Genal  > 

AI - Page Sitemap

 > 

Genal furniture beds factory

Genal furniture beds factory

Genal furniture beds factory

Trade Term
EXW / FOB shenzhen
MOQ
5 SETS
Payment Term
T/T, Ali trade assurance
Lead Time
30-35day after deposit received
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product Details
Next, Genal will present you with the specific details of modern living room furniture.Genal is certified by various qualifications. We have advanced production technology and great production capability. modern living room furniture has many advantages such as reasonable structure, excellent performance, good quality, and affordable price.
Application Scope
Multiple in function and wide in application, modern living room furniture can be used in many industries and fields.Genal is committed to providing customers with high-quality dining furniture as well as one-stop, comprehensive and efficient solutions.
Company Advantages
1. The quality of Genal large bed is guaranteed by conducting a series of tests. These tests include color shading tests, symmetry check, buckle check, zipper tests.
2. The product features a good purifying effect. It can effectively remove bacteria, viruses, microorganisms, granules, heavy metals, etc.
3. The product does not absorb bathroom temperature. Because the shape and texture of this product are unaffected by temperature variations.
4. Genal Home Furniture has established strategic partnerships with many giants in furniture beds field.


Genal furniture beds factory-1



   PRODUCT  & PARAMETERS
INDUSTRY


Genal furniture beds factory-2
Genal furniture beds factory-3


PARAMETERS

Product name

Solid wood bed frame

Model no

CH 1701 bed frame

Frame material

Imported Zingana 

Headboard Material

Top grain cow leather + high resilience sponge

Slat material

Imported Finland pine wood

Color

Natural gold and black color

Feature

Eco-friendly Akzo nobel paint,

Dimension

2010*2150*1130H (mm)

79.1*84.6*44.5 inch

Loading qty

35 sets / 20’GP , 85 sets / 40’HQ

Packing details

Standard export carton box with wood frame packing



   PRODUCT  DESCRIPTION
INDUSTRY


Genal furniture beds factory-4



Product features


- Natural unique Ebony wood texture, shining gold and black mixed color
- Elegant bed design with simple lines
- Upholstered headboard with high quality top grain cow leather, comfortable touching
- Strong bed frame structure, can bear heavy weight. With full pine wood slat base.





   PRODUCT  DETAILS
INDUSTRY


Genal furniture beds factory-5
Material
Glossy, straight texture, fine and uniform structure; hard wood, high strength; high quality top grain cow leather, durable,smooth feeling.
Genal furniture beds factory-6
Design
Simple line design, no complicated, more suitable for people who want simple life.
Genal furniture beds factory-7
AkzoNobel painting

AkzoNobel painting is green painting, the advantage is that no poison, no pollution, no waste. Better protect your family member's health. 

Genal furniture beds factory-8
Color difference
  • Solid wood is spiritual, hierarchical, if the people look from different angle, it will show different visual aesthetics;

  • Due to the different light sources, the lamplight or the sunlight will affect the color of the wood.;

  • Due to the wood's natural nature, after reprocessing, drying and polishing, the inconsistency of water absorption capacity will cause chromatic aberration.

   PACKING  & SERVICES
INDUSTRY


Genal furniture beds factory-9


Genal furniture beds factory-10
After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Genal furniture beds factory-11
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Genal furniture beds factory-12
Personalized
Provide personalized service for customers according to the needs of different customers.
Genal furniture beds factory-13
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.





Company Features
1. The development of furniture beds in Genal Furinture Industry Co.,Limited takes the lead in the world.
2. Genal Furinture Industry Co.,Limited has strong scientific research and development capabilities.
3. Sustainability is one of our company's strategic business objectives. We have paid close attention to our energy consumption and have worked on the following specific projects: replacing lighting, identifying very large power consumers in our processes, etc. We insist on sustainable development. We are using our expertise to provide customers with sustainable solutions that are designed to improve the world in which we live and work. Inquiry! Our company strives for excellent customer service. We will continuously seek to improve each customer's experience by listening and striving to exceed our commitments. We have a key role to play in the industry shift towards sustainable development. We will lower our own carbon footprint and promise not to cause pollution to the environment.
Product Message
Contact