the finished floor level is set and the walls are boarded. Record both rough and finished levels on the drawing.
  • Late appliance decisions. Integrated ovens, fridges and dishwashers set the internal dimensions of tall and base units. Fix the model list before drawings are released.
  • Finish samples confirmed verbally. Painted surfaces read differently under warm and cool light. Approve a physical sample or a documented colour reference for each elevation.
  • Delivery booked into an unready building. Confirm the lift, stair width and corridor turns can take the longest crate before the vehicle is dispatched.
  • No snag process. Walk the installation with the fitter and record every adjustment on one list, so door alignment and hinge corrections are closed out in a single visit.

Finishes and Colour, Settled Before Production

The shaker profile carries more than one look. Projects that want a cooler palette often specify grey shaker cabinets; those working with two-tone schemes pair painted uppers against a timber-look base with two tone shaker cabinets. Painted doors are sprayed during production, so the colour has to be settled before the doors are made. Ask for a physical door sample or a documented colour reference for each elevation: a swatch on paper and the same colour under warm kitchen lighting are not always the same decision.

A Short Checklist Before You Release the Order

  • Drawings signed, dated and version-controlled.
  • Site dimensions verified against finished floor and wall levels.
  • Appliance schedule final, with clearances noted.
  • Finish approved from a sample or documented reference.
  • Freight mode, delivery address and importer of record confirmed.
  • Storage area and installation window booked before dispatch.
  • One named contact on each side for changes and site queries.

SANTERSON produces painted shaker cabinetry to project dimensions and coordinates the packaging, freight documentation and installation guidance around it, as part of a turnkey furniture and building materials package for villas, hospitality and office projects. Send us your drawings and site programme and we will confirm what has to be fixed, and when, before production begins.