A set of classic French double doors can carry the character of a whole villa or hotel suite, and it is also one of the easiest items for a project to get wrong. Glass thickness, muntin spacing, leaf width, frame depth and swing direction all sit in a drawing that never quite reads the same way twice. When you send your enquiry to a furniture and building materials manufacturer, the quality of the answer you receive depends almost entirely on how specific the request is. This guide walks through the information that lets a factory quote, build and ship doors that fit the opening on site.

Why custom French double doors need a fuller brief than standard doors

A standard hinged door usually comes in a shortlist of stock sizes, so the buyer picks one and moves on. A classic French double door is different: two leaves meeting at a centre mullion, glazed lights that must align with the room's sightlines, and moulding profiles that have to match the architraves, wardrobes and wall panelling already specified for the project. At SANTERSON these doors sit in the interior doors range, and each product is described as made-to-measure, with material and finish options and a layout tailored to the project, with dimensions and selected specifications confirmed per project.

That wording matters commercially. It means nothing is decided for you, and it also means an incomplete enquiry produces an incomplete price. The buyers who get fast, comparable quotations are the ones who supply the opening geometry, the style reference and the performance expectations in one package.

Information to prepare before you send the enquiry

Send these items together. A manufacturer can work from a partial set, but every missing item turns into a round of questions and a revised quotation.

  • Opening dimensions and floor levels. Structural width and height, the finished floor level on both sides, wall build-up and lining depth. Note out-of-plumb or out-of-square conditions rather than assuming the opening is true.
  • Leaf layout and operation. Which leaf is active, which is fixed, hinge side, inward or outward swing, and whether an intermediate mullion or a removable mullion is wanted for the classic panel look.
  • Style reference. A drawing, a marked-up plan, or a link to the collection you are working from. Our range includes Classic French Double Doors, arched heads and slim-frame versions, so naming the profile family narrows the discussion quickly.
  • Glazing intent. Number of lights per leaf, light proportions, glazing type and whether obscure or clear glass is required. For privacy-sensitive rooms, related options such as glass sliding doors are worth pricing in the same enquiry.
  • Finish and matching schedule. Paint code, stain, lacquer or veneer species, plus any items the doors must match, such as classic panel hinged doors, skirting and built-in cabinetry.
  • Hardware assumptions. Handle and lock body type, whether hardware is supplied by you or by the factory, threshold and floor-guide details for the passive leaf.
  • Quantities, locations and programme. A door schedule listing each opening, its room, quantity and required delivery date. This is what allows a realistic production slot to be reserved.

How the doors are configured on request

The table below reflects how the range is described on site: sizing, materials and layout are all specified by the project. It is a working checklist for your schedule, not a fixed specification.

ParameterWhat you specifyWhy it affects the quotation
SizeMade-to-measure width, height and frame depth per openingOversized or non-standard leaves change construction, glass area and handling
Material and finishTimber or engineered substrate, paint, lacquer or veneer speciesFinish system drives cost and must match other joinery on the same job
LayoutLeaf widths, glazing pattern, mullion detail, arched or square headEach change alters moulding runs, glass cuts and assembly time
ConfirmationShop drawings signed off before production startsProtects both sides once frames are on site

Where a project needs doors, cabinetry, wall panelling and other joinery from one source, group them in the same brief. Buyers working with a one-stop project furnishing supplier can align finishes across trades and consolidate shipments instead of reconciling three separate deliveries.

The coordination steps from enquiry to handover

SANTERSON describes its project workflow as consultation, design and planning, production, logistics, installation and after-sales. In practice the door package moves through it like this:

  • Enquiry review. The factory reads your schedule and flags anything that cannot be built or shipped as drawn.
  • Shop drawings. Elevations for each opening with dimensions, glass layout and finish callouts. Check the swing direction and hinge side on this drawing; it is the most common error to reach production.
  • Confirmation and quotation. Detail sign-off fixes the price and starts the production slot.
  • Production and quality checks. Frames, leaves and glazing are assembled to the approved drawings.
  • Packaging and freight. The logistics service covers sea, air and rail forwarding with customs paperwork, packaging and container loading plans, shipment tracking and door-to-door delivery. Confirm Incoterms, insurance and the delivery address for your own job.
  • Site installation and handover. Frames go in before wet trades finish, leaves hang last. Record any snags on the handover list while there is still time to correct them.
Checklist for the drawing sign-off: swing direction, hinge side, finished floor levels, glass light count and spacing, finish code, hardware cut-outs, frame depth against the wall build-up. One hour on this page saves a re-production order.

Common briefs that cause rework

  • A style photo with no dimensions. The reference sets the profile; it does not tell anyone the opening size or glass proportions you expect.
  • Finish described in words only. "Warm oak" and "natural wood" mean different things to different factories. Give a code, a sample reference or an existing item to match.
  • Levels left open. If the finished floor level is not fixed, frame heights cannot be confirmed, and thresholds become a site problem.
  • Hardware assumed but never stated. Lock bodies and handle spindles need cut-outs; adding them after finishing leaves visible corrections.
  • Doors scheduled alone. When architraves, skirting and adjacent cabinetry come from another supplier, matching tones are decided on site under time pressure.

A short brief template you can copy

Project name and location; opening list with width, height and wall depth for each set; active and fixed leaf per opening; swing direction; head shape (square or arched); glazing pattern and glass type; finish reference and items to match; hardware responsibility; quantity by opening; required delivery date and delivery address; drawings attached.

Send that, and a manufacturer can price the package properly, flag constructability issues early and reserve production capacity against your programme. If you are specifying doors alongside other joinery for a villa or hospitality project, contact SANTERSON with your door schedule and we will review it against the interior doors range.

Have drawings or a door schedule ready? Share the openings, finishes and programme, and receive a specification review with a quotation for the full set.