Genal  > 

AI - Page Sitemap

 > 

Genal fabric beds manufacturers

Genal fabric beds manufacturers

Genal fabric beds manufacturers

Trade Term
EXW, FOB, CIF, CNF
MOQ
1 Set
Payment Term
T/T, L/C, D/P, Ali Trade Assurance
Lead Time
30-35 days after receive deposit
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Enterprise Strength
  • Genal insists on the principle to be active, prompt, and thoughtful. We are dedicated to providing professional and efficient services for customers.
Company Advantages
1. Genal faux leather bed will be evaluated for different aspects. Its structural stability, durability, safety for people, chemical resistance, and dimension will be inspected under the corresponding testing equipment.
2. This product is able to retain its clean appearance. It doesn’t easily harbor dust mites, pet dander, or other allergens.
3. This product is designed to be safe. It has soft corners and edges to reduce injury in the event of a fall.
4. This product is compatible with various building styles, as well as optimizes the distribution and performance throughout the space.
5. Bacteria-causing health issues, such as skin allergies, sneezing, and coughing, are not likely to emerge if people use this product.


Genal fabric beds manufacturers-1



   PRODUCT  & PARAMETERS
INDUSTRY


Genal fabric beds manufacturers-2
Genal fabric beds manufacturers-3


PARAMETERS

Product Name:

Restlay Bedroom Furniture Light Luxury Bed 1747

Style:

Modern Light Luxury Style

Item Number:

Bed: 1747
Bed End Stool:C305

Brand:

Restlay

Application:

Bedroom Furniture

Material:

Leather, Wooden, Sponge

Color:

Brown

Size:

Bed: 1500*1900 MM / 1800*2000 MM
Bed End Stool: 1570*450*370 MM

MOQ:

1 Set

Packing:

Standard Export Package



   PRODUCT  DETAILS
INDUSTRY


Genal fabric beds manufacturers-4
Comfortable backrest
It is not easy to be tired for a long time. Compared with ordinary sponge cushions, the comfort is improved by 60%. It is not easy to collapse and it is not easy to be tired for a long time, giving you long-lasting comfort.
Genal fabric beds manufacturers-5
Streamline design
The bedside on both sides of the bed is designed with a streamlined body and a streamlined rhythm, embellishing the bedroom.
Genal fabric beds manufacturers-6
High bed feet, easy to clean

High-foot design, clean no dead ends.

Genal fabric beds manufacturers-7
Iron square tube, resistant to wear, high strength, not easy to deform.
   PACKING  & SERVICES
INDUSTRY


Genal fabric beds manufacturers-8


Genal fabric beds manufacturers-9
After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Genal fabric beds manufacturers-10
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Genal fabric beds manufacturers-11
Personalized
Provide personalized service for customers according to the needs of different customers.
Genal fabric beds manufacturers-12
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.





Company Features
1. Being superior in producing high quality fabric beds , Genal has become a star brand in the industry.
2. With advanced technology applied in leather platform bed , we take the lead in this industry.
3. With the business culture of "the pursuit of innovation, the inherit of quality", we aim to become of the strongest leader in this industry. We will learn from strong competitors, and introduce international advanced technology to help us achieve this goal. We aim to be an active and responsible leader committed to the sustainable development of global markets and promoting responsible practices in our industry. We operate ethically and lead with integrity, earning the trust of our employees, customers, suppliers, investors, and the communities where we live and work.
Product Message
Contact