Genal  > 

AI - Page Sitemap

 > 

Genal living room cabinet shelf Supply

Genal living room cabinet shelf Supply

Genal living room cabinet shelf Supply

Trade Term
EXW / FOB shenzhen
MOQ
5 SETS
Payment Term
T/T, Ali trade assurance
Lead Time
30-35day after deposit received
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Company Advantages
1. The production of Genal living room bookshelf adopts the highest standards in the industry. Genal furniture is characterized by elegance and innovation
2. Genal Furinture Industry Co.,Limited has broad supply channels. Genal home furniture's resistance to mechanical damage is remarkable
3. Skillful employees and a range of equipment guarantee the product quality. Genal home furniture is available in a variety of sizes, shapes, and colors pleasing
4. This product is ensured with optimum quality and durability. Each piece from Genal Furniture is durable and practical
5. living room cabinet shelf is well equipped with excellent properties such as living room bookshelf . Genal mattresses have individual springs of different thickness for a better orthopedic effect


Genal living room cabinet shelf Supply-1



   PRODUCT  & PARAMETERS
INDUSTRY


Genal living room cabinet shelf Supply-2
Genal living room cabinet shelf Supply-3


PARAMETERS

Product name

Display cabinet

Model no

CH 1701 cabinet

Frame material

Imported Zingana 

Color

Natural gold and black color

Feature

Eco-friendly Akzo nobel paint,

Over dimension (Vertical)

1000*360*2000H (mm)

39.4*14.2*78.7 inch

Over dimension (Horizontal)

2000*360*1000H (mm)

78.7*14.2*39.4 inch

Chest of 3 drawers

500*360*500H (mm)

19.7*14.2*19.7 inch

Chest of 6 drawers

500*360*1000H (mm)

19.7*14.2*39.4 inch

Two layers

500*360*1000H (mm)

19.7*14.2*39.4 inch

Four layers

500*360*1500H (mm)

19.7*14.2*59 inch

Loading qty

38 sets / 20’GP , 90 sets / 40’HQ

Packing details

Standard export carton box with wood frame packing



   PRODUCT  DESCRIPTION
INDUSTRY


Genal living room cabinet shelf Supply-4



Product features


- Natural unique wood texture
- Simple and elegant design
- Freely combine, not fit on the wall
- Strong frame structure





   PRODUCT  DETAILS
INDUSTRY


Genal living room cabinet shelf Supply-5
Ebony material
Glossy, straight texture, fine and uniform structure; hard wood, high strength.
Genal living room cabinet shelf Supply-6
storage
Multi-capacity large drawer storage space design, multiple storage space, convenient to classify daily debris
Genal living room cabinet shelf Supply-7
assembly

Freely combine, not fit on the wall, with flexible usage. 

   PACKING  & SERVICES
INDUSTRY


Genal living room cabinet shelf Supply-8


Genal living room cabinet shelf Supply-9
After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Genal living room cabinet shelf Supply-10
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Genal living room cabinet shelf Supply-11
Personalized
Provide personalized service for customers according to the needs of different customers.
Genal living room cabinet shelf Supply-12
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.





Company Features
1. High-quality living room cabinet shelf is one of the reason that makes Genal prosperous.
2. The production machines in Genal Furinture Industry Co.,Limited are advanced.
3. With the growing growth of living room cabinet industry, living room bookshelf plays an important role in the development of Genal. Inquiry!
Product Message
Contact