Genal  > 

AI - Page Sitemap

 > 

Genal modern bedside tables manufacturers

Genal modern bedside tables manufacturers

Genal modern bedside tables manufacturers

Trade Term
EXW, FOB, CIF, CNF
MOQ
1 Set
Payment Term
T/T, L/C, D/P, Ali Trade Assurance
Lead Time
30-35 days after receive deposit
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Company Advantages
1. modern bedside tables adopts night table without harmless materials. Each piece from Genal Furniture is durable and practical
2. Being a versatile design element that can serve decorative and functional purposes, this product is one of the most popular elements in modern mid- and high-rise design. Genal mattresses have individual springs of different thickness for a better orthopedic effect
3. This product can be placed in convenience stores, restaurants, grocery stores, retailers, schools and any other location to educate or convince the consumer. Genal furniture is characterized by comfort, beauty, practicality and more


Genal modern bedside tables manufacturers-1



   PRODUCT  & PARAMETERS
INDUSTRY


Genal modern bedside tables manufacturers-2
Genal modern bedside tables manufacturers-3


PARAMETERS

Product Name:

Restlay Bedroom Furniture Light Luxury Night Table C301

Style:

Modern Light Luxury Style

Item Number:

C301

Brand:

Restlay

Application:

Bedroom Furniture

Material:

Leather, Wooden, Sponge, Iron

Color:

Gray, Brown

Size:

500*450*450 MM

MOQ:

1 Set

Packing:

Standard Export Package



   PRODUCT  DETAILS
INDUSTRY


Genal modern bedside tables manufacturers-4

Night table

The soft lines outline the atmosphere, and the leather surface is clear and delicate, adding to the taste of the owner's life. 

Genal modern bedside tables manufacturers-5
The color is warm and elegant, comfortable and dry, and the clean and bright living room atmosphere is the ideal for modern urbanites.
Genal modern bedside tables manufacturers-6
High-quality semi-automatic metal rails for smooth pull and no noise.
   PACKING  & SERVICES
INDUSTRY


Genal modern bedside tables manufacturers-7


Genal modern bedside tables manufacturers-8
After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Genal modern bedside tables manufacturers-9
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Genal modern bedside tables manufacturers-10
Personalized
Provide personalized service for customers according to the needs of different customers.
Genal modern bedside tables manufacturers-11
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.





