A folding door order goes wrong long before the first panel is cut. It goes wrong in the brief. Veneer folding doors combine three variables that rarely appear together on a standard schedule: an opening measured to millimetres, a natural wood surface that has to match everything around it, and a leaf-and-hinge mechanism that only works if the leaf widths were decided correctly from the start. This guide sets out what to send us so that Santerson Wood Veneer Folding Doors arrive on site ready to hang, in a finish that matches the joinery they sit beside.

Start with the opening, not the door

Send us the finished opening dimensions, taken after the floor, wall finishes and ceiling are complete, or state clearly which of those finishes are still outstanding. A folding door runs on a top track, so the vertical dimension matters more than it does for a hinged door: you need to tell us the structural opening height and the build-up above the finished floor, because that build-up decides whether we set the head channel below the ceiling line or recess it.

  • Width and height of the finished opening, in millimetres, with the tolerance you can realistically hold on site.
  • Head condition: solid header, steel, or a ceiling void we need to allow for. Track fixings cannot be improvised after delivery.
  • Floor finish at the threshold, and whether you want a floor guide, a recessed bottom pivot or a clear span with no bottom track.
  • What is behind and beside the opening: skirting, architrave, a wall panel run, or an adjoining wardrobe front that the door must align with.
  • Stack direction: which side the leaves fold and park against, and how much wall or reveal is available to receive them.

Decide the leaf layout before you ask for a price

Leaf count and leaf width are the two numbers we cannot guess for you, and they change both the look and the cost. Two leaves across a wide opening park in a deep stack; four or six leaves sit flatter against the wall but add hardware and more vertical shadow lines across the veneer. Tell us how the opening will actually be used — a full-width opening onto a study, or a partial opening that only ever needs to clear half the span — and we will propose a layout around it rather than quoting whatever is cheapest to make.

Detail to specifyWhy it matters
Number of leaves and leaf widthSets the stack depth, the sight lines across the veneer and the load on the top track.
Leading leaf sizeThe leaf that swings first usually gets a wider stile so the hardware can be fixed properly.
Active or fixed panelA fixed return leaf reduces hardware and cost when only part of the opening needs to move.
Top track and pivot typeDetermines how the door carries its weight and whether a bottom guide is needed.
Hardware finishTrack, hinges, handles and pivots should be specified together so they read as one set.

Specify the veneer the way a joinery package is specified

Veneer is where a folding door either disappears into a wall lining or stands out as a mismatch. A written colour name is not enough. Send us the species and cut, the grain direction, and — most importantly — a physical reference: the sample, offcut or approved mock-up that the adjoining joinery was made from. If the doors must match Wood Veneer Panels, wall linings or wardrobes already in the project, say so explicitly and tell us which batch that work came from.

  • Species and cut: quarter-cut, plain-sliced or rift-sawn appearance, and whether book-matched or slip-matched grain is expected across the leaves.
  • Grain direction on each leaf — vertical is normal, but a project that runs grain horizontally needs to say so before pressing.
  • Sheen and coating: matt, satin or open-pore, and whether the surface must take the same topcoat as adjacent joinery.
  • Edge treatment: matched veneer edge banding, solid wood stiles and rails, or a shadow-gap detail.
  • Acceptance reference: name the approved sample or mock-up that both sides will judge delivery against.

Veneer is a natural material. Two panels from the same log can differ in colour and figure once light falls on them differently. Agreeing an acceptance reference before production prevents a dispute after installation, when no correction is cheap.

Tell us what sits behind the doors

Folding doors in residential work are most often specified over storage: a pantry run, a dressing area, a utility cupboard or a media bay. What is behind them changes the specification. If there is a hanging rail, drawer bank or lighting circuit immediately behind the stack side, we need to know so the leaf thickness, pivot offset and handle position clear it. Where the doors close off a wardrobe, tell us whether the adjacent fronts are our work too — Santerson Wood Veneer Hinged Doors or sliding fronts ordered in the same batch will carry a closer colour match than anything pressed months apart.

Cover the practical questions in the first email

The following points cost nothing to answer at the start and are expensive to change later. Put them in writing, even if they look provisional.

  • Project address, delivery point and whether goods land at site or at a depot for redistribution.
  • The package name or project number, so the doors travel with the rest of your joinery rather than as a loose order.
  • Who signs off the shop drawing, and by when — production starts after that approval, not after the purchase order.
  • Whether installation is by your own trades or by us, and who prepares the opening.
  • Quantities per opening. Group identical openings so we press one set of leaves together and keep the grain consistent across them.
  • Any site constraints on handling: lift dimensions, stair access, or a delivery window set by a strata building.

What our reply looks like

Send the details above and you will get back a shop drawing showing leaf layout, stack direction, opening sizes and hardware positions, with the veneer reference recorded on it. Read that drawing carefully — it is the one document both sides sign. After your approval, production follows, then packing and freight under our door-to-door arrangement, with installation and after-sales support available where the project requires it. As part of our Custom Furniture Materials and Finishes service, we also handle bespoke finishes and textures, so a door can be built to an architect's detail rather than to a catalogue profile.

Common briefs that cause rework

  • Structural dimensions sent as finished dimensions. The opening shrinks once plasterboard, tiles and skirting go in. State the stage each measurement was taken at.
  • A colour name instead of a sample. Screens render veneer differently; a photograph is not an acceptance reference.
  • No stack direction. A door built to fold left cannot be reversed on site without re-pressing leaves.
  • Hardware chosen after the doors are made. Handle, pivot and track positions are cut into the leaf during production.
  • One opening quoted as a standard size. Every unit here is made to measure; grouping openings by identical size is what keeps cost down, not nominal sizing.

A short brief template you can copy

ItemYour answer
Opening reference / room 
Finished opening width x height (mm), and measurement stage 
Head condition and available reveal for the stack 
Leaf count, leaf widths, stack direction, active side 
Track and pivot type; bottom guide or clear span 
Veneer species, cut, grain direction, approved sample reference 
Coating and sheen; edge detail 
Hardware finish and handle style 
Quantity per opening reference 
Delivery point, install party, drawing approval date 

Questions buyers ask us

Can the doors match joinery already installed on site?

Yes, if you send a physical sample or offcut from that work. Match to an existing installed surface is harder than matching to a current batch, so we will confirm what is achievable before you commit.

What if the opening sizes on site differ slightly?

Send us each measured size against its own opening reference. Made-to-measure production means an opening can differ from its neighbour; what matters is that every dimension is recorded at the same construction stage.

Can folding doors be used where I also need a hinged or sliding option?

Yes. The veneer and hardware can be carried across our door collections, so mixed openings in one room can share the same specification.

If you have drawings ready, send them with the opening schedule and the veneer reference and we will come back with a layout proposal and shop drawing. If you are still at concept stage, send the elevation and the finish intent — we can work out the leaf layout with you before the joinery package is tendered.