Genal  > 

AI - Page Sitemap

 > 

Genal italian bed Supply

Genal italian bed Supply

Genal italian bed Supply

Trade Term
EXW, FOB, CIF, CNF
MOQ
1 Set
Payment Term
T/T, L/C, D/P, Ali Trade Assurance
Lead Time
30-35 days after receive deposit
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Company Advantages
1. The manufacture of Genal italian bed complies with regulatory requirements. It mainly meets the requirements of many standards such as EN1728& EN22520 for domestic furniture. Each piece from Genal Furniture is durable and practical
2. The product has always found use in various different fields. Genal home furniture is available in a variety of sizes, shapes, and colors pleasing
3. Detailed inspection is implemented to ensure quality before mass manufacturing. Genal presents a series of functional and aesthetic bases for beds
4. The product is quality assured, meeting with the rigorous international quality standards. Genal home furniture's resistance to mechanical damage is remarkable


Genal italian bed Supply-1



   PRODUCT  & PARAMETERS
INDUSTRY


Genal italian bed Supply-2
Genal italian bed Supply-3


PARAMETERS

Product Name:

Restlay Bedroom Furniture Light Luxury Bed 1807

Style:

Modern Light Luxury Style

Item Number:

Bed: 1802A
Night Table: C801

Brand:

Restlay

Application:

Bedroom Furniture

Material:

Leather, Wooden, Sponge

Color:

Brown

Size:

Bed: 1500*1900 MM / 1800*2000 MM
Night Table:530*410*500 MM

MOQ:

1 Set

Packing:

Standard Export Package



   PRODUCT  DETAILS
INDUSTRY


Genal italian bed Supply-4
PU leather wrapped corner
A leather wrap at the bedside prevents bumps.
Genal italian bed Supply-5

Night table 

The bedside table uses a circular inner button drawer, and the cabinet is three-dimensionally neat and more beautiful.

Genal italian bed Supply-6

Backrest

The leather is tight, wear resistant, breathable and easy to maintain.

Genal italian bed Supply-7
Fully relying on the bag
The bedside bag is filled with doll cotton, which fits the curve of the back of the human body and relies on comfort.
   PACKING  & SERVICES
INDUSTRY


Genal italian bed Supply-8


Genal italian bed Supply-9
After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Genal italian bed Supply-10
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Genal italian bed Supply-11
Personalized
Provide personalized service for customers according to the needs of different customers.
Genal italian bed Supply-12
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.





Company Features
1. As one of largest italian bed manufacturer, Genal Furinture Industry Co.,Limited is regarded as the most reliable enterprise. We have a high-performance designers team. They have a strong team spirit and work in pleasuring working atmosphere, which enables them to closely cooperate to create more distinctive and valued products.
2. The factory has an independent quality control department. This department is equipped with product data testing center. Products, including materials and parts, have to go through the quality analysis and testing in this center for upgrade and optimization.
3. Our design team is comprised of proficient and knowledgeable talents. They have specialized skills in computer-aided design and allows us to provide the most attractive design for our customers. Our mission is to provide our clients and employees the means to reach their maximum potential. We do that by creating world-class manufacturing environments, building innovative teams, and by making a positive impact on the communities where we operate.
Product Message
Contact