Genal  > 

AI - Page Sitemap

 > 

Genal living room cabinet Supply

Genal living room cabinet Supply

Genal living room cabinet Supply

Trade Term
EXW / FOB shenzhen
MOQ
5 SETS
Payment Term
T/T, Ali trade assurance
Lead Time
30-35day after deposit received
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Enterprise Strength
  • Genal has been highly recognized by customers and are well received in the industry for the quality products and professional services.
Company Advantages
1. living room cabinet adopts living room shelf unit materials, generate features such as living room bookshelf .
2. The product features flammability resistance. It has passed the fire resistance testing, which can ensure that it does not ignite and pose risk to lives and property.
3. Genal Furinture Industry Co.,Limited has gained outstanding reputation amongst the vast clients.
4. In Genal Furinture Industry Co.,Limited, All living room cabinet can all be customized to the unique needs of individual clients.


Genal living room cabinet Supply-1



   PRODUCT  & PARAMETERS
INDUSTRY


Genal living room cabinet Supply-2
Genal living room cabinet Supply-3


PARAMETERS

Product name

Display cabinet

Model no

CH 1701 cabinet

Frame material

Imported Zingana 

Color

Natural gold and black color

Feature

Eco-friendly Akzo nobel paint,

Over dimension (Vertical)

1000*360*2000H (mm)

39.4*14.2*78.7 inch

Over dimension (Horizontal)

2000*360*1000H (mm)

78.7*14.2*39.4 inch

Chest of 3 drawers

500*360*500H (mm)

19.7*14.2*19.7 inch

Chest of 6 drawers

500*360*1000H (mm)

19.7*14.2*39.4 inch

Two layers

500*360*1000H (mm)

19.7*14.2*39.4 inch

Four layers

500*360*1500H (mm)

19.7*14.2*59 inch

Loading qty

38 sets / 20’GP , 90 sets / 40’HQ

Packing details

Standard export carton box with wood frame packing



   PRODUCT  DESCRIPTION
INDUSTRY


Genal living room cabinet Supply-4



Product features


- Natural unique wood texture
- Simple and elegant design
- Freely combine, not fit on the wall
- Strong frame structure





   PRODUCT  DETAILS
INDUSTRY


Genal living room cabinet Supply-5
Ebony material
Glossy, straight texture, fine and uniform structure; hard wood, high strength.
Genal living room cabinet Supply-6
storage
Multi-capacity large drawer storage space design, multiple storage space, convenient to classify daily debris
Genal living room cabinet Supply-7
assembly

Freely combine, not fit on the wall, with flexible usage. 

   PACKING  & SERVICES
INDUSTRY


Genal living room cabinet Supply-8


Genal living room cabinet Supply-9
After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Genal living room cabinet Supply-10
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Genal living room cabinet Supply-11
Personalized
Provide personalized service for customers according to the needs of different customers.
Genal living room cabinet Supply-12
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.





Company Features
1. Genal Furinture Industry Co.,Limited is the largest and most powerful living room cabinet operation in the world.
2. After years of dedication to improving product quality, we have been selected as a business partner by many famous brands. This is strong proof of our ability in this field.
3. Genal has been abiding by the rules of national living room cabinet shelf manufacturer. Inquire online! Genal Furinture Industry Co.,Limited strives to provide customers with better service and support! Inquire online!
About payment

1. We accept T/T 100% in advance, irrevocable L/C at sight, west union, and other paying methods negotiable.

2. ETD 1-20 working days depends on dry box cabinet order quantity.

About our product

1. The camera dry cabinet and damp proof wardrobe bin body made of 0.8-1.2mm cold rolling steel plate.

2. The humidity control range from 25-55%RH.

3. Used for keeping camera, lens, memory card, telescope, violin, CD, antique, painting, book, stamp, medicine, tea, coffee, precious ingredient, dried food, leather, etc.

4. All cabinet has lights and damp proof wardrobe has sense lights.

5. The dehumidifying unit to prevent get damp 45 hrs when power off.
Product Message
Contact