A wardrobe quote is easy to compare on price and hard to compare on substance. This guide walks buyers, builders and project coordinators through the specific questions that separate a workable textured melamine wardrobe proposal from one that will cause problems on site.

Textured melamine panel is a common choice for bedroom storage because it gives a wood-grain or matte surface without the cost and finishing work of solid timber. Because the material looks similar across suppliers, two quotations can appear identical while covering very different scopes. The differences show up later: in how the carcass sits against an uneven wall, whether the doors align after a season of humidity change, and whether the interior layout actually matches how the room is used.

Use the checklist below when you read a proposal from any manufacturer. Each item is something you can ask for in writing before you place an order.

1. What is actually being quoted

Start by confirming that the scope on paper matches the scope in your drawings. A proposal should state, room by room, the overall width, height and depth of each unit, and how it handles the awkward parts of a real room: skirting boards, cornices, power points, light switches, air-conditioning returns and out-of-plumb walls.

  • Are dimensions given as finished external sizes, with clearances for scribes and packers shown separately?
  • Does the quote include scribing to uneven walls and floors, or is that treated as site carpentry on your side?
  • Is a soffit, filler panel or top closure included where the wardrobe does not reach the ceiling?
  • Are door swings and drawer run-out checked against beds, room doors and nearby furniture shown on the layout?

2. Panel specification, stated precisely

Ask for the panel build to be written out rather than described as “melamine”. A usable specification names the substrate, the panel thickness for carcass, doors and shelves, and the edge treatment.

ItemWhat a clear proposal statesWhy it matters
SubstrateThe engineered board used under the melamine surface, and its gradeDetermines screw-holding, sag resistance and how the unit behaves in humid rooms
ThicknessSeparate figures for carcass, doors and shelvingThin shelves across long spans deflect; heavy doors need adequate thickness and hardware capacity
Edge bandingMaterial, thickness and whether all visible edges are bandedUnbanded or thin edges are the first place moisture damage and chips appear
Surface textureThe specific textured melamine decorative, referenced by sample or code“Textured” covers a wide range of grain depth and sheen; confirm against a physical sample
Fixing methodHow the unit is secured to wall and floor, and to whatAffects stability on tiled or lightweight partitions

Where a supplier offers made-to-measure sizing with material and finish options, as our Textured Melamine Wardrobes collection does, treat the confirmed specification sheet as the contractual document. Confirm dimensions and selected specifications for each project before production starts.

3. Interior layout matched to the user

The interior is where a wardrobe earns or loses its value. A proposal that shows only an elevation of the outside tells you nothing about usability. Ask for an internal elevation for each bay.

  • Hanging heights set to the garments actually stored: full-length, short hanging, and a double-hang section if the room needs it.
  • Drawer count and depth stated per bay, rather than “drawers as required”. Drawer focused modular wardrobes suit bedrooms without a separate chest of drawers.
  • Shelf spans and spacing; deep shelves for folded linen need different support than display shelving. Shelf focused modular wardrobes work where folded storage dominates.
  • Lighting provisions: whether a conduit, wiring route or recess for a door-triggered fitting is shown on the drawing.
  • Accessories priced separately and clearly: trouser slides, jewellery trays, valet rods, safe box, soft-close hardware.

4. Door type decided by the room, not by taste

A good proposal explains why a door type was chosen for that particular plan. Sliding doors save circulation space in narrow bedrooms but need clear run height and reliable track hardware. Hinged doors give full opening access and better sightlines inside, but need clearance to swing. Walk-in layouts change the answer again.

Check what the quote says about hardware brand or grade, load rating for the door weight, and whether tracks and runners are included in the unit price or listed as extras. Frame-and-glass alternatives sit in a different price band; aluminium frame glass wardrobes are worth pricing against textured melamine when the bedroom scheme calls for a lighter, more transparent front.

5. Finish range and how it is verified

Texture reads differently under warm bedroom lighting than under a showroom downlight. Before accepting a finish, ask which decorative options exist in the same panel build and request physical samples of the two or three finalists. The melamine wardrobe range covers several surface directions that are easy to confuse on a screen:

Ask how the supplier keeps colour consistent across a multi-room order, and whether doors, carcass and any matching textured melamine cabinets in an adjacent space are produced from the same batch. Matching joinery across bedroom, hallway and laundry is far cheaper to arrange at quotation stage than to fix after delivery.

6. Drawings, approvals and who signs them off

For a villa or multi-apartment job, the drawing set is where errors are cheapest to correct. A serious proposal includes shop drawings for approval, states how many revision rounds are included, and identifies what happens if a site dimension differs from the drawing when the unit arrives.

  • Shop drawings with dimensions, hardware schedule and finish codes issued before production.
  • A named coordination contact who talks directly to your site team or builder.
  • A written change process: what a revision costs, and the cut-off after which changes cannot be made.
  • For larger scopes, design support covering space planning and 3D renderings alongside production coordination — the kind of interior design service that removes a separate drafting step from your programme.

7. Packing, delivery and installation terms

Wardrobes are bulky, and damage in transit is one of the most common reasons a project loses time. Ask how panels are protected, how hardware is kitted and labelled, and how cartons are marked against room and bay so that installers can work from the drawings without opening everything.

Then establish where the supplier's responsibility ends. Cross-border orders need a clear delivery address term, an agreed unloading arrangement, and confirmation of who provides the fixing crew. If the same supplier also handles turnkey interior project solutions, wardrobes can be coordinated with the rest of the joinery and loose furniture in one shipment and one site programme, which usually reduces both freight cost and the number of trades on site.

8. After handover

Close out the proposal by asking what happens if a door needs adjustment, a hinge fails, or a panel is damaged on site. A workable answer names who attends, what parts are held, and how quickly replacement panels can be re-made in the same decorative — because a textured melamine colour matched at order stage cannot always be matched years later from a new batch.

A short comparison sheet to send back to suppliers

Rather than asking ten separate questions, send one table and require every bidder to complete it. That is the fastest way to see which proposal is genuinely comparable:

Line itemRequired answer
Carcass, door and shelf thicknessNumeric, per component
Edge bandingMaterial and thickness; which edges covered
Textured melamine decorativeSample or code reference
Hinges, slides, sliding hardwareMake, grade, load rating
Scribing and out-of-plumb allowanceIncluded or site work
Internal layout drawingsNumber of bays detailed
Revision rounds and change cut-offCount and stage
Packing and carton markingMethod described
Delivery term and installation scopeWhere supplier responsibility ends
Warranty, spare parts and re-make routeTerms in writing

If a bidder will not complete the sheet, that is your answer. A manufacturer confident in the specification has no reason to leave it blank.

Send us your wardrobe drawings

SANTERSON manufactures made-to-measure built-in furniture for villa, hospitality and apartment projects, with material and finish options specified per project. Share your floor plans and the finishes you are working towards, and we will return a specification sheet and internal layout for review before anything goes into production.

Contact us to start a quotation.