A swim spa in the middle of a villa or resort package rarely gets the same attention as cabinetry or outdoor lounge sets. It arrives on a different lead time, needs its own power and foundation decisions, and it is usually quoted as a single line item when the rest of the project is being specified. That mismatch is where budgets slip. This guide walks through how we scope and price the Outdoor Swim Spa WS-S06CT inside a multi-product project, so the swim spa line matches the same drawings, freight plan and handover schedule as everything else in the package.

What WS-S06CT Brings to a Multi-Product Package

WS-S06CT sits in our configurable outdoor swim and hydrotherapy range. The catalogue lists it at 5880 × 2380 × 1400 mm, with one control system, one swim training system, one water pump, one filter pump, a total of 31 jets, four LED lights and a total power figure of 8.35 kW. The features shown for this configuration are water jets, LED lighting, ozone and the swim training system.

Those numbers matter to procurement in a very practical way. A unit just under six metres long with a 2380 mm width needs a clear delivery route and a prepared base, which is a civil decision rather than a furniture one. The 8.35 kW total power figure has to be reconciled with whatever electrical design the project already carries for pool lighting, heating and outdoor kitchen equipment. And because the model is listed as configurable, the equipment actually supplied depends on the configuration you confirm at order stage.

Build the Budget in Three Layers, Not One Line

The most common scoping error we see on villa and hospitality packages is a single "swim spa" line in the bill of quantities. Split it instead:

  • Base unit. The shell, control system, pumps, jets, lighting and ozone equipment as listed for the confirmed configuration.
  • Options. Our catalogue lists control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps as options. Availability and compatibility vary by model, so each option needs a written confirmation against WS-S06CT before it goes into the quotation.
  • Site interface. Foundation or plinth preparation, electrical supply and protection, access for delivery and crane or rigging if the site requires it, plus any local permits. These are normally carried by others on site, and they must be named in the scope so nobody assumes someone else has priced them.

Layering the budget this way means a value-engineering decision later — for example moving heat pump or insulation to a phase two — changes one line instead of forcing a full re-quote of the spa.

Compare Within the Range Before You Lock the Model

Once the site constraints are drawn, compare WS-S06CT against nearby models in the same family rather than assuming the first selection is final. The comparison below uses the dimensions and equipment listed in our catalogue for each model.

ModelCatalogue dimensions (mm)JetsTotal powerNotable listed features
Outdoor Swim Spa WS-S06C5880 × 2380 × 140033 pcs9.95 kWThree water pumps, temperature setting; no swim training system shown for this model
Outdoor Swim Spa WS-S06CT5880 × 2380 × 140031 pcs8.35 kWSwim training system, four LED lights, ozone
Outdoor Swim Spa WS-S06CT-L6670 × 2380 × 140031 pcs8.35 kWSame equipment set as WS-S06CT with a longer shell and temperature setting listed
Outdoor Swim Spa WS-S08CT8000 × 2400 × 142035 pcs8.35 kWLarger shell, six LED lights, swim training system

Reading the table this way produces real decisions instead of guesswork. If the client wants lap swimming on a tight terrace, WS-S06CT and WS-S06CT-L both list the swim training system at the same 8.35 kW total power, so the choice becomes footprint and price rather than an electrical upgrade. If the specification calls for more jets and three water pumps, WS-S06C answers that but takes the total power to 9.95 kW, which is a supply-side conversation. And if the terrace can take eight metres, WS-S08CT keeps the same listed total power while adding length and lighting.

Specification note: the figures above are those shown in our catalogue for each model. Because these products are configurable, treat them as the starting point for a written confirmation against your selected configuration — not as a fixed delivery specification.

Scope It With the Rest of the Outdoor Package

A swim spa is almost never the only outdoor item on a villa or resort order. Poolside lounging, shade structures and wet-area finishes are usually specified by the same consultant in the same window, and coordinating them avoids three separate freight movements and three separate installation visits.

Within our outdoor furniture range, aluminium-frame and rope-weave sets, pergolas and gazebos sit alongside the spa on the same delivery schedule. On the finishes side, wall cladding, stone and timber-look surfaces and engineered flooring carry the palette from the pool deck into the adjacent interior. Grouping these under one purchase order also keeps the material samples, mock-up approvals and sign-off in a single correspondence thread.

Where Our Team Joins the Process

For packages that combine swim spas with furniture and building materials, we work through our Turnkey Interior Project Solutions workflow: consultation, design and planning, production, logistics, installation and after-sales. In practice that means:

  • Specification confirmation. Configuration, options and equipment list confirmed in writing before the order is placed, with electrical and access requirements flagged back to the design team.
  • Production coordination. The spa and the joinery, furniture and finish items are tracked on one production schedule, so long-lead items do not arrive after the site is ready and short-lead items do not arrive before the base is poured.
  • Freight. Sea, air and rail forwarding with customs paperwork and door-to-door delivery, arranged so the spa shipment and the rest of the package land in a sequence the site programme can absorb.
  • Installation and after-sales. On-site installation support, inspection and snag lists, plus spare parts and maintenance for the equipment fitted.

For projects sourcing from China for Australian sites, this coordination is the difference between a swim spa that sits on the loading dock waiting for the deck to be finished and one that is commissioned as soon as the surrounding works are ready. Our published project references include villas in Sydney, Melbourne, Perth, Willoughby and North Turramurra, where outdoor areas were furnished alongside interior fit-out.

A Short Scoping Checklist

  • Confirm the model against the available footprint, including clearance for steps and access, not just the shell dimensions.
  • Confirm every option in writing — heat pump, insulation, UV sterilization, sand filtration, control system upgrades — with the configuration you intend to order.
  • Reconcile the listed total power with the site electrical design before the quotation is signed.
  • Name who prepares the base, who supplies and protects the electrical feed, and who handles permits.
  • Align the spa delivery window with the pool deck and outdoor furniture installation sequence.
  • Record spares and maintenance responsibility at handover, alongside the rest of the O&M documentation.

Send us your swim spa line item

Share the drawings, the model you are considering and the rest of the outdoor or fit-out package, and we will return a scoped quotation for WS-S06CT with options, electrical requirements and a delivery sequence that matches your programme.