A wood grain pvc cabinet is one of the easiest cabinetry items to get wrong on a kitchen project, because two drawings can look identical while the boards, edge treatment and hardware behind them are completely different. Most rework we see on residential and apartment kitchens does not start with the design. It starts with an enquiry line that reads "wood grain PVC doors, 12 units" and stops there. The specification below is the checklist our production team works from before a quotation can be priced properly.
Why the specification matters more than the drawing
A cabinet elevation tells a manufacturer where things go. It does not tell them what the doors are wrapped in, how the carcass is assembled, or which hardware the site crew will install. For PVC-wrapped cabinetry, the difference between a workable order and a rework order usually sits in five lines of text: substrate, film, grain direction, edge banding and hardware schedule.
Write those five lines clearly and you can compare quotations from different suppliers on the same basis. Leave them out and each supplier prices their own default, which is why two prices for "the same" kitchen can differ by a wide margin while neither quotation is actually wrong.
Section 1: Scope and identification
Start with the boring part, because it is what protects you at handover. Give every cabinet run a unique code that matches your drawings — for example KT-A for the main kitchen wall, KT-B for the island, BR-1 for the bedroom wardrobe run.
- Cabinet code and the drawing revision number it comes from
- Room, wall length and clear ceiling height
- Quantity of each unit type: base, wall, tall, drawer stack and island units
- Delivery address, access route and lift or stair constraints
- Whether installation is included or the units are supplied for a local crew to fit
Our made-to-measure service works from these codes directly, so a specification that matches your drawing set removes an entire round of clarification emails.
Section 2: Door face — substrate, film and grain
This is the section where wood grain PVC cabinetry needs the most precision. "PVC" describes the decorative film, not the board underneath it, so state both.
- Substrate: MDF, plywood or particleboard, with the board thickness for doors, carcass and back panels
- Film: PVC foil, gloss level (matte, satin or high gloss) and a finish reference from your sample board
- Grain direction: vertical, horizontal or matched across adjacent doors — state it door by door on elevations where panels meet
- Profile: flat slab, shaker or routed panel, plus any radius or eased edge detail
- Sheen tolerance: how the finish should read under the room's lighting, especially for darker grains
Grain direction is the single most common omission. Two doors cut from the same sheet but rotated 90 degrees will not read as a pair once they are on the wall. If your design uses a continuous grain across a run, say so explicitly and ask for a door schedule that shows the direction on each leaf.
Section 3: Carcass, edges and interior
The carcass is where longevity comes from, and it is invisible in a render.
| Item | What to specify |
|---|---|
| Carcass board | Board type and thickness; moisture-resistant board for sink runs and wet climates |
| Edge banding | Material and thickness on visible edges; matching colour on interior edges |
| Back panel | Thickness and fixing method; fixed panel where wall flatness is uncertain |
| Interior finish | Colour of interior faces and shelf edges where doors will stand open |
| Shelves | Adjustable or fixed, span, and expected load for heavy items |
| Toe kick | Height, recess and material |
For a wood grain finish on the doors, decide whether you want the carcass to match, stay neutral white, or take a contrasting tone. Specify it once and every quotation follows the same rule.
Section 4: Hardware and integrated items
Hardware belongs in the specification, not in a later email. List hinges with their closing action, drawer runners and their load rating, handles or a handleless profile, and any integrated lighting.
- Hinges: brand line, soft-close or push-to-open, and corner plates where needed
- Drawers: runner type, full or partial extension, load rating, and drawer-front height
- Handles: centre-to-centre drilling, finish, or the router profile for a handleless edge
- Appliances: exact model codes and cut-out dimensions for oven, dishwasher and fridge
- Lighting: fixture type inside cabinets, switch or sensor location, transformer position
- Worktop interface: how the top meets the wall and whether a splashback is included
Where appliances are still undecided, freeze the cut-out envelope instead of the model. That keeps the joinery order moving without locking you into one brand.
Section 5: Tolerances, site conditions and approvals
Cabinetry is installed onto floors, walls and ceilings that are rarely square. Put the assumptions in writing.
- Finished floor levels and where scribes or filler panels will be used
- Tolerance allowance for out-of-plumb walls, and who sets it out on site
- Service locations: water, waste, power points and isolators, with heights
- A physical signed-off sample of the door face, edge and one drawer front before production release
- Packaging standard for transport to the site
A signed physical sample is worth more than a hundred words of description. Grain depth, sheen and how the film reads at an angle cannot be judged from a screen, and approving one door face before release settles most aesthetic arguments in advance.
Section 6: Comparing quotations on the same basis
Once the specification above exists, put it in front of every supplier and ask each to confirm line by line. Read the answers for three things: whether the substrate and film match your sample, whether hardware is priced at the brand you named, and whether installation, spare panels and after-sales cover are inside or outside the number.
A useful test is to ask what is excluded. Suppliers who price carefully will list exclusions clearly; a quotation with no exclusions usually contains assumptions you will pay for later.
How the PVC range supports a specified order
SANTERSON's PVC kitchen cabinet collection is made to measure, with project-specific dimensions and finish options, so the specification format above maps directly onto what we need in order to quote. Alongside the wood grain option, the range covers matte pvc cabinets for low-sheen schemes and High Gloss PVC Cabinets where a reflective surface is wanted. A related item in the same collection, the Santerson Outdoor Ready PVC Cabinets, is listed for external and semi-exposed locations; confirm the exposure conditions and the selected specification for each project before ordering.
Each product in the collection can be specified by finish, layout and dimension to suit the space, which means non-standard heights, scribe panels and full-height runs are resolved in production rather than on site. Send the elevation set with the six sections above and you will receive a quotation that reflects what you actually specified.
Before you send the enquiry
- Every cabinet run carries a code that matches the drawing revision
- Substrate, film type and gloss level are named for each door type
- Grain direction is stated on every elevation
- Carcass board, edge banding and interior colour are specified
- Hardware schedule and appliance cut-outs are attached
- A signed physical sample gate is built into the production schedule