Genal  > 

AI - Page Sitemap

 > 

Genal Best tv table stand Supply

Genal Best tv table stand Supply

Genal Best tv table stand Supply

Trade Term
EXW / FOB shenzhen
MOQ
5 SETS
Payment Term
T/T, Ali trade assurance
Lead Time
30-35day after deposit received
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product Details
With the pursuit of excellence, Genal is committed to showing you unique craftsmanship in details.dining furniture, manufactured based on high-quality materials and advanced technology, has reasonable structure, excellent performance, stable quality, and long-lasting durability. It is a reliable product which is widely recognized in the market.
Application Scope
The modern living room furniture produced by Genal is of high quality and is widely used in the Manufacturing Furniture Antique Furniture industry.Genal has many years of industrial experience and great production capability. We are able to provide customers with quality and efficient one-stop solutions according to different needs of customers.
Company Advantages
1. OEKO-TEX has tested Genal living room tv unit for more than 300 chemicals, and it was found to have harmful levels of none of them. This earned this product the STANDARD 100 certification.
2. This product is the customer's first choice product, the service life is long, the practicality is strong.
3. The product becomes increasingly popular because it's not only a piece of utility but also a way to represent people's life attitude.


Genal Best tv table stand Supply-1



   PRODUCT  & PARAMETERS
INDUSTRY


Genal Best tv table stand Supply-2
Genal Best tv table stand Supply-3


PARAMETERS

Product name

Retractable solid wood TV stand

Model no

CH 1701 TV stand

Frame material

Imported Zingana 

Color

Natural gold and black color

Feature

Retractable TV stand

Dimension

Max :  2700*440*460H (mm)
Min :  1780*440*460H (mm)

Max :  106*17.3*18.1H (mm)
Min :  70*17.3*18.1H (mm)

Loading qty

75 pcs / 20’GP , 180 pcs / 40’HQ

Packing details

Standard export carton box with wood frame packing



   PRODUCT  DESCRIPTION
INDUSTRY


Genal Best tv table stand Supply-4



Product features


- Natural unique Ebony wood texture, shining gold and black mixed natural color.  
- Simple and elegant design,
- Retractable design, can change the length flexibly
- Strong wood frame structure





   PRODUCT  DETAILS
INDUSTRY


Genal Best tv table stand Supply-5
Ebony material
Glossy, straight texture, fine and uniform structure; hard wood, high strength
Genal Best tv table stand Supply-6
Design

Multi-capacity large drawer storage space design, multiple storage space, convenient to classify daily debris;

Scalable design, the length can be adjustable during daily use.

Genal Best tv table stand Supply-7
AkzoNobel painting

AkzoNobel painting is green painting, the advantage is that no poison, no pollution, no waste. Better protect your family member's health.

Genal Best tv table stand Supply-8
Color difference

Solid wood is spiritual, hierarchical, if the people look from different angle, it will show different visual aesthetics;

Due to the different light sources, the lamplight or the sunlight will affect the color of the wood;

Due to the wood's natural nature, after reprocessing, drying and polishing, the inconsistency of water absorption capacity will cause chromatic aberration

   PACKING  & SERVICES
INDUSTRY


Genal Best tv table stand Supply-9


Genal Best tv table stand Supply-10
After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Genal Best tv table stand Supply-11
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Genal Best tv table stand Supply-12
Personalized
Provide personalized service for customers according to the needs of different customers.
Genal Best tv table stand Supply-13
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.





Company Features
1. Genal Furinture Industry Co.,Limited is professional supplier on tv table stand products.
2. Genal Furinture Industry Co.,Limited has independent products researching and developing ability.
3. We are aware of the importance of sustainability. We emphasize the use of renewable resources and the conservation of water in our factories. Providing innovative goods and services of the highest standards that surpasses customer expectations of quality, delivery, and productivity. We make our environmental programs be integrated into business operations to ensure sustainability. We take pollution prevention activities, namely, increasing energy utilization efficiency, utilizing environmentally benign resources, and reducing harmful chemical uses.
Product Message
Contact