A swim spa quotation is only as good as the specification behind it. This guide walks through the field-by-field product specification for our ten-metre outdoor swim spa, model WS-S10, so buyers, project managers and villa owners can compare configurations on the same basis instead of comparing brochures.
Most confusion in swim spa procurement does not come from price. It comes from two enquiries that look identical but describe different equipment sets: one includes a swim training system, one does not; one is quoted with a heat pump, one without. Writing the specification down before requesting a quotation removes that gap. Below is how we build the specification sheet for Outdoor Swim Spa WS-S10, and what each line means when you read a competing offer.
1. Fix the shell dimensions first, in millimetres
The envelope drives everything else: deck layout, access route for delivery, structural loading and local planning questions. The catalog specification for WS-S10 lists 10000 x 2200 x 1420 mm (length x width x depth). Record the external shell dimension separately from any coping, steps or cabinet cladding you add later, because those items extend the footprint beyond the quoted number.
When you compare models, keep the same three numbers for each. Our Outdoor Swim Spa WS-S12 is specified at 11740 x 2200 x 1470 mm, while a shorter unit such as Outdoor Swim Spa WS-S08M is specified at 8020 x 2260 x 1280 mm. Same category, very different site requirements.
| Model | Catalog dimensions (mm) | Jet total | Total power |
|---|---|---|---|
| WS-S08M | 8020 x 2260 x 1280 | 58 | 6.95 kW |
| WS-S10 | 10000 x 2200 x 1420 | 76 | 7.65 kW |
| WS-S12 | 11740 x 2200 x 1470 | 73 | 7.65 kW |
These figures are the values published in our catalog for each model. Treat them as the starting point for a configuration discussion, not as a fixed promise for a particular order.
2. State the water system as counts, not adjectives
Marketing copy says "powerful massage". A specification says how many pumps and how many jets. For WS-S10 the catalog sheet lists:
- Water pump: 2 pcs
- Filter pump: 1 pc
- Jet total: 76 pcs
- Control system: 1 set
- Total power: 7.65 kW
Counts are auditable. Ask any supplier to fill in the same five lines and you can compare two offers line by line. The total power figure also feeds straight into your electrical planning, which is the item most often discovered late on site.
3. Write "swim training system" as a separate yes or no
This is the single line that changes how the product is used. The catalog specification for WS-S10 does not list a swim training system, while the closely related Outdoor Swim Spa WS-S10-T carries the same 10000 x 2200 x 1420 mm shell and adds a swim training system of 1 set. Identical footprint, different function.
If your brief calls for lap-style swimming against a current, say so in writing and confirm that the model you are quoting includes the swim unit. If the brief is hydrotherapy and family use, you may not need it, and leaving it out keeps the specification honest.
4. List lighting and water treatment as specified items
The WS-S10 sheet shows LED lighting of 1 unit plus 40 small LED lights, and ozone as the treatment feature shown for this model. Both belong in the specification because both affect what arrives in the crate and what your electrician and water-treatment plan assume.
Optional accessories catalogued across our swim and hydrotherapy range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option should appear in the order documents as included or excluded, never as "available on request".
5. Match the specification to the project type
For a private villa terrace, the shortlist usually turns on footprint, jet count and whether the swim unit is required. For a hotel, resort or residential wellness facility, add duty cycle and access: how many users per day, where steps and handrail space sit, and how maintenance reaches the equipment compartment. Buyers specifying wider hospitality packages often pair these units with other outdoor and interior products from the same supplier so that one coordination team handles delivery and after-sales.
Where a standard rectangular shell does not suit the site, our Customizable Shape Outdoor Spa covers square, round, oval and curved configurations with an acrylic shell and structural reinforcement. For a dedicated exercise layout, see the Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool, which separates the swimming channel from a relaxation area.
6. Confirm before you order: the four questions we ask back
1. Which equipment set is included? Pumps, jets, control system and lighting, itemised with quantities.
2. Is the swim training system in or out? Named in the order, not implied by the model number.
3. What are the electrical requirements for this configuration? Total connected load, supply type and protection, confirmed against the final specification.
4. How does the unit reach the site and get set in place? Transport route, lifting or placement method, and the scope of installation support.
Answer those four in your own document before you send an enquiry and you will find that quotations come back comparable, with far fewer change orders later.
Ready to specify yours
SANTERSON is a China-based furniture and building materials manufacturer supplying project customers worldwide. Send us the model reference, the site dimensions and how the spa will be used, and we will return a configuration sheet with equipment counts, options marked as included or excluded, and the electrical data for that build. Browse the full range in Swimming Pools and Swim Spas or start an enquiry through our contact page.