Home  > PRODUCT  > Living Room Furniture  > Living room sofa  >  Carelli Italia Style Velvet Fabric Couch With Black Metal Leg
Carelli Italia Style Velvet Fabric Couch With Black Metal Leg

Carelli Italia Style Velvet Fabric Couch With Black Metal Leg

Trade Term
EXW, FOB, CIF, CNF
MOQ
1 Set
Payment Term
T/T, L/C, D/P, Ali Trade Assurance
Lead Time
30-35 days after receive deposit
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:




   PRODUCT  & PARAMETERS
INDUSTRY



PARAMETERS

Product Name:

Carelli Living Room Furniture Fabric Sofa

Style:

Modern Light Luxury Style

Item Number:

D815

Brand:

Carelli

Application:

Living Room Furniture

Material:

Fabric,Iron,Feather,Sponge

Color:

Grey

Size:

4 Set Sofa: 2450*1100*880 MM
Furniture Pedal: 990*1050*420 MM

MOQ:

1 Set

Packing:

Standard Export Package



   PRODUCT  DETAILS
INDUSTRY


Sitting bag
Unique design, double-layer sofa frame, high rebound seat bag, no collapse, good rebound, comfortable and soft.
Frame metal chassis

Special-shaped shaped tube, compared with single-diameter material, the bearing capacity will be stronger, the frame structure also has better support method, durable, high-foot design enhances the sense of space, and is simple and simple.

Precision stitching

Precision stitching, exquisite sewing process, meticulous workmanship, soft bag is more advantageous in the details processing.

Sofa leg 
Solid stainless steel feet, strong, bearing weight, stable as Taishan, with the support of the lower plate, can make the upper plate more comfortable.
   PACKING  & SERVICES
INDUSTRY



After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Personalized
Provide personalized service for customers according to the needs of different customers.
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.




Product Message
社媒暂无评论
Contact