Closet sliding panels look simple on a drawing: two or three leaves that slide past each other and close off a wardrobe opening. The problems start when the panel arrives on site at the wrong size, runs roughly on its track, or does not line up with the wall finish beside it. Most of those problems are decided before production begins, in the brief you send to the manufacturer. This guide sets out what to prepare and what to state clearly when you specify Santerson Closet Sliding Panels for a villa or apartment project.
Start with the opening, not the panel
Sliding leaves need clear space to travel. Before you choose any finish, record the exact width and height of the finished opening at several points — head, sill and mid-height — because walls are rarely square along their full length. Then state the ceiling and floor levels: whether a top track will be exposed or recessed into a pocket, whether a bottom guide sits on the finished floor level, and what floor covering will be laid around it. A panel sized to a structural opening rather than a finished one is the most common cause of rework.
Our listings in the Sliding Panel Systems range are made to measure, with layout, dimensions and finish specified per project, so we would rather receive a rough site survey with clear notes than a polished drawing that hides the unknowns. If an opening is still moving through design, say so and mark which dimensions you want us to hold.
Decide how many leaves and which way they stack
Tell us the number of leaves, the clear access you need when the closet is open, and where the stack should park when it is not in use. A two-leaf set over a narrow bedroom opening behaves differently from a multi-leaf run closing off a walk-in dressing area, and the hardware differs accordingly. If you are weighing sliding against hinged or partition sliding systems for a room divider, send us the plan view and we will advise which configuration keeps circulation clear.
Also state what sits behind the panels. Hanging rails, drawers, pull-out hampers and integrated lighting all need clearance from the panel face, and a drawer that fouls a closed leaf is a complaint nobody wants to handle after handover.
Specify surface, edge and colour as a matched set
Panel faces are where design intent is judged. Our Sliding Panel Systems collection covers wood and textured sliding panels, glass leaves, mirrored fronts and lacquered or veneered surfaces, so the brief should name the finish family and, where relevant, the grain direction and how joints are treated. For a bedroom scheme that also uses our high gloss sliding door wardrobes or matte sliding door wardrobes, tell us which rooms share a finish so we can batch production and keep the tone consistent across units.
Colour needs a reference, not an adjective. "Grey" means nothing across factories; a code, a sample number or a physical swatch does. If you need a match to an existing door or joinery item, send a sample piece and the direction of the light in that room, because the same surface reads differently under warm bedside lighting and cool corridor lighting.
State hardware and movement expectations
Tell us how the panels will be used and by whom. A guest bedroom closet in a private villa opens occasionally; a dressing area in a serviced apartment opens every day by people in a hurry. That affects the track, the soft-close arrangement, the handle or profile edge, and whether a mirrored leaf needs specific fixing detail. If your project has accessibility requirements, acoustic separation, or safety glazing rules for glass leaves, put them in writing in the brief rather than expecting us to infer them — we confirm hardware, safety and glazing requirements per project before production.
Send drawings that answer our questions in advance
A useful brief contains: a dimensioned elevation of each opening with finished levels marked; a plan showing the stack position and swing or slide direction; a finish schedule naming face material, edge treatment, hardware and any glass type; a room-by-room list of quantities; and the installation sequence — who installs, who supplies the track blocking, and what other trades work near the opening. Where we can support this, our design and coordination service covers drawings, production coordination and on-site guidance, and our custom and OEM service handles bespoke finishes and non-standard sizes for whole-house packages.
Agree the check points before we cut anything
For multi-unit projects, ask for a confirmation drawing back from the factory and read it against your own survey. Check the opening dimensions as drawn, the leaf count and stack direction, the finish reference, and the hardware schedule. One hour spent on that drawing is cheaper than a container of panels rebuilt after arrival. Our installation and after-sales support covers on-site fitting, inspection and snag resolution, and our logistics and door-to-door delivery service handles freight, packaging and customs paperwork — but the dimension set that reaches production has to be right first.
A short pre-production checklist
- Finished opening width and height at multiple points, with tolerance noted
- Head, sill and floor conditions, plus the floor covering to be laid
- Leaf count, stack position and clear access required when open
- Interior layout behind the panels: rails, drawers, lighting clearance
- Finish reference by code or physical sample, with grain direction
- Hardware expectation: track type, soft close, handle or profile edge
- Any glass, mirror, acoustic, accessibility or safety requirement stated explicitly
- Quantities per room and the required site delivery sequence
- Named installer and who supplies track blocking and wall preparation
Send that list with your drawings and a manufacturer can quote against real information rather than assumptions. If you are specifying closet fronts as part of a wider fit-out — wardrobes, doors, panelling and joinery from one source — our turnkey project service coordinates the package from design through to handover. Share your drawings and site dimensions with us and we will come back with a configuration proposal and confirmation drawing before anything goes into production.
SANTERSON — furniture and building materials manufacturer, one-stop supplier for villa, hospitality and office projects. Contact PHILLIP: +86-13928214007 (phone/WhatsApp), santerson@qq.com. Send your drawings