A smoked glass wardrobe looks simple on a mood board and complicated on site. The tint, the frame, the door action and what sits behind the glass all change the price, the lead time and the finished result. This guide sets out the specification fields we ask buyers, designers and contractors to fill in before a quotation is issued, so the drawing you approve is the wardrobe that arrives.
Why smoked glass wardrobes need a written specification
Smoked glass sits between clear and frosted glass in what it reveals. It softens the view of hanging clothes while keeping the room feeling open, which is why it appears so often in villa bedrooms, hotel guest rooms and apartment joinery packages. That same quality creates risk: two panels described as "smoked" can read very differently against a dark wall or under warm lighting.
Because our Smoked Glass Wardrobes are made to measure, with finish, layout and dimensions set per project, the specification sheet is the document that carries the order forward. A vague enquiry produces a vague price range; a complete field list produces a drawing, a fixed quotation and a production slot.
Field 1: Glass type and tint depth
Start with what the glass is, not just what it is called. "Smoked" describes a family of tinted panels, and the practical difference between options shows up once the doors are closed on a fitted interior.
| Panel type | What you see through it | Where it works best |
|---|---|---|
| Smoked tinted glass | Soft, dimmed view of contents; shapes and colours stay readable at a distance | Villa bedrooms, hotel guest rooms, wardrobes styled as room features |
| Bronze tinted glass | Warm tint with a slight reflection; softer than smoked in daylight | Rooms with warm neutrals, timber veneer and brass or bronze hardware |
| Frosted glass | Diffused light, forms blurred, contents not legible | Bathrooms adjacent to bedrooms, shared accommodation, storage-heavy layouts |
| Clear glass | Full view of the interior | Dressing rooms and display wardrobes where the contents are part of the design |
Two practical notes for the sheet. First, state the tint name you want and attach a reference photo or sample number rather than relying on an adjective — "grey smoked" means different things to different factories. Second, tell us whether the glass is expected over a lit interior or an unlit one, because internal lighting changes how deep the tint appears.
Field 2: Frame system and frame colour
Frameless glass doors and framed glass doors behave differently on site, and they are priced as different products. Our Smoked Glass Aluminum Frame Wardrobes put each door inside an aluminium profile, which gives a crisp shadow line, protects the glass edge at the corners, and lets the frame colour be matched to other metalwork in the room.
- Frame material: aluminium profile, or no visible frame with hardware only.
- Frame finish: anodised, powder-coated or wood-effect; state whether it must match nearby window frames, kitchen profiles or door ironmongery.
- Profile width: the sightline you want on the finished face — slim and minimal, or a wider profile that reads as a design element.
- Edge detail: how the frame meets skirting, cornice and reveal; note any out-of-plaster walls that need scribing.
Field 3: Door action and clearance
The door action decides whether the wardrobe fits the room at all. Sliding doors need a run of wall for the panels to pass behind each other; hinged doors need swing clearance in front. For tight bedroom layouts, Glass Sliding Door Wardrobes are usually the practical answer, since nothing projects into the room when the doors move.
- Sliding: number of panels, number of tracks, overlap allowance, and track type (top-hung or bottom-rolling).
- Hinged: number of doors, hinge side for each, and the clear floor-to-door distance in front.
- Walk-in or open: glazed partitions or open framing instead of doors, where the room itself becomes the enclosure.
Measure the room twice: once at finished floor level and once at the ceiling. Sliding systems in particular fail on site because a ceiling finish was raised after the drawing was issued.
Field 4: Carcass, board and edge banding
Glass gets the attention; the carcass determines how long the wardrobe lasts. Specify the board type, thickness and edge treatment for every visible surface, including interior shelves where edges will be seen through the glass.
- Board substrate: state the grade required for the project and confirm it against the intended use.
- Surface finish: melamine, lacquer, acrylic, veneer or laminated board; match to other joinery in the same package.
- Edge banding: colour and material, plus whether interior edges are fully banded.
- Back panel: thickness and fixing method — relevant where a lit interior is planned behind smoked doors.
Field 5: Internal layout and storage zones
Send the layout as a sketch with dimensions, or tell us how the wardrobe will actually be used and we will draft it for approval. Hanging rails, drawer banks and shelf stacks each need their own height allowance, and smoked glass makes an untidy interior visible as a blur rather than hiding it.
- Hanging zones: single hang, double hang, or pull-down rails for high bays.
- Drawers: number, depth, soft-close requirement, and whether they sit behind glass.
- Shelves: spacing, adjustable or fixed, and any dedicated niches for bags or boxes.
- Accessories: trouser slides, tie racks, valet rods, lighting channels, mirror panels on an interior door face.
Field 6: Hardware, handles and integrated lighting
On a glass door the hardware is part of the appearance. Handleless profiles keep the face uninterrupted; a long vertical pull gives something to grip on a wide panel. Where interior lighting is specified, note the fitting position, the switching method (door-activated, motion or manual) and where the driver is to be accessed for maintenance.
Field 7: Dimensions, tolerances and site conditions
Give finished dimensions, not structural ones. Our built-in wardrobe range is made to measure for each project, so the numbers you confirm are the numbers we manufacture to.
| Dimension | What to state |
|---|---|
| Width and height | Finished opening width and floor-to-ceiling height, at both ends of the run |
| Depth | Carcass depth plus door thickness, checked against door swing or slide path |
| Obstructions | Sockets, switches, radiators, beams, skirting, cornice, curtain boxes |
| Floor and wall condition | Level of floor finish, plaster true, whether the unit is scribed or boxed in |
Field 8: Quantity, phasing and delivery address
For multi-unit work, list each wardrobe as a separate line with its own room reference and drawing number. State the total quantity, any phased release across units or floors, the delivery address, and whether goods are to be delivered floor-by-floor or held at dock level. Our logistics service covers freight by sea, air and rail with customs paperwork and door-to-door delivery, but the phasing plan has to come from your programme.
A specification sheet you can copy
- Project name, room reference and drawing number
- Glass type and tint reference, with sample or photo attached
- Frame system: framed or frameless; profile finish and sightline width
- Door action: sliding (panel count, tracks) or hinged (door count, hinge side)
- Carcass board, surface finish, edge banding, back panel
- Internal layout with dimensions: hang, drawers, shelves, accessories
- Hardware and integrated lighting, including driver access
- Finished dimensions at both ends of the run, plus obstructions
- Quantity per room, phasing, delivery address and site conditions
- Confirmation of who signs off the shop drawing before production
How the specification moves into production
Once the sheet is complete we return a shop drawing with elevations, section details and the internal layout marked up. You approve or amend it; only after sign-off does the order enter production. For villa and apartment packages where wardrobes sit alongside custom minimalist bedroom wardrobe runs, kitchen cabinetry and other built-in joinery, we coordinate the finishes across the same package so carcass colours, edge banding and hardware are consistent from room to room.
SANTERSON has operated as a China-based furniture and building materials manufacturer since 2008, with custom and OEM service covering bespoke sizes, material finishes and layouts. Wardrobe specifications can be sent together with the wider joinery and fixtures package for a single coordinated quotation.
Send us your wardrobe schedule
Share room references, finished dimensions, glass tint preference and door action, and we will return shop drawings for approval before production begins.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com
Factory address: 1st Floor, 2nd Building, District 1, Wanyang Zhongchuang Zone Phase II, No.8, 2nd Road West District, Baochong Industrial Zone, Longjiang, Shunde, Foshan 528318, China