Genal  > 

AI - Page Sitemap

 > 

Genal Latest leather sofa set factory

Genal Latest leather sofa set factory

Genal Latest leather sofa set factory

Trade Term
EXW / FOB shenzhen
MOQ
5 SETS
Payment Term
T/T, Ali trade assurance
Lead Time
30-35day after deposit received
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Application Scope
modernbedroomfurniture can be applied to different industries, fields and scenes.Genal insists on providing customers with one-stop and complete solution from the customer's perspective.
Company Advantages
1. Genal cheap sofas for sale is designed in a professional manner. The contour, proportions and decorative details are considered by both furniture designers and draftsmen who are both experts in this field.
2. This product can last for decades. Its joints combine the use of joinery, glue, and screws, which are tightly combined with each other.
3. This product can maintain a hygienic surface. The material used does not easily harbor bacteria, germs, and other harmful microorganisms such as mold.
4. It can eliminate the chemicals which may affect people's health and makes the pool water healthier and cleaner for swimming.
5. Residences, offices, supermarkets, or hotels are normally full of appliances that need lots of energy, however, using this product definitely helps cut electricity costs.


Genal Latest leather sofa set factory-1



   PRODUCT  & PARAMETERS
INDUSTRY


Genal Latest leather sofa set factory-2
Genal Latest leather sofa set factory-3


PARAMETERS

Product name

Luxury fabric armchair

Model no

CH 313

Frame material

Imported red beech

Material

Cotton and linen jacquard fabric, high density sponge

Color

Light Burl Walnut with gold paint

Feature

Eco-friendly Akzo nobel paint,

Dimension

750*810*1150H (mm)

29.5*31.9*45.3 inch

Loading qty

38 sets / 20’GP , 91 sets / 40’HQ

Packing details

Standard export carton box with wood frame packing



   PRODUCT  DESCRIPTION
INDUSTRY


Genal Latest leather sofa set factory-4



Product features


- Elegant cambered wood frame
- High density cotton and linen jacquard fabric
-Imported red beech solid wood
- High density resilience sponge
- Hand made bronze nail stripe





   PRODUCT  DETAILS
INDUSTRY


Genal Latest leather sofa set factory-5
fabric
good quality cotton & linen fabric, smooth surface
Genal Latest leather sofa set factory-6
wood frame
Imported red beech solid wood, rare, precious,  with good impact resistance
Genal Latest leather sofa set factory-7
leg

3D carved pattern, pure hand made gold foil/leaf 

Genal Latest leather sofa set factory-8
armrest design
vortex armrest design, complex craftsmanship, full of luxury
   PACKING  & SERVICES
INDUSTRY


Genal Latest leather sofa set factory-9


Genal Latest leather sofa set factory-10
After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Genal Latest leather sofa set factory-11
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Genal Latest leather sofa set factory-12
Personalized
Provide personalized service for customers according to the needs of different customers.
Genal Latest leather sofa set factory-13
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.





Company Features
1. Genal Furinture Industry Co.,Limited has been dedicated to the leather sofa set field for many years and highly recognized.
2. Genal Furinture Industry Co.,Limited owns a professional dedicated technical team.
3. High quality is consistently set first in Genal Furinture Industry Co.,Limited. Get price! Genal responds to customers' needs in a timely manner and continues to create increased values for customers. Get price! Genal Furinture Industry Co.,Limited strives to function as domestic and global production and R &D foundation of italian leather sofa. Get price!
Products Show

 

Product Description

 

 

 

Item NameMassage Recliner
G.W 45KGS
Volume(CBM) 0.48
MaterialBonded leather  + Full PU  or Full PU or fabric
PackingCarton
Colors OptionsBLACK/BROWN/CREAM/RED
Product Sepc.Manual recliner /electric powered massage
Delivery timeThe delivery time is 20 days after receiving the deposit
Port of shipmentShanghai/Ningbo
OEM/ODMAvailable
PaymentT/T
Terms of ShipmentFOB

 

Product Message
Contact