A swim spa that is nearly twelve metres long is not a product you can buy from a brochure page. Outdoor Swim Spa WS-130C III-U sits at the top end of our Swimming Pools and Swim Spas range, and projects of this size succeed or fail on one document: the specification sheet. Below is the method we use with architects, builders and procurement teams to turn a model code into an orderable, installable, quotable package.

Start With the Envelope, Not the Features

The catalog envelope for this model is 11830 x 3000 x 1430 mm. Treat those three numbers as a starting point and confirm each one against your site before anything else is decided, because they drive the rest of the project: how the shell reaches the property, crane or forklift access, the footprint of the deck or plinth, and how much freeboard you keep above the finished water level.

Write the envelope into your specification as three separate lines rather than one string. When length, width and depth sit on their own rows, it becomes obvious which number the site team is questioning, and a change to shell depth no longer gets lost inside a single combined figure.

State the Equipment Count Line by Line

The captured specification for WS-130C III-U lists one control system, four water pumps, one filter pump, a total of 23 jets and five LED lights. Those counts are what you compare between quotations. Two suppliers can both offer "a large swim spa" while one includes four water pumps and the other three with the fourth priced as an option.

Specification lineWhat to confirm in writing
Shell envelopeLength, width and depth as separate values, plus the finished water level relative to the coping.
Control systemQuantity (listed as 1 set), mounting position, and whether the display is rated for outdoor exposure.
Water pumpsListed as 4 pcs. Confirm which jet groups each pump serves and what is included in the base price.
Filter pumpListed as 1 pc. Confirm flow rate against shell volume and the filtration cycle your operator expects.
Jet totalListed as 23 pcs. Ask for a jet layout drawing, not just a count, so you know where the hydrotherapy zone sits.
LED lightsListed as 5. Confirm fitting position, colour mode and whether the controller is shared with the spa system.
Total powerListed as 11.85 kW. Have your electrician confirm supply size, protection and cable route at the actual installation point.

The jet layout drawing matters more than most buyers expect. A count of 23 tells you nothing about whether the massage stations sit where users will actually stand, or whether they face a wall your site has already committed to. Ask for the layout before you sign off the shell.

Separate Standard Content from Options

Catalog-listed options for this model family include control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option needs a yes or no against your configuration instead of a general price list.

Heat pump and insulation are the two lines that change running cost most, and they are also the two most often quoted as "available on request". Fix them at specification stage: an insulated shell specified after production starts is a change order, not an accessory. Sand filtration and UV sterilisation follow the same rule, because both need space in the plant area and a connection to the water circuit.

One gap to close early. The catalog page for WS-130C III-U shows water jets, LED lighting and ozone as the featured functions, while its specification block does not list a swim training system for this model. Other configurations in the same family do carry one. If your brief calls for counter-current swimming or lap training against a current, confirm the propulsion arrangement explicitly before you commit to the 130C envelope, and record the answer on the sheet.

Record What Is Not Yet Decided

A good specification carries an open-items column. For a swim spa of this length the usual open items are: the electrical supply available at the plinth, the drainage and overflow route, the access method for future pump and filter service, the cover arrangement if one is wanted, and the sequence that gets the shell onto the slab before surrounding landscape work closes in.

Leaving these blank on the supplier's side creates silence in the middle of a build. Writing them as named open items with an owner and a date keeps the same information visible to the builder, the MEP engineer and the client, which is what prevents a late change to the plant room.

How We Coordinate This as Part of a Wider Package

Swim spas rarely sit alone in a project. On villa and hospitality jobs they arrive alongside outdoor lounge settings, pergolas and hardtops, paving and cladding, lighting and bathroom fixtures. That is why our Turnkey Solutions approach treats the spa as one line in a single delivery schedule rather than a separate purchase with its own timeline.

As a one-stop project furnishing supplier, we would rather see the spa specification together with the rest of the outdoor and interior package. Sharing one document set across both sides removes the clashes that appear when a shell, a deck and a plant area are each designed in isolation.

Where a project needs something outside the catalog envelope, our Custom & OEM Service covers bespoke dimensions, finishes and configuration changes, working from drawings and 3D models before production. Freight is handled through Logistics and Door-to-Door Delivery, with the paperwork prepared alongside the rest of the shipment, and Installation and After-sales Support covers commissioning, inspection and spare parts after handover.

If you are specifying a swim spa for a current project, send us the model code, the site drawing and the open items above. We will return a configuration sheet that states what is included, what is optional and what still needs your engineer's confirmation.

Send us your swim spa specification

SANTERSON has been manufacturing furniture and building materials since 2008, supplying villa, hospitality and office projects worldwide. Email santerson@qq.com, or contact PHILLIP on +86-13928214007 to review the specification for WS-130C III-U or any other model in the swim spa range.