Home  > PRODUCT  > Living Room Furniture  > Living room sofa  >  Carelli Furniture New Design 3 Seater Linen Fabric With Artificial Leather (grey/black)
Carelli Furniture New Design 3 Seater Linen Fabric With Artificial Leather (grey/black)

Carelli Furniture New Design 3 Seater Linen Fabric With Artificial Leather (grey/black)

Trade Term
EXW, FOB, CIF, CNF
MOQ
1 Set
Payment Term
T/T, L/C, D/P, Ali Trade Assurance
Lead Time
30-35 days after receive deposit
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Captcha

Loading verification code...

Please complete verification first




   PRODUCT  & PARAMETERS
INDUSTRY



PARAMETERS

Product Name:

Carelli Living Room Furniture Fabric Sofa

Style:

Modern Light Luxury Style

Item Number:

Y02

Brand:

Carelli

Application:

Living Room Furniture

Material:

Fabric,Iron,Sponge

Color:

Orange

Size:

820*830*730 MM

MOQ:

1 Set

Packing:

Standard Export Package



   PRODUCT  DETAILS
INDUSTRY


Perfect height

The sofa 40CM sits high, perfect height, so that the legs can be completely relaxed, the elderly, children are used.

360 degrees

No matter from which angle, front, side, or back, the sofa looks so good.

Sitting bag

Unique design, double-layer sofa frame, high rebound seat bag, no collapse, good rebound, comfortable and soft.

Sofa leg 

Solid stainless steel feet, strong, bearing weight, stable as Taishan, with the support of the lower plate, can make the upper plate more comfortable

   PACKING  & SERVICES
INDUSTRY



After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Personalized
Provide personalized service for customers according to the needs of different customers.
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.




Product Message

Loading verification code...

Please complete verification first

社媒暂无评论
Contact