A swim spa of this size is not an off-the-shelf purchase. Before the first container is booked, the buyer and the supplier have to agree on the shell footprint, the equipment inside the cabinet, the power that reaches the pad and the sequence of site works. The checks below are the ones we ask our own project teams to complete, written so you can run them against any quotation for an Outdoor Swim Spa WS-S06 and compare answers rather than prices.
Start With the Shell, Not the Jet Count
The catalog lists the WS-S06 at 5820 x 2220 x 1110 mm. Treat that as a starting envelope and confirm three separate dimensions with the supplier: the external shell you need to transport and set into place, the water depth you actually swim or soak in, and the clearance needed around the cabinet for the plant and for servicing. A quotation that only repeats catalog numbers has not answered the site question.
Ask which variant of the S06 family is being quoted. The variants differ more than the model suffix suggests. WS-S06B is listed at 5800 x 2200 x 1250 mm with three water pumps, 48 jets and a total power figure of 13.35 kW. Outdoor Swim Spa WS-S06M is listed at 5900 x 2200 x 1610 mm with two water pumps, 48 jets and 6.95 kW. Same family, very different pad depth, electrical supply and transport profile. If your consultant has drawn a recessed installation, that difference in shell height decides whether the civil works are feasible at all.
Request the dimensioned drawing for the exact model code on the quotation, not a generic family image. Model letters change pump count, total power and shell height.
Read the Specification as an Equipment List
The WS-S06 specification sheet lists one control system, two water pumps, one filter pump, 56 jets in total, LED lighting together with a set of small LED lights, and a total power figure of 6.35 kW. Features shown for the model are water jets, LED lighting, ozone, a waterfall and four water columns. What that sheet does not tell you is how the equipment is arranged or what your site has to provide.
A competent supplier will answer the following in writing:
- Pump allocation. Which of the water pumps drive the jets, which drive the waterfall and the four water columns, and what happens to the jet experience if one circuit is switched off during maintenance.
- Filtration duty. The filter pump turnover rate against the water volume of the quoted configuration, plus whether the stated filtration is cartridge or sand. Sand filtration appears on our option list, but it needs space beside the cabinet and you should confirm both the footprint and the plumbing route.
- Sanitisation scope. Ozone is listed for this model. If your operator wants UV sterilization as well, that is an option we quote separately, and it changes the control panel layout.
- Power and protection. The total power figure covers the equipment as configured. Confirm supply voltage and phase, circuit sizing, the location of the isolator, bonding and earthing details, and whether a heat pump is included or excluded from that figure.
- Heating and insulation. A heat pump and insulation are options rather than defaults in our catalog. For year-round use they usually matter more than jet count, and they change both the running set-up and the cabinet build.
- Access items. Steps, seating and any cover need to be on the same order, because they affect delivery packing and the installation sequence.
If a supplier cannot walk you through these points on a single call, they are unlikely to coordinate them across production, freight and site either.
Test Whether One Party Owns Delivery and Site Works
A swim spa arrives as an oversize shipment with water, electrical and structural dependencies at both ends. Our Furniture Logistics and Door-to-door Delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading plans, shipment tracking and delivery to the site address. Ask any supplier for the same specifics: the packing method for the shell, the lifting points they expect on site, who supplies the crane or forklift, and which documents travel with the consignment.
Then check who carries the work after the truck leaves. We list installation and after-sales support as a defined stage, including site installation, inspection and snag lists, warranty coverage, spare parts and ongoing maintenance. For a project buyer the practical question is which of those stages are contracted, by whom, and in which country. A supplier that handles production only can still be the right choice, provided your local contractor is briefed on the equipment schedule before the slab is poured.
Check the Supplier Can Coordinate a Swim Spa With the Rest of the Build
Swim spas rarely sit alone. On villa and resort projects the water feature sits next to outdoor furniture for villas and resorts, hard landscaping, pergolas, poolside lighting and sometimes an outdoor kitchen or changing area. Splitting those packages across unrelated vendors is where finishes stop matching and where the site programme slips.
We work as a one-stop furniture and building materials supplier, which means the swim spa, the poolside loungers, the decking and cladding, the exterior lighting and the interior fit-out of the adjacent building can be specified against one set of drawings and one production schedule. Where a finish or dimension has to match across two product families, our design and production teams reconcile it in-house instead of leaving it as an open point between vendors.
Ask What Happens When the Configuration Has to Change
Project requirements move. A client may want a different water column layout, a revised lighting scheme, a cabinet finish that matches the villa facade, or a spa that carries their own branding for a resort group. Under our custom and OEM service we handle bespoke sizing and finishes, prototyping and material selection, and private labelling where required. Ask any supplier three direct questions:
- Which changes are engineering work and which are cosmetic, and how does each one affect lead time?
- Who redraws the equipment schedule after a change, and does your site team receive the revised drawing?
- What is the minimum order quantity for a modified configuration on a single project?
Vague answers here usually surface later as variation orders.
A Shortlist Worth Comparing
If the S06 envelope does not suit the site, look across the wider swimming pools and swim spas range before you change supplier. The range includes long-format swim spas built for hydrotherapy and relaxation, spa models with massage jets combined with LED and water features, round hot tubs with hydrotherapy jets and underwater lighting, and square spa formats with waterfall features. Comparing configurations within one manufacturer also keeps spare parts, control systems and servicing on a single support path.
Before you sign: the six documents to request
- Dimensioned drawing for the exact model code, including cabinet clearances and access panels.
- Equipment schedule listing pumps, jets, filtration, sanitisation and lighting as configured.
- Electrical requirement sheet: supply, circuit protection, bonding and isolator location.
- Packing, lifting and delivery plan with the agreed Incoterms and site address.
- Written scope of installation support, snag inspection and warranty terms for your country.
- Spares list with part codes for pumps, filters, controls and lights.
Send us the model code, the site drawing and the equipment you expect, and we will confirm the configuration, the electrical requirement and the delivery plan before any production commitment. Contact details are on our contact page.
Figures quoted above are catalog values for the referenced models. Included equipment, options and electrical requirements vary by configuration and are confirmed on the order.