Genal  > 

AI - Page Sitemap

 > 

Genal wooden tv stands manufacturers

Genal wooden tv stands manufacturers

Genal wooden tv stands manufacturers

Trade Term
EXW / FOB shenzhen
MOQ
5 SETS
Payment Term
T/T, Ali trade assurance
Lead Time
30-35day after deposit received
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Company Advantages
1. All our wooden tv stands designs are original and unique. Genal furniture is able to quickly achieve customer's approval
2. This product is designed to fit into any space without taking up too much area. People could save their decoration costs through its space-saving design. Genal offers a powerful line, clear form for extravagant people
3. The product, bringing customers many economic benefits, is believed to be more widely used in the market. Genal home furniture's resistance to mechanical damage is remarkable
4. The product has survived the rigorous quality and durability testings. The reliability of Genal furniture is valued by the customers


Genal wooden tv stands manufacturers-1



   PRODUCT  & PARAMETERS
INDUSTRY


Genal wooden tv stands manufacturers-2
Genal wooden tv stands manufacturers-3


PARAMETERS

Product name

Retractable solid wood TV stand

Model no

CH 1701 TV stand

Frame material

Imported Zingana 

Color

Natural gold and black color

Feature

Retractable TV stand

Dimension

Max :  2700*440*460H (mm)
Min :  1780*440*460H (mm)

Max :  106*17.3*18.1H (mm)
Min :  70*17.3*18.1H (mm)

Loading qty

75 pcs / 20’GP , 180 pcs / 40’HQ

Packing details

Standard export carton box with wood frame packing



   PRODUCT  DESCRIPTION
INDUSTRY


Genal wooden tv stands manufacturers-4



Product features


- Natural unique Ebony wood texture, shining gold and black mixed natural color.  
- Simple and elegant design,
- Retractable design, can change the length flexibly
- Strong wood frame structure





   PRODUCT  DETAILS
INDUSTRY


Genal wooden tv stands manufacturers-5
Ebony material
Glossy, straight texture, fine and uniform structure; hard wood, high strength
Genal wooden tv stands manufacturers-6
Design

Multi-capacity large drawer storage space design, multiple storage space, convenient to classify daily debris;

Scalable design, the length can be adjustable during daily use.

Genal wooden tv stands manufacturers-7
AkzoNobel painting

AkzoNobel painting is green painting, the advantage is that no poison, no pollution, no waste. Better protect your family member's health.

Genal wooden tv stands manufacturers-8
Color difference

Solid wood is spiritual, hierarchical, if the people look from different angle, it will show different visual aesthetics;

Due to the different light sources, the lamplight or the sunlight will affect the color of the wood;

Due to the wood's natural nature, after reprocessing, drying and polishing, the inconsistency of water absorption capacity will cause chromatic aberration

   PACKING  & SERVICES
INDUSTRY


Genal wooden tv stands manufacturers-9


Genal wooden tv stands manufacturers-10
After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Genal wooden tv stands manufacturers-11
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Genal wooden tv stands manufacturers-12
Personalized
Provide personalized service for customers according to the needs of different customers.
Genal wooden tv stands manufacturers-13
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.





Company Features
1. Genal Furinture Industry Co.,Limited aims to supply high quality wooden tv stands . We have become a professional manufacturer and are reputable in this industry.
2. Genal Furinture Industry Co.,Limited has always been committed to take the road of independent innovation in tv cabinet field.
3. Our goal is to provide the first-class service, and our pursuit is to create the world's first tv table stand brand. Ask!
Product Message
Contact