Pocket doors disappear into the wall, which is exactly why they are so easy to get wrong. A hinged door can be corrected on site with a pack of shim or a re-hung frame; a pocket door that was measured late, ordered to the wrong opening depth or delivered without the right lining system usually means cutting into finished walls and starting again. That is why most project buyers who specify them more than once stop buying off the shelf and move to OEM sourcing, where the leaves, frames, finishes and hardware are built around the drawings of their own job.
If you are specifying classic pocket doors for villas, apartments or hospitality rooms, this is the sequence we work through with a buyer, stage by stage, and what you need to have ready before production starts.
What OEM actually changes compared with catalogue buying
Catalogue purchasing means you take the sizes and finishes a factory already runs, then adapt the building around them. OEM sourcing reverses it: your drawings drive the product. For pocket doors that difference is practical rather than cosmetic.
- Opening depth and rough-in come first. A pocket door only works if the wall cavity takes the leaf, the sliding gear and the lining system together. Under OEM you confirm the finished wall build-up — plasterboard layers, insulation, structural studs — before the frame is made, not after the joinery arrives.
- Leaf construction follows the use. A bedroom in a private villa, a hotel guest room and a service corridor take different leaf cores and edge details. We make the leaves to the specification you sign off rather than pushing one standard panel across a whole project.
- Finish is matched to the rest of the joinery. Our wood veneer pocket doors can be specified to sit with matching veneer wardrobes, wall panelling and cabinetry on the same floor, so the sliding face reads as part of the wall rather than a separate purchase.
- Glass or solid, per elevation. Glass pocket doors suit studies, pantries and en-suite connections where borrowed light matters; solid faces suit bedrooms and corridors. With OEM you mix both on one order and keep the ironmongery consistent.
- Your brand and packaging, if you need them. Distributors and builders specifying under their own name can request engraving, embossing, logos and packaging as part of the Custom & OEM service.
The six stages of an OEM pocket door order
| 1. Brief and elevations | You send the room layout or door schedule — opening widths, finished floor levels, wall build-up, and which doors slide left or right. Our design team turns that into production drawings for your sign-off. |
| 2. Specification and quotation | Leaf core, face material, veneer species or paint finish, glass type where used, ironmongery, track and lining system, plus quantities by floor or unit type. You confirm the details before anything is cut. |
| 3. Prototyping where it matters | For a first project with us, or a new finish, we produce a sample leaf and frame so you can see the colour, grain direction and edge detail in real light before the full run. |
| 4. Production and quality control | Made-to-measure manufacturing at our China factory, with dimensional checks against the approved drawings and finish inspection before packing. |
| 5. Packing and freight | Doors are packed for sea, air or rail freight with commercial invoices, packing lists and the paperwork your customs broker needs, then tracked through to door-to-door delivery at site. |
| 6. Installation support and after-sales | We support on-site fitting, inspection and snag resolution, plus spare parts such as replacement tracks, rollers and handles for the hardware that wears first. |
Order quantities are flexible, which matters on phased work: a buyer can release the first villa or the first room type, review it on site, then place the remainder against the same approved specification.
What you need to have ready before we can quote
- A door schedule: opening width and height for each type, plus which side the pocket sits on.
- The finished wall build-up — board thicknesses and total cavity depth available for the lining system.
- Finished floor levels, so the track height is set against the completed floor rather than the slab.
- Face finish decision: painted, veneered or glass, with the sample or reference you want matched.
- Ironmongery preference — flush pull, D handle, or a concealed option — and whether locks are required.
- Quantities by type, and how the project is phased for delivery.
Why buyers group pocket doors with their other joinery
The reason OEM sourcing succeeds is rarely the door itself; it is what travels with it. A villa or apartment package that puts pocket doors, wardrobes, kitchen cabinetry, wall panelling and flooring on one purchase order gets a single specification owner, one set of coordinated finishes, consolidated freight and one point of contact for snags. Split across five suppliers, the same job produces matching disputes and delivery sequences nobody owns.
SANTERSON has been manufacturing furniture and building materials in China since 2008 and works as a one-stop furniture and building materials supplier, covering design consultation, custom and OEM production, door-to-door logistics, installation support and after-sales service. Doors are one part of that package alongside the joinery and finishes they have to match.
Australian work we have published includes villa projects in Sydney, Melbourne, Perth and Willoughby, where cabinetry, joinery and loose furniture were coordinated as a single delivery. If you are sourcing through a furniture and building materials supplier Australia teams can rely on for joinery-scale accuracy, send the door schedule and we will quote it against your drawings.
Specifications, finishes and freight arrangements are confirmed project by project against approved drawings; the details above describe our standard OEM process rather than a fixed product datasheet.