Home  > PRODUCT  > Living Room Furniture  > Living room antique cabinet  >  Carelli Brand Furniture Comprehensive Function Bookshelf/Display Cabinet In Beech Wood
Carelli Brand Furniture Comprehensive Function Bookshelf/Display Cabinet In Beech Wood

Carelli Brand Furniture Comprehensive Function Bookshelf/Display Cabinet In Beech Wood

Trade Term
EXW / FOB shenzhen
MOQ
5 SETS
Payment Term
T/T, Ali trade assurance
Lead Time
30-35day after deposit received
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Related Products




   PRODUCT  & PARAMETERS
INDUSTRY



PARAMETERS

Product name

Display cabinet

Model no

CH 1701 cabinet

Frame material

Imported Zingana 

Color

Natural gold and black color

Feature

Eco-friendly Akzo nobel paint,

Over dimension (Vertical)

1000*360*2000H (mm)

39.4*14.2*78.7 inch

Over dimension (Horizontal)

2000*360*1000H (mm)

78.7*14.2*39.4 inch

Chest of 3 drawers

500*360*500H (mm)

19.7*14.2*19.7 inch

Chest of 6 drawers

500*360*1000H (mm)

19.7*14.2*39.4 inch

Two layers

500*360*1000H (mm)

19.7*14.2*39.4 inch

Four layers

500*360*1500H (mm)

19.7*14.2*59 inch

Loading qty

38 sets / 20’GP , 90 sets / 40’HQ

Packing details

Standard export carton box with wood frame packing



   PRODUCT  DESCRIPTION
INDUSTRY




Product features


- Natural unique wood texture
- Simple and elegant design
- Freely combine, not fit on the wall
- Strong frame structure





   PRODUCT  DETAILS
INDUSTRY


Ebony material
Glossy, straight texture, fine and uniform structure; hard wood, high strength.
storage
Multi-capacity large drawer storage space design, multiple storage space, convenient to classify daily debris
assembly

Freely combine, not fit on the wall, with flexible usage. 

   PACKING  & SERVICES
INDUSTRY



After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Personalized
Provide personalized service for customers according to the needs of different customers.
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.




Product Message
社媒暂无评论
Contact