Genal  > 

AI - Page Sitemap

 > 

Genal leather beds for business

Genal leather beds for business

Genal leather beds for business

Trade Term
EXW / FOB shenzhen
MOQ
5 SETS
Payment Term
T/T, Ali trade assurance
Lead Time
30-35day after deposit received
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Company Advantages
1. The necessary tests for Genal leather beds have been conducted. It has been tested with regard to formaldehyde content, lead content, structural stability, static loading, colors, and texture. Genal offers a powerful line, clear form for extravagant people
2. By offering reliable installation service, Genal has gained more trustworthy clients. The production of Genal furniture applies the most modern technology
3. The product has a sanitary property. The molds and bacteria are not easy to build up on the surface of it. Genal home furniture is available in a variety of sizes, shapes, and colors pleasing
4. The product is not prone to high temperatures. The wood materials are able to expand and contract to prevent cracking and warping as the sauna heats up. The creation of Genal furniture is almost an art
5. The product is capable of saving tons of paper because it is reusable for thousands of times, which helps protect the environment. Genal presents a series of functional and aesthetic bases for beds


Genal leather beds for business-1



   PRODUCT  & PARAMETERS
INDUSTRY


Genal leather beds for business-2
Genal leather beds for business-3


PARAMETERS

Product name

Luxury leather bed frame

Model no

CH 302

Frame material

Imported red beech

Material

Cotton and linen jacquard fabric, high density sponge

Color

Gold paint

Feature

Eco-friendly Akzo nobel paint,

Dimension

2150*1980*1500H (mm)

84.6*77.9*59 inch

Loading qty

38 sets / 20’GP , 91 sets / 40’HQ

Packing details

Standard export carton box with wood frame packing



   PRODUCT  DESCRIPTION
INDUSTRY


Genal leather beds for business-4



Product features


- Elegant cambered wood frame
- High quality glossy top grain cow leather
- Imported red beech solid wood
- High density resilience sponge
- Hand made bronze nail stripe





   PRODUCT  DETAILS
INDUSTRY


Genal leather beds for business-5
leather
Glossy, high quality top grain cow leather, feeling comfortable.
Genal leather beds for business-6
Wood frame
Imported red beech solid wood, rare, precious,  with good impact resistance.
Genal leather beds for business-7
headboard pattern

3D carved pattern, pure hand made gold foil/leaf. 

Genal leather beds for business-8
Slat
strong pine wood slat, loading capacity 300kg.
   PACKING  & SERVICES
INDUSTRY


Genal leather beds for business-9


Genal leather beds for business-10
After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Genal leather beds for business-11
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Genal leather beds for business-12
Personalized
Provide personalized service for customers according to the needs of different customers.
Genal leather beds for business-13
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.





Company Features
1. Leveraging the wealth of experience and expertise, Genal Furinture Industry Co.,Limited provides the manufacturing strength required to create the finest leather beds in the world. The entire production of buy double bed meets up with faux leather single bed and safety standard.
2. Genal Furinture Industry Co.,Limited has a technical laboratory and a total warehouse.
3. The advanced technology leads to stable quality of leather king size bed . Genal Furinture Industry Co.,Limited render leather king bed as its eternal tenet. Check it!
Product Message
Contact