On a villa or resort scheme, the swim spa is rarely a standalone purchase. It sits against paving, shares a plant room with outdoor seating and shading, and lands on the same electrical and drainage decisions as everything else on the terrace. That is exactly why we keep being asked about Outdoor Swim Spa WS-PC08ST: it is a long, narrow hydrotherapy pool that slots into a tight side set easily — but only if someone coordinates it with the rest of the package from the start.
What the catalogue actually lists for this model
Before talking about coordination, it is worth being precise about what we can confirm. The published specification for WS-PC08ST gives overall dimensions of 8000 × 2400 × 1470 mm, one control system and one swim training system, one filter pump, six water jets in total, four LED lights, and a total power figure of 6.55 kW. The features shown on the page are water jets, LED lighting, ozone and a swim training system. It is a configurable product: the catalogue presents control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as options that vary by build.
Two things in that list matter commercially. First, the footprint is narrow at 2400 mm but long at 8000 mm, so this model behaves more like a lap channel with a small massage end than like a square spa. Second, some equipment fields on the page are not fully stated — the water pump quantity in particular is left open, and options such as heat pumps, UV sterilisation, sand filtration, insulation and steps are listed as configurable rather than fixed. So treat 6.55 kW as the figure for one particular configuration, and confirm the exact build, including electrical supply requirements, against your selected specification before any electrical or civil work is signed off. Jet count matters the same way: six jets across an 8 m shell means the massage positions are few and specific, which is a layout decision rather than a brochure one.
| Item | As listed in the catalogue |
|---|---|
| Model | WS-PC08ST |
| Overall dimensions | 8000 × 2400 × 1470 mm |
| Swim training system | 1 set |
| Control system | 1 set |
| Filter pump | 1 pc |
| Water jets | 6 in total |
| LED lights | 4 |
| Total power | 6.55 kW (configuration-dependent) |
| Configurable options | Control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation, steps |
Why the swim spa belongs in the package, not at the end of it
When a swim spa is bought late, the project pays for it twice: once in rework around the plant room and power run, and once in freight, because an item nobody planned for arrives on its own schedule. When it is inside the package from the design stage, the same shell detail that carries your outdoor furniture also carries the spa deck, the shading structure and the drainage fall.
We work as a one-stop furniture and building materials supplier, so the pool shell is one line among many on the same production plan: paving and wall finishes, pergolas and louvred roofs, seating for the spa deck, sun loungers, bathroom ceramics for the changing rooms, lighting, joinery and cabinetry. One specification sheet, one factory schedule, one consolidated shipment — and one party who knows that the 8000 mm spa length has to clear a structural column before anyone orders the louvers above it.
Four coordination points that decide whether it fits
1. Access route and crane or lift plan
An 8 m shell cannot turn a tight garden corner. Confirm the delivery path, gate width and turning space before production, not at handover. Where side access is restricted, tell us early: the swim spa range includes other footprints in this series, including a longer version of this model and wider configurations, so the choice of model can be made together with the site constraints rather than against them.
2. Structure, sub-base and drainage
The 1470 mm depth sets how much of the shell sits proud, flush or recessed, and that decision drives the sub-base, the retaining edge and the overflow arrangement. It also determines what the surrounding paving detail looks like, which is why the paving material and the spa setting should be drawn together.
3. Power and plant location
With a swim training system, filter pump, jets, ozone and lighting all on the same circuit group, the electrical route needs to be planned with the pool equipment location fixed. Because power totals shift with the chosen options — heat pumps in particular change the load — we recommend locking the option list before the electrician prices the run.
4. The outdoor room around it
A swim spa used year-round needs somewhere dry to sit next to it. A motorized louvered aluminium pergola gives a poolside lounge that can be opened or closed against sun and side rain: the rotating louvers form a watertight roof when closed, built-in LED strips remove the need for extra fixtures, and zip screens on any side cut glare and improve privacy without fully enclosing the space. Because bay dimensions, frame colour and screen transparency are made to order, the structure can line up with the spa deck instead of fighting it.
How a coordinated package moves from drawing to handover
For projects we handle this way: a brief and space plan, then concept design with layouts and 3D renderings so the pool terrace can be reviewed as a whole; quotation and line-by-line detail confirmation; production with quality control; freight by sea, air or rail with the paperwork handled; and installation support with inspection at handover. Our turnkey solutions cover villa, hospitality and office work, and where a design calls for something non-standard — a different shell colour, a bespoke deck edge, custom seating dimensions to match the spa line — our custom and OEM service covers prototyping, material and finish selection and branding. A powder-coated aluminium outdoor lounge set with weather-resistant cushions, for example, can be ordered to a custom finish, fabric and dimension so it reads as part of the same terrace scheme as the spa.
For Australian villa and resort work specifically, sourcing through one supplier means the pool shell, the outdoor furniture, the wall and floor finishes and the interior fixtures arrive as one programme rather than five. We publish our project cases, which include villa work in Sydney, Melbourne, Perth and Willoughby, so buyers can see the kind of projects we deliver; import terms, duties and delivery scope for a specific site are confirmed case by case, and local electrical and building requirements should always be checked with your local engineer and certifier.
Questions procurement teams ask us about this model
Can it be installed partially in-ground? The catalogue depth is 1470 mm, and recessed, semi-recessed and above-deck settings are all workable arrangements. Which one you choose depends on the sub-base, drainage and access the site allows — send us the section drawing and we will confirm the shell and deck detail against it.
Is 6.55 kW the whole load? It is the total power figure published for the listed configuration. Adding options such as a heat pump changes the load, so the final electrical schedule follows the confirmed option list.
Can it ship with the rest of the order? Yes. Pool shells are produced on the same plan as the furniture and building materials in the package, and consolidated loading is arranged through our logistics and door-to-door delivery service.
What should we send to get a real quotation? Site photos or the terrace plan, the access route from the street, the intended setting (above deck or recessed), the option list you want — heating, sanitation, steps, insulation — and the target installation window.
Send us the pool terrace drawing and we will price Outdoor Swim Spa WS-PC08ST inside your full package — shell, shading, seating and finishes on one production plan and one delivery schedule. Enquiries: santerson@qq.com / WhatsApp +86 139 2821 4007 (PHILLIP).