Home  > PRODUCT  > Living Room Furniture  > Living room sofa  >  Carelli Brand Furniture Luxury 2-piece Sofa And Love Seat With Pink Jacquard Fabric/Gold Wood Frame
Carelli Brand Furniture Luxury 2-piece Sofa And Love Seat With Pink Jacquard Fabric/Gold Wood Frame

Carelli Brand Furniture Luxury 2-piece Sofa And Love Seat With Pink Jacquard Fabric/Gold Wood Frame

Trade Term
EXW / FOB shenzhen
MOQ
5 SETS
Payment Term
T/T, Ali trade assurance
Lead Time
30-35day after deposit received
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:




   PRODUCT  & PARAMETERS
INDUSTRY



PARAMETERS

Product name

Luxury sofa sets/ sectional sofa sets

Model no

CH 302

Frame material

Imported red beech

Material

Cotton and linen jacquard fabric, high density sponge

Color

Gold leafing

Feature

Eco-friendly Akzo nobel paint,

Dimension

1 seat : 990*880*1120H (mm)

38.9*34.6*44 inch


2 seat : 1670*890*1170H (mm)

65.7*35*46 inch


3 seat: 2040*1000*1170H (mm)

80.3*39.4*46 inch

Loading qty

5 sets / 20GP , 14 sets / 40HQ

Packing details

Standard export carton box with wood frame packing



   PRODUCT  DESCRIPTION
INDUSTRY




Product features


- Elegant cambered wood frame, “sandwich”seating structure make it more soft and comfortable
- High density cotton and linen jacquard fabric
- Imported red beech solid wood
- Pure hand made gold foil/leaf
- 3D carved pattern
- High density resilience sponge





   PRODUCT  DETAILS
INDUSTRY


Seating structure
Elegant cambered wood frame, “sandwich”seating structure make it more soft and comfortable.
Wood frame
Imported red beech solid wood, rare, precious,  with good impact resistance.
Leg

3D carved pattern, pure hand made gold foil/leaf. 

High density resilience sponge
   PACKING  & SERVICES
INDUSTRY



After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Personalized
Provide personalized service for customers according to the needs of different customers.
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.




Product Message
社媒暂无评论
Contact