Home  > PRODUCT  > Living Room Furniture  > Living room sofa  >  Carelli Italia Style 4-seater Long Size Sofa Glossy Cow Leather Living Room Set
Carelli Italia Style 4-seater Long Size Sofa Glossy Cow Leather Living Room Set

Carelli Italia Style 4-seater Long Size Sofa Glossy Cow Leather Living Room Set

Trade Term
EXW, FOB, CIF, CNF
MOQ
1 Set
Payment Term
T/T, L/C, D/P, Ali Trade Assurance
Lead Time
30-35 days after receive deposit
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Captcha

Loading verification code...

Please complete verification first




   PRODUCT  & PARAMETERS
INDUSTRY



PARAMETERS

Product Name:

Carelli Living Room Furniture Fabric Leather Sofa

Style:

Modern Light Luxury Style

Item Number:

D813

Brand:

Carelli

Application:

Living Room Furniture

Material:

Leather,Iron,Sponge

Color:

Black

Size:

2450*980*800 MM

MOQ:

1 Set

Packing:

Standard Export Package



   PRODUCT  DETAILS
INDUSTRY


Structure
Solid wood frame, excellent load-bearing, reasonable structure, stable and durable
Cotton and linen
Cotton and linen raw materials, firm and thick texture, breathable, natural breathable, moisture absorbing, refreshing, perspiration, natural air conditioning in life.
Comfortable backrest

Filled with medium and high density sponge, thick and full, good resilience, no need to feel tired after sitting for a long time.

Leisurely
The spacious and comfortable position, the large armrests, the humanized sitting design, lying down and feeling very comfortable.
   PACKING  & SERVICES
INDUSTRY



After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Personalized
Provide personalized service for customers according to the needs of different customers.
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.




Product Message

Loading verification code...

Please complete verification first

社媒暂无评论
Contact