A floating TV unit looks simple on a drawing: one clean horizontal band of cabinetry, no legs touching the floor, and a television fixed to the wall above it. That simplicity is exactly why briefs go wrong. Because nothing sits on the floor, every load, every cable and every fixing has to be resolved inside the wall and inside the carcass. If your enquiry only says "wall-hung media unit, 2400 mm long", the factory will quote something that fits the picture but not the room.

The brief below is the list we work from on residential wall-system projects, and it is the same list worth sending to any custom furniture manufacturer you are comparing. Send it in one message and the quotations you receive become directly comparable.

1. The wall, before the cabinet

Floating units hang from the wall structure, so the substrate decides what is possible. Tell the manufacturer what is behind the finish surface — timber studs, steel framing, brick, block, or a framed stud wall with limited noggins — and say whether the wall has already been lined or is still open. A unit carrying a 75-inch screen plus cabinetry needs continuous solid blocking behind the fixing line, not fixings dropped into plasterboard alone.

Also state where the television sits relative to the unit: same wall, offset, or on a return. That determines whether the carcass carries the bracket load or only its own weight, and it changes the internal reinforcement you should be quoted for.

2. Dimensions that actually matter

Give overall length, height and depth, then add the numbers a shop drawing cannot infer:

  • The finished floor level, and whether the floor covering is already laid — suspended timber over joists behaves differently from a slab.
  • The clear gap you want between the floor and the underside of the unit. This drives cleaning access, skirting returns and how the plinth detail reads.
  • Whether the unit wraps around or stops short of internal corners, windows and door reveals.
  • The screen centre height, so the bracket position and the cabinet top edge are coordinated rather than argued about on site.

Made-to-measure sizing is normal for this product type. Our Floating TV Units in the Media & TV Walls collection are specified per project — length, height, depth, layout and finish all set from the site dimensions rather than chosen from a fixed size ladder.

3. Storage layout, room by room

Describe how the unit is used, not just how it looks. A media wall in a family living room and a feature unit in a guest suite rarely need the same internals.

  • Closed versus open: which items must be hidden (consoles, routers, board games, chargers) and which are on display. Mix the two deliberately instead of defaulting to all doors.
  • Door type: hinged, lift-up flap, or drawer. Each needs different clearance in front of the unit and different hardware behind it.
  • Shelf spans: long open shelves carry books and objects and will deflect over time if the board and span are not matched. Send the intended load.
  • Handles or none: pull-free fronts with integrated profiles read cleaner, but confirm what your budget allows on every opening.

4. Cables, sockets and equipment heat

This is the section most briefs leave out, and it is the one that costs the most to fix after installation.

  • Tell the manufacturer where the power and data outlets land relative to the unit, and whether they sit behind the carcass or in an adjacent reveal.
  • List the equipment you intend to keep inside the cabinet, and whether any of it needs ventilation. Sources, amplifiers and consoles produce heat; sealed cabinets with no airflow will throttle them.
  • State who is cutting the cable access holes — factory or site — so openings line up with the shelf layout instead of being drilled wherever a wire happens to fall.
  • If you want integrated LED media units, say where the transformer sits and who supplies it. Lighting needs a serviceable location; a driver buried behind a sealed end panel is not maintainable.

5. Finish, substrate and edge detail

Be specific about the surface, because "matte black" means different things in melamine, lacquer, veneer and powder-coated metal, and they wear very differently in daily use.

  • Name the substrate you want quoted — engineered board, MDF, plywood or solid timber — and let the manufacturer advise where a cheaper core is acceptable.
  • Specify the finish system and sheen level, and ask for a physical sample of the exact batch before production.
  • Ask how edges are handled: 2 mm ABS edge banding on a visible front edge reads differently from a thin laminate edge, and it takes knocks far better.
  • Where the unit meets stone, tile or plaster, state who is responsible for that junction and what tolerance is expected. A shadow gap has to be designed; otherwise it appears by accident.

6. What a usable drawing pack looks like

Before you release an order, ask for a shop drawing that shows the elevation with finished levels marked, the fixing line and blocking detail, cable and socket positions, internal elevations for every opening, and the hardware schedule. If a supplier cannot produce that pack, they are quoting a product, not solving your wall.

At SANTERSON this sits inside our interior design services: space layout planning, concept and mood direction, furniture layouts with 3D visual renderings, and project design coordination covering drawings, production coordination and on-site guidance. The cooperation sequence we work to is brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up.

7. Delivery, installation and who does what

A floating unit fails or succeeds at the fixing stage, so settle responsibility in writing before goods leave the factory. Confirm whether the units arrive flat-packed or assembled, how they are packed for sea freight, and who carries out wall fixings on site.

Our logistics and door-to-door delivery service covers international freight forwarding by sea, air and rail, customs paperwork such as commercial invoices, packing lists and certificates of origin, packaging and container loading, shipment tracking and delivery to the project address. Import terms, duties and transit time are confirmed per project rather than assumed. Our installation and after-sales support covers on-site installation, inspection and snags, warranty coverage, spare parts and replacement, and ongoing maintenance.

Send the wall construction, the finished levels, the equipment list and the storage layout in your first message. Those four items decide the price and the shop drawing; everything else is finish.

What to send in your first enquiry

ItemWhy the manufacturer needs it
Wall type and whether the wall is open or linedDetermines blocking, fixing method and internal reinforcement
Floor finish status and finished floor levelSets the underside clearance and skirting/junction detail
Screen size, bracket type and centre heightDecides load path and whether the carcass carries the screen
Equipment list and ventilation needsDrives cable routing, cut-outs and heat management
Storage mix: doors, drawers, open shelvesSets hardware schedule, clearances and shelf spans
Finish, substrate and edge preferenceAllows an accurate quotation instead of a placeholder price
Site location, access and delivery termsAffects packing, freight mode and installation planning

Common brief gaps we see on site

The unit is quoted before the wall is opened. Blocking cannot be added after the plasterboard is up without cutting back. Sequence the survey with the first fix.

Sockets land behind a fixed shelf. Mark outlet positions on the drawing pack, then check them against internal elevations before production.

Long open shelves with no span note. Ask for the board thickness and maximum span for your intended load; do not accept "looks fine" as an answer.

No sample held before production. Finish names travel badly between factories. Approve a physical sample against your drawing, and keep it for reference at handover.

Brief us on your media wall

SANTERSON is a China-based manufacturer and one-stop supplier of furniture and building materials, working with villa, hospitality and office projects since 2008. Media walls, joinery and matching cabinetry are produced under the same project coordination as the rest of the fit-out, so the TV unit, the shelving and the wardrobes share one set of levels, one finish schedule and one delivery window. If you have drawings or a site measurement, send them and we will come back with a shop drawing and an itemised quotation.

SANTERSON — furniture and building materials manufacturer, one-stop project supplier

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com

Enquiries: https://www.santerson.com/contact/