Genal  > 

AI - Page Sitemap

 > 

Genal sofa set for sale Supply

Genal sofa set for sale Supply

Genal sofa set for sale Supply

Trade Term
EXW / FOB shenzhen
MOQ
5 SETS
Payment Term
T/T, Ali trade assurance
Lead Time
30-35day after deposit received
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Enterprise Strength
  • Genal always focuses on customers' needs and strives to meet their needs over the years. We are committed to providing comprehensive and professional services.
Company Advantages
1. Genal american sofa has a special design and appearance.
2. This product is durable and lasts a long time. Its strong frame will not easily lose its original shape and is not susceptible to twisting or bowing.
3. The product has desired safety. It does not contain any sharp or easily removeable parts that may cause accidental injury.
4. After years of continuous development, the products have been supported and trusted by customers, and have been widely used in the market.


Genal sofa set for sale Supply-1



   PRODUCT  & PARAMETERS
INDUSTRY


Genal sofa set for sale Supply-2
Genal sofa set for sale Supply-3


PARAMETERS

Product name

American style antique sofa sets/ solid wood frame sofa sets

Model no

CH 301

Frame material

Imported red beech

Material

Top grain cow leather with fabric, high density sponge

Color

Light burl walnut

Feature

Eco-friendly Akzo nobel paint,

Dimension

1 seat : 950*950*990H (mm)

37.4*37.4*39 inch

2 seat : 1650*950*1030H (mm)

65*37.4*40.5 inch

3 seat : 2010*950*1030H (mm)

79*37.4*40.5 inch

Loading qty

5 sets / 20’GP , 14 sets / 40’HQ

Packing details

Standard export carton box with wood frame packing



   PRODUCT  DESCRIPTION
INDUSTRY


Genal sofa set for sale Supply-4



Product features


- Imported top grain cow leather
- High density cotton and linen jacquard fabric
-Imported red beech solid wood
- Pure hand made gold foil/leaf
- 3D carved pattern

- High density resilience sponge





   PRODUCT  DETAILS
INDUSTRY


Genal sofa set for sale Supply-5
material
Back side use good flexibility artificial glossy leather, seating covered by smooth cotton & linen fabric.
Genal sofa set for sale Supply-6
 wood frame
Imported red beech solid wood, rare, precious,  with good impact resistance
Genal sofa set for sale Supply-7
leg

3D carved pattern, pure hand made gold foil/leaf. 

Genal sofa set for sale Supply-8
AkzoNobel painting
AkzoNobel painting is green painting, the advantage is that no poison, no pollution, no waste. Better protect your family member's health
   PACKING  & SERVICES
INDUSTRY


Genal sofa set for sale Supply-9


Genal sofa set for sale Supply-10
After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Genal sofa set for sale Supply-11
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Genal sofa set for sale Supply-12
Personalized
Provide personalized service for customers according to the needs of different customers.
Genal sofa set for sale Supply-13
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.





Company Features
1. With the emergence and broad development prospect of sofa set for sale , Genal Furinture Industry Co.,Limited has becomes more and more popular.
2. In order to meet the needs of more customers, Genal has always focused on technological innovation.
3. Genal Sincerely hope to establish high-quality long-term cooperation relationship with all customers. Check it! Client-oriented was the focus throughout the evolution of Genal brand. Check it!
Product Message
Contact