Company Features
1. Genal Furinture Industry Co.,Limited is one of the leading manufacturers of night table in China. We have the required experience and expertise.
2. Our manufacturing team is the core of our business. They can address quality, cost and delivery issues by improving manufacturing methods to reduce lead times and increase flexibility.
3. Genal Furinture Industry Co.,Limited hopes to become a leading company providing quality services to customers. Inquire!
Got this for my son and girl when they got first apartment. They really like it!
Whether you are new to cooking or have years experience an America's Test Kitchen cookbook is always a welcome addition. The recipes are easy to follow. This would be a great gift to a newlywed couple, newly empty nest couple or even singles looking to impress with home cook meals.
Great purchase!
What a great cookbook! America's Test Kitchen never lets me down.
Very well laid out. Pictures are very useful, completely understandable. Great recipes!!!
Use it every week, love it
Good Variety of recipes and easy to follow.
This book rocks my world. I have always been a fan of Cooks Country and this book follows many of the "why this works" principles. I have often made too much food in my love of cooking, but this cookbook has helped me with that, along with providing recipes for delightful food.
Top notch recipes and good reading.
Very good.
The recipes seem delicious and easy to make. However, the moment I opened the book the binding broke so not the greatest quality.
My daughter-in-law wanted a cookbook like this. She is very happy with this cookbook. She also said when you try to cut a recipe in half, recipe doesn't always work.
This is perfect for 2 but also works for 3 people. We love this book. I've book on kindle, Nook, and hard copy. It's thats good
Gift was well received!
Trying to downsize now that I'm not cooking for a crowd every day. This is a lovely book that is well made and written by experts.
This book is great. Finally a book that actually has recipes written and tested for two and not just recipes cut in half. I love the ideas given about buying a few smaller dishes. Having the right dish makes all the difference. I'm still trying out recipes, but so far so good!
We love anything ATK- anything I make is an instant hit and everyone I cook for thinks I'm a super pro in the kitchen with ATK. Love them!
I love this book. It is just what I needed for me and my husband. Food is very easy to prepare.
Great book, but unfortunately had to return it because someone else bought it for her also.
A good reference when I am wondering what to cook for myself.
This book is fantastic! It has helped us to only cook enough food for the two of us. After becoming "Empty Nesters", it was a difficult transition to cooking for only two. This book has been just wonderful!!
Good recipes, just not ones that we will use much.
Great way to scale back now that there are just the two of us. I LOVE anything America's Test Kitchen. A great addition to my ATK collection.
A great cook book !
Great book!! Has an enormous amount of recipes!
My daughter loves this cookbook! It arrived quickly! Nice size cookbook!
gift giving
Awesome cookbook with a lot of variety to it. Very simply to understand and a ton of great recipes! This is great for the newly married couple without kids that would rather use what they have at home and scale it down rather than going out and picking something up at a restaurant. This also makes a great gift for the favorite couple in your life!
Excellent book that brings some science into cooking. I am engineer so this fits my brain perfectly.
Anything from Americas Test Kitchen is amazing. Highly recommend this book.
My husband loves watching the reviews they do of kitchen products. So I know I had to buy this for him. He absolutely loves it. It has all these helpful hints about other things than just recipes.
Great cookbook for households with 2-3 people. Best recipe so far has been the Tomato Florentine Soup with Sausage and Tortellini. Excellent recipes that reduce the dreaded leftovers.
Perfect for a young couple just starting out.
Every recipe we've tried so far has been delicious!! Portions have been huge for two, but I love leftovers so it's not a problem for us. We usually have enough for me, my husband's huge appetite, and another meal for one later.
Love the recipes and perfect for two people.
Everyone should have this cookbook!
Gift for my sister, who loves it!
Like this very much; have used 4 weeks M-F so 20 new meals for us!
Best cookbook for couples who like to cook!
Great options for both meat eaters and vegetarians that are easy to prepare!
Great cookbook! The ribbon bookmark is a nice touch.
I've made a handful of these recipes since recently purchasing this cookbook and they have all turned out great. The portions are just right for two people who don't like eating too many leftovers.
I like America's Test Kitchen books, so when I saw one that was for two people, I was thrilled. I love it. I've made three recipes, and everything has been great. there are also shortcuts that I appreciated. They made it easier to cook for two as well as save money.
Wow! This cookbook rocks!
liked all the recipes I've tried so far
I loved this cookbook so much after buying it from America's Test Kitchen that I bought this one for my mom as a gift. My husband and I are childfree and only need to cook for the two of us. Every recipe I have made from this cookbook is amazing. The portions are mostly perfect - some recipes do make enough for leftovers, though (such as the lasagna recipe - those are HUGE portions). Once in a while, on dishes that are supposed to be spicy, I do have to up the amount of spices as the amounts called for aren't always quite spicy enough for me. ATK recipes tend to run slightly on the bland side when it comes to spicy dishes. So I just keep that in mind and add double or triple the amount of spice if needed. Highly recommend this cookbook! My favorite recipes are the lasagna, the pasta alla norma, the chicken vesuvio, and the chicken pot pies.
This is such a great cook book! Got this for a friend who moved into her first apartment and she loves the recipes and portion sizes. It is great for college students, even on a budget, and anyone who isn't feeding a family of four!
Great cookbook for the price! Color pictures of prepared food. Very nice cookbook. The recipient of this gift was very pleased.
Portions are perfect and now my wife doesn't get mad at all the wasted food I make. The Chicken Saltimbocca is amazing!
I bought 2 of these, one for me and one for my newly married granddaughter. It has so many great things in it besides the recipes. Even I, a senior citizen, learned some new things from this cookbook. An easier way to cut a pepper for instance.
Product Message
Contact