A shelf that arrives "as agreed" is rarely a shelf that fits. On bathroom projects, open shelving is a small line item that causes an outsized number of site problems: it clashes with the towel rail or basin tapware, it sits too close to a shower splash zone, it cannot carry what the client intends to store on it, or the finish does not match the joinery package quoted three months earlier. The fix is not a longer product description — it is a specification that removes every assumption before production starts. This guide walks through how to write that specification for Santerson Freestanding Open Shelves, the made-to-measure unit in our Open Shelving range for residential bathroom projects.
What the product actually is — and what it is not
Santerson Freestanding Open Shelves belongs to the Open Shelving group within our bathroom sanitary fixtures range. It is a free-standing, open-front shelving unit ordered to the dimensions of the room, with the layout, material and finish specified per project rather than selected from a fixed catalogue size.
Because it is freestanding, it does not rely on wall fixings to hold its own weight, which makes it useful in bathrooms with tiled or partition walls where drilling is undesirable, and in fit-outs that may be reconfigured later. Being open-front, everything stored on it stays visible — a design advantage when the styling is deliberate, and a maintenance issue when it is not.
Two points to note before you write the drawing. First, our product page states the range as configurable in finish, layout and dimensions; it does not publish a fixed width, depth, height or load rating, so those values must be confirmed for each configuration rather than assumed from a similar item. Second, this is one of four shelving types in the same collection — Corner Open Shelving for tight returns, Glass Shelves, and Metal Frame Shelves. If the specification does not name which of these is required, the wrong family can be quoted.
Section 1: Location and clearance
Start with the wall elevation, not the product photo. Record the position of the unit against fixed bathroom elements, because shelving is almost always specified after the basin, WC and shower have been set out.
- Overall available width and height of the bay, plus the depth the unit may project into the room without obstructing the door swing or the basin approach.
- Distance from the shower enclosure, bath edge and basin splash zone. Open shelves in a direct splash path collect water and need a different finish decision than shelves on a dry wall.
- Position of towel rails, robe hooks, mirror cabinets, sockets and isolators, so shelf levels do not cross them.
- Skirting, tiled rebate, or a finished wall line that reduces the usable depth at the back of the unit.
- Floor finish build-up. A freestanding unit sits on the finished floor level; state whether the measurement is taken before or after the floor is laid.
Section 2: Dimensions and layout
Give one dimension block per unit, not a range. If several bathrooms in the same project take the same design, issue a separate line for each room with its own size — identical units at different sizes are normal on villa and apartment projects.
| Item to state | Why it matters on site |
|---|---|
| Overall width, depth, height in millimetres, plus tolerance | Sets the production size; tolerances decide whether adjustments are needed at handover |
| Number of shelves and the level of each shelf from the finished floor | Determines what fits between levels — towels, baskets, bottles |
| Fixed or adjustable shelf positions | Adjustable levels need a pitch and a fixing method stated up front |
| Base plinth, legs, or full-height side panels | Affects cleaning access and how the unit reads against tiled walls |
| Back panel or open back | An open back exposes the wall finish behind it, which must then match the rest of the room |
| End treatment: square edge, return to wall, or corner transition | Decides whether a matching corner piece is required |
Section 3: Materials, finish and hardware
Name the substrate, the surface, and the edge treatment separately. "Grey shelf" is not a specification; two buyers can read that as laminate, lacquer or veneer. Our custom furniture materials and finishes service covers bespoke material, texture and finish selection, so the finish decision belongs in the specification rather than being resolved during production.
- Substrate: state the board type and thickness for shelf spans. Long unsupported spans sag; the correct thickness depends on the span you have drawn.
- Surface: laminate, lacquer, veneer or metal, with the reference code from the finish sample you approved — not a colour name alone.
- Edge: matching edge band, solid timber lipping, or a metal edge profile. Visible edges are what give open shelving its quality impression.
- Frame: if the design uses a metal frame rather than a board carcass, state the frame material, section size and finish, and cross-check against Metal Frame Shelves in the same range.
- Hardware: shelf supports, brackets and any fixings, with their finish, so they do not clash with the tapware already specified for the room.
Section 4: Loading and use
This is the section most often left blank. Open shelves fail quietly: a shelf bows, a bracket pulls out, or the unit tips when loaded top-heavy. State what the client intends to store on it.
- Intended use: linen and towels, guest toiletries, decorative items, or heavier stocked goods.
- Per-shelf load and total unit load you need the configuration to carry — write the number you are designing to, then have it confirmed for the specific configuration ordered.
- Whether the unit requires anchoring to the wall once loaded, even though it is freestanding by design. Tall, narrow units with heavy top shelves usually do.
- Exposure: proximity to shower moisture and cleaning chemicals used by the client's housekeeping team.
Our product page explicitly asks buyers to confirm dimensions and intended loading for each project, so treat the load figure as a specification input you supply rather than a published rating you inherit.
Section 5: Tolerances, access and site coordination
A made-to-measure unit only works if the opening on site matches the drawing. Add the coordination notes to the same line item:
- Who measures the final opening, and at what stage — after tiling and floor finishes are complete.
- Delivery route: corridor widths, lift dimensions and stair turns for the assembled or flat-packed unit.
- Assembly on site or factory-built sections, and who carries out installation.
- Protection arrangements if the shelving is installed before final painting or styling.
A specification template you can copy onto your purchase line
| Field | Entry for this unit |
|---|---|
| Product family | Santerson Freestanding Open Shelves, Open Shelving collection |
| Room / schedule reference | Bathroom 02 — Guest ensuite |
| Overall size (W x D x H) | Confirmed site measurement in mm, after tiling and floor finish |
| Shelf count and levels | Number of shelves, level from finished floor, fixed or adjustable |
| Substrate and thickness | Board type and thickness per shelf span |
| Finish reference | Approved sample code, matched to vanity/joinery package |
| Edge and frame detail | Edge treatment; metal frame section and finish if applicable |
| Hardware | Supports, brackets, fixings, all in stated finish |
| Required loading | Per-shelf and total load figure for the configuration ordered |
| Moisture exposure | Dry wall / splash zone / direct spray |
| Delivery and installation | Access route, assembly method, installing party |
How the specification moves into production
Santerson operates as a China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects, with custom/OEM work handled from design through to delivery. For shelving like this, that means your finished specification can travel straight into the same workflow used for vanities, wardrobes and cabinetry in the fit-out: space planning and layout design to place the unit correctly, then custom furniture design and prototyping to fix materials and finish, followed by production and quality control.
The remaining line items belong with the same document. Freight arrangements for a small shelving unit are handled alongside the rest of the fit-out under logistics and door-to-door delivery, and installation and after-sales support covers fitting, inspection of snags and spare parts. A single specification sheet per unit keeps all three stages reading from the same numbers.
Checklist before you send the enquiry
- The product family is named — freestanding, corner, glass or metal frame.
- Every dimension is a confirmed site figure with a stated tolerance.
- Finish is given as an approved sample code, matched to the rest of the bathroom joinery.
- Loading is written down, not implied.
- Moisture exposure and cleaning regime are stated.
- Measurement stage, delivery access and installer are assigned to a party.
Send that and there is nothing left for the factory to guess. The specification becomes the drawing, the drawing becomes the production order, and the unit arrives sized for the room it was measured in.
Prepare the dimension block, finish reference and loading requirement for your bathroom schedule and send them with your enquiry — we will confirm the configuration for that specific project. Contact details are on our contact page, and the full Open Shelving range sits under Bathroom Sanitary Fixtures.