Home  > PRODUCT  > Living Room Furniture  > Living room sofa  >  Carelli Brand Furniture Classic Elegance 3-seater Tufted Fabric Sofa Set With Wood Frame
Carelli Brand Furniture Classic Elegance 3-seater Tufted Fabric Sofa Set With Wood Frame

Carelli Brand Furniture Classic Elegance 3-seater Tufted Fabric Sofa Set With Wood Frame

Trade Term
EXW / FOB shenzhen
MOQ
5 SETS
Payment Term
T/T, Ali trade assurance
Lead Time
30-35day after deposit received
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:




   PRODUCT  & PARAMETERS
INDUSTRY



PARAMETERS

Product name

American style antique sofa sets/ solid wood frame sofa sets

Model no

CH 301

Frame material

Imported red beech

Material

Top grain cow leather with fabric, high density sponge

Color

Light burl walnut

Feature

Eco-friendly Akzo nobel paint,

Dimension

1 seat : 950*950*990H (mm)

37.4*37.4*39 inch

2 seat : 1650*950*1030H (mm)

65*37.4*40.5 inch

3 seat : 2010*950*1030H (mm)

79*37.4*40.5 inch

Loading qty

5 sets / 20’GP , 14 sets / 40’HQ

Packing details

Standard export carton box with wood frame packing



   PRODUCT  DESCRIPTION
INDUSTRY




Product features


- Imported top grain cow leather
- High density cotton and linen jacquard fabric
-Imported red beech solid wood
- Pure hand made gold foil/leaf
- 3D carved pattern

- High density resilience sponge





   PRODUCT  DETAILS
INDUSTRY


material
Back side use good flexibility artificial glossy leather, seating covered by smooth cotton & linen fabric.
 wood frame
Imported red beech solid wood, rare, precious,  with good impact resistance
leg

3D carved pattern, pure hand made gold foil/leaf. 

AkzoNobel painting
AkzoNobel painting is green painting, the advantage is that no poison, no pollution, no waste. Better protect your family member's health
   PACKING  & SERVICES
INDUSTRY



After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Personalized
Provide personalized service for customers according to the needs of different customers.
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.




Product Message
社媒暂无评论
Contact