Genal  > 

AI - Page Sitemap

 > 

Genal fabric beds Suppliers

Genal fabric beds Suppliers

Genal fabric beds Suppliers

Trade Term
EXW, FOB, CIF, CNF
MOQ
1 Set
Payment Term
T/T, L/C, D/P, Ali Trade Assurance
Lead Time
30-35 days after receive deposit
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product Comparison
modern living room furniture, manufactured based on high-quality materials and advanced technology, has reasonable structure, excellent performance, stable quality, and long-lasting durability. It is a reliable product which is widely recognized in the market.Compared with similar products, Genal 's modern living room furniture has the following advantages.
Enterprise Strength
  • Genal provides competitive solutions and services based on customer demand,
Company Advantages
1. Genal large bed is subjected to different testing standards (electrical safety, temperature, shock, and vibration tests) in various environmental conditions (humidity, temperature, pressure).
2. The quality control procedure is very strict, ensuring the quality of the product.
3. This product is meant to be something practical that you have in a room thanks to its ease of use and comfort.
4. The product with ergonomics design provides an unparalleled level of comfort to people and it will help them keep motivated all day long.


Genal fabric beds Suppliers-1



   PRODUCT  & PARAMETERS
INDUSTRY


Genal fabric beds Suppliers-2
Genal fabric beds Suppliers-3


PARAMETERS

Product Name:

Restlay Bedroom Furniture Light Luxury Bed 1389

Style:

Modern Light Luxury Style

Item Number:

Bed: 1389
Night Table:C160

Brand:

Restlay

Application:

Bedroom Furniture

Material:

Leather, Wooden, Sponge

Color:

Cream White

Size:

Bed: 1500*1900 MM / 1800*2000 MM
Night Table:550*430*500 MM

MOQ:

1 Set

Packing:

Standard Export Package



   PRODUCT  DETAILS
INDUSTRY


Genal fabric beds Suppliers-4

It is necessary to rely on the bag to lean on the head, give the body full support and comfort in one step, and fill the high-elastic doll face inside, just like the back is comfortable with the big doll.
Genal fabric beds Suppliers-5
Bed display
The shape of the bed side is distinct, and the simple shape makes the whole more fashionable, and the materials are real, ensuring the quality of each place.
Genal fabric beds Suppliers-6
Recommended with bedside table

The table top gives the desk lamp and the things that are often used, and the things that are easy to accumulate dust but are often taken up are placed on the table top, and the unusable items such as books and spare paper towels are placed under the drawer. 

Genal fabric beds Suppliers-7
Comfortable round bed head
The comfortable arc is packed with a strong Nordic minimalist style.
   PACKING  & SERVICES
INDUSTRY


Genal fabric beds Suppliers-8


Genal fabric beds Suppliers-9
After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Genal fabric beds Suppliers-10
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Genal fabric beds Suppliers-11
Personalized
Provide personalized service for customers according to the needs of different customers.
Genal fabric beds Suppliers-12
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.






Company Features
1. Genal Furinture Industry Co.,Limited is a successful tech entrepreneur specialized in fabric beds .
2. Our factory is constantly invested in a series of production facilities. With these facilities, we are able to improve operational efficiency for our projects and improve productivity.
3. In answer to the increasing ecological problems, the company has worked out programs to protect the environment for our next generations. We fight against climate change by our practical actions in the production such as cutting waste pollution and sticking to the sustainable management of natural resources. Get quote! The business philosophy of our company is 'innovation in product, dedication to service.' Under this philosophy, the company develops steadily with growing influence in the industry. Get quote! Positive attitude and confidence is the goal we quest for. We encourage our employees to stay positive and show their vigorous energy and attitude no matter what problems they are facing. We believe this can improve the overall working efficiency. Get quote! Continued improvement of buy double bed will continue. Get quote!
Product Message
Contact