Genal  > 

AI - Page Sitemap

 > 

Genal Top buy king size bed factory

Genal Top buy king size bed factory

Genal Top buy king size bed factory

Trade Term
EXW, FOB, CIF, CNF
MOQ
1 Set
Payment Term
T/T, L/C, D/P, Ali Trade Assurance
Lead Time
30-35 days after receive deposit
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Enterprise Strength
  • While selling products, Genal also provides corresponding after-sales services for consumers to solve their worries.
Company Advantages
1. The high performance of buy king size bed is primarily due to its italian leather bed design.
2. This product is free of any toxic substances. During production, any harmful chemical substances that would be residual on the surface have been totally removed.
3. The product is built to last. It adopts ultraviolet cured urethane finishing, which makes it resistant to damage from abrasion and chemical exposure, as well as to the effects of temperature and humidity changes.
4. The product has received much attention since its launch and is believed to be more successful in the future market.
5. The product has a variety of excellent properties and is increasingly used in various fields.


Genal Top buy king size bed factory-1



   PRODUCT  & PARAMETERS
INDUSTRY


Genal Top buy king size bed factory-2
Genal Top buy king size bed factory-3


PARAMETERS

Product Name:

Restlay Bedroom Furniture Light Luxury Bed 1807

Style:

Modern Light Luxury Style

Item Number:

Bed: 1807
Bed End Stool: C306

Brand:

Restlay

Application:

Bedroom Furniture

Material:

Leather, Wooden, Sponge

Color:

Gray

Size:

Bed: 1500*1900 MM / 1800*2000 MM 

Bed End Stool: 1570*1570*370 MM

MOQ:

1 Set

Packing:

Standard Export Package



   PRODUCT  DETAILS
INDUSTRY


Genal Top buy king size bed factory-4
Double arc bedside design
Curved curves add a touch of beauty to the bed.
Genal Top buy king size bed factory-5
Vintage leather
Vintage leather, the texture is delicate and natural, the longer the use time, the higher the leather brightness.
Genal Top buy king size bed factory-6

Backrest 

The soft lines outline the atmosphere, and the leather surface is clear and delicate, adding to the taste of the owner's life.

Genal Top buy king size bed factory-7

Ottoman

The texture of pine concentrate, delicate lines, soft and soft.

   PACKING  & SERVICES
INDUSTRY


Genal Top buy king size bed factory-8


Genal Top buy king size bed factory-9
After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Genal Top buy king size bed factory-10
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Genal Top buy king size bed factory-11
Personalized
Provide personalized service for customers according to the needs of different customers.
Genal Top buy king size bed factory-12
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.





Company Features
1. With the positioning of high-end buy king size bed brand, Genal win wide reputation in the world.
2. Our factory has a full range of production facilities to support manufacturing tasks. These facilities have been built in with high-end technology, which ultimately improves and guarantees the overall product quality.
3. The path of exploring the development guides Genal to make more achievements. Contact us! Excellence in quality and service is the long-term pursuit of Genal. Contact us!
Product Message
Contact