Genal  > 

AI - Page Sitemap

 > 

Genal Wholesale italian bed for business

Genal Wholesale italian bed for business

Genal Wholesale italian bed for business

Trade Term
EXW / FOB shenzhen
MOQ
5 SETS
Payment Term
T/T, Ali trade assurance
Lead Time
30-35day after deposit received
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product Comparison
modern living room furniture is a truly cost-effective product. It is processed in strict accordance with relevant industry standards and is up to the national quality control standards. The quality is guaranteed and the price is really favorable.After being improved greatly, Genal 's modern living room furniture is more advantageous in the following aspects.
Company Advantages
1. As for italian bed produced by Genal Furinture Industry Co.,Limited, it's more a matter of practicality than design.
2. Translucence is its most significant feature. The product has a white and translucent surface after firing, allowing light to show through it.
3. The product is stronger than the traditional one. The raw materials used in it, that are multiaxial fibers, are far more strong than those chopped strand mat and roving.
4. The style of this product caters to the needs of people's particular style and senses. It can contribute to setting up people's place that is required to be comfortable.


Genal Wholesale italian bed for business-1



   PRODUCT  & PARAMETERS
INDUSTRY


Genal Wholesale italian bed for business-2
Genal Wholesale italian bed for business-3


PARAMETERS

Product name

Solid wood bed frame

Model no

CH 1701 bed frame

Frame material

Imported Zingana 

Headboard Material

Top grain cow leather + high resilience sponge

Slat material

Imported Finland pine wood

Color

Natural gold and black color

Feature

Eco-friendly Akzo nobel paint,

Dimension

2010*2150*1130H (mm)

79.1*84.6*44.5 inch

Loading qty

35 sets / 20’GP , 85 sets / 40’HQ

Packing details

Standard export carton box with wood frame packing



   PRODUCT  DESCRIPTION
INDUSTRY


Genal Wholesale italian bed for business-4



Product features


- Natural unique Ebony wood texture, shining gold and black mixed color
- Elegant bed design with simple lines
- Upholstered headboard with high quality top grain cow leather, comfortable touching
- Strong bed frame structure, can bear heavy weight. With full pine wood slat base.





   PRODUCT  DETAILS
INDUSTRY


Genal Wholesale italian bed for business-5
Material
Glossy, straight texture, fine and uniform structure; hard wood, high strength; high quality top grain cow leather, durable,smooth feeling.
Genal Wholesale italian bed for business-6
Design
Simple line design, no complicated, more suitable for people who want simple life.
Genal Wholesale italian bed for business-7
AkzoNobel painting

AkzoNobel painting is green painting, the advantage is that no poison, no pollution, no waste. Better protect your family member's health. 

Genal Wholesale italian bed for business-8
Color difference
  • Solid wood is spiritual, hierarchical, if the people look from different angle, it will show different visual aesthetics;

  • Due to the different light sources, the lamplight or the sunlight will affect the color of the wood.;

  • Due to the wood's natural nature, after reprocessing, drying and polishing, the inconsistency of water absorption capacity will cause chromatic aberration.

   PACKING  & SERVICES
INDUSTRY


Genal Wholesale italian bed for business-9


Genal Wholesale italian bed for business-10
After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Genal Wholesale italian bed for business-11
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Genal Wholesale italian bed for business-12
Personalized
Provide personalized service for customers according to the needs of different customers.
Genal Wholesale italian bed for business-13
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.





Company Features
1. Genal Furinture Industry Co.,Limited is China's largest modern italian bed production base.
2. Genal is a company that focuses on the quality of fabric beds .
3. Genal Furinture Industry Co.,Limited makes every effort to improve the quality of leather platform bed with high quality services. Ask! Genal Furinture Industry Co.,Limited aims to bring the best leather king size bed with professional service. Ask!
Product Message
Contact