Genal  > 

AI - Page Sitemap

 > 

Genal tv table stand company

Genal tv table stand company

Genal tv table stand company

Trade Term
EXW / FOB shenzhen
MOQ
5 SETS
Payment Term
T/T, Ali trade assurance
Lead Time
30-35day after deposit received
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product Details
To better learn about modernbedroomfurniture, Genal will provide detailed pictures and detailed information in the following section for your reference.modernbedroomfurniture, manufactured based on high-quality materials and advanced technology, has reasonable structure, excellent performance, stable quality, and long-lasting durability. It is a reliable product which is widely recognized in the market.
Company Advantages
1. Body frame optimum design and advanced technology application can be seen from our tv table stand .
2. The product is energy saving. Adopting energy-saving technology, it only spends the minimum amount of energy to complete its tasks.
3. This product is able to produce super quality water and has long longevity, providing optimal operational costs for our customers.
4. People who have used this product said that it has a good cooling effect, which greatly improves the efficiency of their business.


Genal tv table stand company-1



   PRODUCT  & PARAMETERS
INDUSTRY


Genal tv table stand company-2
Genal tv table stand company-3


PARAMETERS

Product name

Retractable solid wood TV stand

Model no

CH 1701 TV stand

Frame material

Imported Zingana 

Color

Natural gold and black color

Feature

Retractable TV stand

Dimension

Max :  2700*440*460H (mm)
Min :  1780*440*460H (mm)

Max :  106*17.3*18.1H (mm)
Min :  70*17.3*18.1H (mm)

Loading qty

75 pcs / 20’GP , 180 pcs / 40’HQ

Packing details

Standard export carton box with wood frame packing



   PRODUCT  DESCRIPTION
INDUSTRY


Genal tv table stand company-4



Product features


- Natural unique Ebony wood texture, shining gold and black mixed natural color.  
- Simple and elegant design,
- Retractable design, can change the length flexibly
- Strong wood frame structure





   PRODUCT  DETAILS
INDUSTRY


Genal tv table stand company-5
Ebony material
Glossy, straight texture, fine and uniform structure; hard wood, high strength
Genal tv table stand company-6
Design

Multi-capacity large drawer storage space design, multiple storage space, convenient to classify daily debris;

Scalable design, the length can be adjustable during daily use.

Genal tv table stand company-7
AkzoNobel painting

AkzoNobel painting is green painting, the advantage is that no poison, no pollution, no waste. Better protect your family member's health.

Genal tv table stand company-8
Color difference

Solid wood is spiritual, hierarchical, if the people look from different angle, it will show different visual aesthetics;

Due to the different light sources, the lamplight or the sunlight will affect the color of the wood;

Due to the wood's natural nature, after reprocessing, drying and polishing, the inconsistency of water absorption capacity will cause chromatic aberration

   PACKING  & SERVICES
INDUSTRY


Genal tv table stand company-9


Genal tv table stand company-10
After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Genal tv table stand company-11
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Genal tv table stand company-12
Personalized
Provide personalized service for customers according to the needs of different customers.
Genal tv table stand company-13
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.





Company Features
1. Genal Furinture Industry Co.,Limited’s products can be widely used in many fields, such as solid wood tv stand .
2. With the tv unit furniture technology, tv table stand produced by Genal is ahead of this industry.
3. Genal Furinture Industry Co.,Limited will continuously improve its wooden tv cabinet after sales service system. Get quote! modern tv stand has long been a tenet of Genal Furinture Industry Co.,Limited. Get quote!
Product Message
Contact