Home  > PRODUCT  > Living Room Furniture  > Living room sofa  >  Carelli Modern Tufted Large Space Fabric Sectional Sofa Set, L shape Living sofa set(beige)
Carelli Modern Tufted Large Space Fabric Sectional Sofa Set, L shape Living sofa set(beige)

Carelli Modern Tufted Large Space Fabric Sectional Sofa Set, L shape Living sofa set(beige)

Trade Term
EXW, FOB, CIF, CNF
MOQ
1 Set
Payment Term
T/T, L/C, D/P, Ali Trade Assurance
Lead Time
30-35 days after receive deposit
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Captcha

Loading verification code...

Please complete verification first




   PRODUCT  & PARAMETERS
INDUSTRY



PARAMETERS

Product Name:

Carelli Living Room Furniture Fabric Sofa

Style:

Modern Light Luxury Style

Item Number:

Y02

Brand:

Carelli

Application:

Living Room Furniture

Material:

Fabric,Iron,Sponge

Color:

Orange

Size:

820*830*730 MM

MOQ:

1 Set

Packing:

Standard Export Package



   PRODUCT  DETAILS
INDUSTRY


Organic minimalism

Minimalist is not a simple white space, but a kind of wash-out, a higher level of creative realm. The seemingly simple exterior often has very rich and exquisite details.

Fabric material

In the sand fabric, cotton and linen materials are expensive, not only because he has natural energy, but also when it has a gentle contact with your skin, other materials are basically no substitute.

Down sponge

The sofa originated in Europe, and most of the home sofas in Europe and America are filled with down and high resilience sponges. Using a sponge cushion cushion is more flexible, and the down will keep your body surrounded by gentleness.

Armrest

Small armrest design, simple shape, create more space for the seat bag

   PACKING  & SERVICES
INDUSTRY



After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Personalized
Provide personalized service for customers according to the needs of different customers.
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.




Product Message

Loading verification code...

Please complete verification first

社媒暂无评论
Contact